ML040620062

From kanterella
Jump to navigation Jump to search
Technical Specifications Pages, Amendment #136
ML040620062
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/18/2004
From: Dick G
NRC/NRR/DLPM/LPD3
To: Crane C
Exelon Generation Co
Shared Package
ML040610882 List:
References
Download: ML040620062 (3)


Text

SX System 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Essential Service Water (SX) System LCO 3.7.8 The following SX trains shall be OPERABLE:

a. Two unit-specific SX trains; and
b. One opposite-unit SX train for unit-specific support.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. -------- NOTES-------- A.1 --------NOTES--------

1. Not applicable to 1. Enter applicable Unit I during Conditions and repl~acement of the Required Actions SX suction of LCO 3.8.1, "AC isolation valves Sources-during Unit 2 Operating," for Refueling 11 while Emergency Diesel Unit 2 is in Generator made MODE 5, 6, or inoperable by SX.

defueled.

2. Enter applicable
2. Not applicable to Conditions and Unit 2 during Required Actions replacement of the of LCO 3.4.6, SX suction "RCS Loops-isolation valves MODE 4," for during Unit 1 Residual Heat Refueling 13 while Removal loops Unit 1 is in made inoperable MODE 5, 6, or by SX.

defueled.

Restore unit-specific 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> One unit-specific SX SX train to OPERABLE train inoperable. status.

(continued)

BYRON - UNITS 1 & 2 3.7.8 - 1 Amendment 136

SX System 3.7.8 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.- NOTES-------- B.1 -------- NOTES--------

1. Only applicable to 1. Enter applicable Unit 1 during Conditions and replacement of the Required Actions SX suction of LCO 3.8.1, "AC isolation valves Sources-during Unit 2 Operating," for Refueling 11 while Emergency Diesel Unit 2 is in Generator made MODE 5, 6, or inoperable by SX.

defueled.

2. Enter applicable
2. Only applicable to Conditions and Unit 2 during Required Actions replacement of the of LCO 3.4.6, SX suction "RCS Loops-isolation valves MODE 4," for during Unit 1 Residual Heat Refueling 13 while Removal loops Unit 1 is in made inoperable MODE 5, 6, or by SX.

defueled.

Restore unit-specific 144 hours0.00167 days <br />0.04 hours <br />2.380952e-4 weeks <br />5.4792e-5 months <br /> One unit-specific SX SX train to OPERABLE train inoperable. status.

C. Opposite-unit SX train C.1 ---------NOTE--------

inoperable. LCO 3.0.4 is not applicable.

Restore opposite-unit 7 days SX train to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, B AND or C not met.

D.2 Be inMODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> BYRON - UNITS 1 & 2 3.7.8 - 2 Amendment 136

SX System 3.7.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 -------------------NOTE--------------------

Isolation of SX flow to individual components does not render the SX System inoperable.

Verify each unit-specific SX manual, power 31 days operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.8.2 ------------------- NOTE--------------------

Not required when opposite unit is in MODE 1, 2, 3, or 4.

Operate the opposite-unit SX pump for 31 days

Ž 15 minutes.

SR 3.7.8.3 Cycle each opposite-unit SX crosstie valve 92 days that is not secured in the open position with power removed.

SR 3.7.8.4 Verify each unit-specific SX automatic 18 months valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.7.8.5 Verify each unit-specific SX pump starts 18 months automatically on an actual or simulated actuation signal.

BYRON - UNITS 1 & 2 3.7.8 - 3 Amendment 136