Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
BSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)19 October 1999Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)
ML18017A92415 October 1999Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration
BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V35113 October 1999Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351
ML18017A91412 October 1999Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 TelconNon-Destructive Examination
Hydrostatic
VT-2
ML20217G1198 October 1999Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months
ML20217C6936 October 1999Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified
ML18017A9136 October 1999Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld
BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)4 October 1999Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)
BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl4 October 1999Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl
ML18017A89130 September 1999Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also
ML20212M10829 September 1999Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot ProgramSignificance Determination Process
ML20212J07429 September 1999Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence
ML20216G35029 September 1999Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence
ML18017A89429 September 1999Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves.Boric Acid
Operability Assessment
ML18017A88827 September 1999Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii)Fuel cladding
BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)23 September 1999Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)
BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)21 September 1999Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)
ML18017A88621 September 1999Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
ML18017A88214 September 1999Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6)
BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 199914 September 1999Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999
BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval14 September 1999Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval
ML18017A8658 September 1999Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & SafetyBoric Acid
VT-2
BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP8 September 1999Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP
ML18017A8583 September 1999Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage CapacityUltimate heat sink
Grab sample
Time to boil
Power Uprate
BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)2 September 1999Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)
BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld2 September 1999Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls WithheldLicense Renewal
BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1 September 1999Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, EnclNon-Destructive Examination
Liquid penetrant
ML18017A8551 September 1999Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TSOffsite Dose Calculation Manual
Process Control Program
ML20211K90027 August 1999Forwards Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs
BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl26 August 1999Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl
BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 225 August 1999Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2
BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl25 August 1999Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,EnclNon-Destructive Examination
Through-Wall Leak
BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)25 August 1999Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)
BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl20 August 1999Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl
ML18017A85420 August 1999Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided
HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.2118 August 1999Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21Safeguards Contingency Plan
BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl13 August 1999Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl
ML20210P82211 August 1999Advises That Info Contained in Which Submitted Document,Prepared by Siemens Power Corp,EMF-2168(P) Rev 0, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954Affidavit
BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant11 August 1999Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for PlantStress corrosion cracking
ML20210S90611 August 1999Informs That GE Document Entitled, Addl Info Regarding 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy ActAffidavit
ML20210S91211 August 1999Informs That Document NEDC-31624P,Suppl 2,Rev 6,entitled, Loss-Of-Coolant Accident Analysis Rept for Brunswick Steam Electric Plant Unit 2,Reload 13,Cycle 14 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5)Affidavit
ML20210P89110 August 1999Forwards SE Authorizing Relief Requests CIP-01,02,06,07,08, 09,10,11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Requests CIP-04 & 05 Would Result in Hardship,Relief CIP-03 Not Required & CIP-11 Denied in Part
ML20210P93810 August 1999Forwards SE Accepting Licensee & Suppls & 0517,which Submitted Assessment of Impact on Operation of Unit 1 with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers
ML18017A83510 August 1999Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment
ML18016B0536 August 1999Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl
ML20210P2035 August 1999Discusses Staff Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity for Plant,Units 1 & 2
BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 25 August 1999Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2Safe Shutdown
Fitness for Duty
Health Physics Network
Reactor Vessel Water Level
High Radiation Area
Probabilistic Risk Assessment
Severe Accident Management Guideline
Earthquake
Maintenance Rule Program
Fire Protection Program
Siren
Power Uprate
BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI5 August 1999Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI
ML20210N2045 August 1999Forwards SE Accepting Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46, & Suppl 1
ML20210Q4585 August 1999Informs That NRC Plans to Administer Generic Fundamentals Exam Section to Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit List of Individuals to Take exam,30 Days Before Exam DateGeneric Fundamentals Examination