 Issue dateTitleTopic
ML20217N39025 October 1999Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure
ML20217M87725 October 1999Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail StopProbabilistic Risk Assessment
ML20217L85921 October 1999Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation
ML20217M11819 October 1999Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates
ML20217M43319 October 1999Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates
ML20217N89115 October 1999Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl
ML20217D39513 October 1999Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02Safe Shutdown
Safe Shutdown Earthquake
ML20217D97113 October 1999Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure
ML20217F58413 October 1999Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco
ML20217F58113 October 1999Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys
ML20217F12612 October 1999Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104Safe Shutdown
BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station8 October 1999Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station
ML20217E1588 October 1999Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into SpecificationsHigh Radiation Area
ML20217C7328 October 1999Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals
ML20217C1507 October 1999Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant
BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl6 October 1999Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl
ML20217C3156 October 1999Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl
ML20217C8055 October 1999Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6)
ML20217D5595 October 1999Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function
ML20217B8625 October 1999Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan
ML20212J7894 October 1999Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant
ML20217B7471 October 1999Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl
ML20216J24730 September 1999Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701Enforcement Discretion
ML20216J24230 September 1999Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701Enforcement Discretion
ML20216J23830 September 1999Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & RequirementsEnforcement Discretion
ML20212J82730 September 1999Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl
ML20212K79230 September 1999Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility
ML20212J83030 September 1999Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six MonthsMain transformer failure
ML20212J65030 September 1999Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl
ML20216J35329 September 1999Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring ProcessMaintenance Rule Program
ML20216J99629 September 1999Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790
BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-1728 September 1999Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17
ML20212J03024 September 1999Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp DiscussedCondition Adverse to Quality
ML20212F78724 September 1999Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses
ML20212H13823 September 1999Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001
ML20212H14423 September 1999Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation
BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing21 September 1999Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing
BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested21 September 1999Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested
BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 121 September 1999Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1
ML20212G50721 September 1999Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation
ML20212C18820 September 1999Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs
BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal20 September 1999Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal
ML20212C16217 September 1999Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System
ML20212D14017 September 1999Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code
ML20212B95117 September 1999Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld
ML20212C28616 September 1999Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii)
ML20216F34516 September 1999Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12)
BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld16 September 1999Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls WithheldSafe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Earthquake
BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions16 September 1999Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions
ML20212C36215 September 1999Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4