ML021130263

From kanterella
Jump to navigation Jump to search

Units 1 & 2, Technical Specification Pages for License Amendment Nos. 127 & 122, Will Revise the Reactor Core Safety Limit for Peak Fuel Centerline Temperature
ML021130263
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 04/19/2002
From: Mahesh Chawla
NRC/NRR/DLPM
To: Skolds J
Exelon Generation Co, Exelon Nuclear
Chawla, ML, NRR/DLPM/LPD III-2, 415-8371
References
TAC MB3011, TAC MB3012, TAC MB3013, TAC MB3014
Download: ML021130263 (2)


Text

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs In MODES 1 and 2, the combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in the COLR; and the following SLs shall not be exceeded.

2.1.1.1 In MODE 1, the Departure from Nucleate Boiling Ratio (DNBR) shall be maintained > 1.24 for the WRB-2 DNB correlation for a thimble cell and > 1.25 for the WRB-2 DNB correlation for a typical cell.

2.1.1.2 In MODE 2, the DNBR shall be maintained > 1.17 for the WRB-2 DNB correlation, and Ž 1.30 for the W-3 DNB correlation.

2.1.1.3 In MODES 1 and 2, the peak fuel centerline temperature shall be maintained < 5080 0 F, decreasing by 58°F per 10,000 MWD/MTU burnup.

2.1.2 RCS Pressure SL In MODES 1, 2, 3, 4, and 5, the RCS pressure shall be maintained psig. S2735 2.2 SL Violations 2.2.1 If SL 2.1.1 is violated, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2 If SL 2.1.2 is violated:

2.2.2.1 In MODE 1 or 2, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2.2 In MODE 3, 4, or 5, restore compliance within 5 minutes.

BYRON - UNITS 1 & 2 2.0- 1 Amendment 127

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs In MODES 1 and 2, the combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in the COLR; and the following SLs shall not be exceeded.

2.1.1.1 In MODE 1, the Departure from Nucleate Boiling Ratio (DNBR) shall be maintained > 1.24 for the WRB-2 DNB correlation for a thimble cell and > 1.25 for the WRB-2 DNB correlation for a typical cell.

2.1.1.2 In MODE 2, the DNBR shall be maintained > 1.17 for the WRB-2 DNB correlation, and Ž 1.30 for the W-3 DNB correlation.

2.1.1.3 In MODES 1 and 2, the peak fuel centerline temperature shall be maintained < 5080 0 F, decreasing by 580 F per 10,000 MWD/MTU burnup.

2.1.2 RCS Pressure SL In MODES 1, 2, 3, 4, and 5, the RCS pressure shall be maintained psig . S2735 2.2 SL Violations 2.2.1 If SL 2.1.1 is violated, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2 If SL 2.1.2 is violated:

2.2.2.1 In MODE 1 or 2, restore compliance and be in MODE 3 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

2.2.2.2 In MODE 3, 4, or 5, restore compliance within 5 minutes.

BRAIDWOOD - UNITS 1 & 2 2.0-1I Amendment 122