Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.29 September 2023License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.Boric Acid
Time to boil
Aging Management
Surveillance Frequency Control Program
Fuel cladding
Exclusive Use
RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process7 June 2023Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement ProcessProbabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
RS-22-097, License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly31 August 2022License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test AssemblyShutdown Margin
Power change
RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.10 August 2022R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.Safe Shutdown
Non-Destructive Examination
Post Accident Monitoring
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Cyber Security
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fire Protection Program
ML22145A5863 June 2022R. E. Ginna Correction to Pages Issued for Amendments Nos. 225, 225, 227, 227, & 148, Respectively, Regarding Issues Identified in Westinghouse Documents
RS-22-037, License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control21 April 2022License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee ControlSafe Shutdown
Surveillance Frequency Control Program
ML20303A32529 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 2 of 5Safe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Pressure and Temperature Limits Report
Fuel cladding
Recently irradiated fuel
Fire Protection Program
ML20303A32729 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 4 of 5Time of Discovery
Offsite Dose Calculation Manual
Surveillance Frequency Control Program
Fire Protection Program
ML20303A32629 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 3 of 5
ML20303A32329 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 1 of 5Safe Shutdown
Anticipated operational occurrence
Abnormal operational transient
Earthquake
Fire Protection Program
RS-20-129, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 529 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 5Hydrostatic
Missed surveillance
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
RS-20-068, Application to Revise Technical Specifications 3.8.1, AC Sources-Operating26 June 2020Application to Revise Technical Specifications 3.8.1, AC Sources-OperatingSafe Shutdown
Stroke time
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability22 June 2020Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System OperabilityTime of Discovery
RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls26 June 2019Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative ControlsHigh Radiation Area
Locked High Radiation Area
Process Control Program
Deep Dose Equivalent
RS-09-071, Units 1 and 2 - License Amendment Request to Revise Technical Specifications (TS) for Permanent Alternate Repair Criteria24 June 2009Units 1 and 2 - License Amendment Request to Revise Technical Specifications (TS) for Permanent Alternate Repair CriteriaSafe Shutdown Earthquake
Nondestructive Examination
ML08239070721 August 2008Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating LicensesFire Protection Program
ML07354004919 December 2007Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement PagesSafeguards Contingency Plan
Fire Protection Program
RS-07-132, Stations, Units 1 and 2 - Application for Steam Generator Tube Alternate Repair Criteria Technical Specification Amendment29 November 2007Stations, Units 1 and 2 - Application for Steam Generator Tube Alternate Repair Criteria Technical Specification AmendmentNondestructive Examination
Finite Element Analysis
Liquid penetrant
Through-Wall Leak
RS-07-087, Request for License Amendment Related to Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.31 July 2007Request for License Amendment Related to Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.Offsite Dose Calculation Manual
RS-06-181, Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report15 December 2006Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report
ML06334048727 November 2006Tech Spec Pages for Amendments 148 & 142 Regarding Reactor Coolant System Pressure and Temperature Limits ReportPost Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
Recently irradiated fuel
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program29 November 2004Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity ProgramSafe Shutdown
Unanalyzed Condition
RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process30 April 2004Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process
ML04062006218 March 2004Technical Specifications Pages, Amendment #136
ML03269131522 September 2003Amended TS Pages Re the Surveillance Frequency of the Containment Spray System Nozzles from 10 Years to Following Maintenance Which Could Result in Nozzle Blockage, or Following Fluid Flow Through the Nozzles
ML02128029830 April 2002Byron/Braidwood, Units 1 and 2, Tech. Spec. Pages for Amendment Nos. 128 and 123 - Review Surveillance Requirement 3.0.3 to Extend the Delay Period, Before Entering a Limiting Condition for Operation Following a Missed SurveillanceTime of Discovery
Missed surveillance
ML02113026319 April 2002Units 1 & 2, Technical Specification Pages for License Amendment Nos. 127 & 122, Will Revise the Reactor Core Safety Limit for Peak Fuel Centerline Temperature
RS-02-045, Request for License Amendment for Technical Specifications Surveillance Requirement for Containment Spray Nozzles19 April 2002Request for License Amendment for Technical Specifications Surveillance Requirement for Containment Spray NozzlesForeign Material Exclusion
RS-02-028, Request for License Amendment for Technical Specifications - DC Electrical Power Systems8 March 2002Request for License Amendment for Technical Specifications - DC Electrical Power SystemsSafe Shutdown
Anticipated operational occurrence
Enforcement Discretion
Battery sizing