Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. | 29 September 2023 | License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. | Boric Acid Time to boil Aging Management Surveillance Frequency Control Program Fuel cladding Exclusive Use |
RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process | 7 June 2023 | Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process | Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program |
RS-22-097, License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly | 31 August 2022 | License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly | Shutdown Margin Power change |
RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. | 10 August 2022 | R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. | Safe Shutdown Non-Destructive Examination Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Cyber Security Pressure and Temperature Limits Report Surveillance Frequency Control Program Fire Protection Program |
ML22145A586 | 3 June 2022 | R. E. Ginna Correction to Pages Issued for Amendments Nos. 225, 225, 227, 227, & 148, Respectively, Regarding Issues Identified in Westinghouse Documents | |
RS-22-037, License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | 21 April 2022 | License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Safe Shutdown Surveillance Frequency Control Program |
ML20303A325 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 2 of 5 | Safe Shutdown Shutdown Margin Ultimate heat sink Anticipated operational occurrence Post Accident Monitoring Pressure and Temperature Limits Report Fuel cladding Recently irradiated fuel Fire Protection Program |
ML20303A327 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 4 of 5 | Time of Discovery Offsite Dose Calculation Manual Surveillance Frequency Control Program Fire Protection Program |
ML20303A326 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 3 of 5 | |
ML20303A323 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 1 of 5 | Safe Shutdown Anticipated operational occurrence Abnormal operational transient Earthquake Fire Protection Program |
RS-20-129, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 5 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 5 | Hydrostatic Missed surveillance Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program |
RS-20-068, Application to Revise Technical Specifications 3.8.1, AC Sources-Operating | 26 June 2020 | Application to Revise Technical Specifications 3.8.1, AC Sources-Operating | Safe Shutdown Stroke time Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit |
JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 22 June 2020 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | Time of Discovery |
RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls | 26 June 2019 | Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls | High Radiation Area Locked High Radiation Area Process Control Program Deep Dose Equivalent |
RS-09-071, Units 1 and 2 - License Amendment Request to Revise Technical Specifications (TS) for Permanent Alternate Repair Criteria | 24 June 2009 | Units 1 and 2 - License Amendment Request to Revise Technical Specifications (TS) for Permanent Alternate Repair Criteria | Safe Shutdown Earthquake Nondestructive Examination |
ML082390707 | 21 August 2008 | Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses | Fire Protection Program |
ML073540049 | 19 December 2007 | Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages | Safeguards Contingency Plan Fire Protection Program |
RS-07-132, Stations, Units 1 and 2 - Application for Steam Generator Tube Alternate Repair Criteria Technical Specification Amendment | 29 November 2007 | Stations, Units 1 and 2 - Application for Steam Generator Tube Alternate Repair Criteria Technical Specification Amendment | Nondestructive Examination Finite Element Analysis Liquid penetrant Through-Wall Leak |
RS-07-087, Request for License Amendment Related to Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. | 31 July 2007 | Request for License Amendment Related to Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. | Offsite Dose Calculation Manual |
RS-06-181, Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report | 15 December 2006 | Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report | |
ML063340487 | 27 November 2006 | Tech Spec Pages for Amendments 148 & 142 Regarding Reactor Coolant System Pressure and Temperature Limits Report | Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Recently irradiated fuel |
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | 29 November 2004 | Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | Safe Shutdown Unanalyzed Condition |
RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 30 April 2004 | Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | |
ML040620062 | 18 March 2004 | Technical Specifications Pages, Amendment #136 | |
ML032691315 | 22 September 2003 | Amended TS Pages Re the Surveillance Frequency of the Containment Spray System Nozzles from 10 Years to Following Maintenance Which Could Result in Nozzle Blockage, or Following Fluid Flow Through the Nozzles | |
ML021280298 | 30 April 2002 | Byron/Braidwood, Units 1 and 2, Tech. Spec. Pages for Amendment Nos. 128 and 123 - Review Surveillance Requirement 3.0.3 to Extend the Delay Period, Before Entering a Limiting Condition for Operation Following a Missed Surveillance | Time of Discovery Missed surveillance |
ML021130263 | 19 April 2002 | Units 1 & 2, Technical Specification Pages for License Amendment Nos. 127 & 122, Will Revise the Reactor Core Safety Limit for Peak Fuel Centerline Temperature | |
RS-02-045, Request for License Amendment for Technical Specifications Surveillance Requirement for Containment Spray Nozzles | 19 April 2002 | Request for License Amendment for Technical Specifications Surveillance Requirement for Containment Spray Nozzles | Foreign Material Exclusion |
RS-02-028, Request for License Amendment for Technical Specifications - DC Electrical Power Systems | 8 March 2002 | Request for License Amendment for Technical Specifications - DC Electrical Power Systems | Safe Shutdown Anticipated operational occurrence Enforcement Discretion Battery sizing |