ML22145A586

From kanterella
Jump to navigation Jump to search

R. E. Ginna Correction to Pages Issued for Amendments Nos. 225, 225, 227, 227, & 148, Respectively, Regarding Issues Identified in Westinghouse Documents
ML22145A586
Person / Time
Site: Byron, Braidwood, Ginna  Constellation icon.png
Issue date: 06/03/2022
From: Joel Wiebe
NRC/NRR/DORL/LPL3
To: Rhoades D
Constellation Energy Generation
Wiebe J, NRR/DORL/LPL3
References
EPID L-2021-LLA-0066
Download: ML22145A586 (14)


Text

June 3, 2022 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; AND R. E. GINNA NUCLEAR POWER PLANT - CORRECTION TO PAGES ISSUED FOR AMENDMENTS NOS. 225, 225, 227, 227, AND 148, RESPECTIVELY, REGARDING ISSUES IDENTIFIED IN WESTINGHOUSE DOCUMENTS (EPID L-2021-LLA-0066)

Dear Mr. Rhoades:

By letter dated March 22, 2022 (Agencywide Documents Access and Management System Accession Package No. ML22026A489), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 225 to Renewed Facility Operating License No. NPF-72 and Amendment No. 225 to Renewed Facility Operating License No. NPF-77 for the Braidwood Station, Units 1 and 2, (Braidwood) respectively; Amendment No. 227 to Renewed Facility Operating License No. NPF-37 and Amendment No. 227 to Renewed Facility Operating License No. NPF-66 for the Byron Station, Unit Nos. 1 and 2, (Byron) respectively; and Amendment No. 148 to Renewed Facility Operating License No. DPR-18 for the R. E. Ginna Nuclear Power Plant (Ginna). The amendments are in response to your application dated April 7, 2021 (ML21097A226), as supplemented by letter dated August 13, 2021 (ML21225A005).

During final processing to make the documents publicly available, a dark, thick, line was inadvertently introduced on the Braidwood technical specification (TS) pages 3.2.1 - 1 and 3.2.1 - 4. Page 3.2.1 - 4 of both the Braidwood and Byron TSs have dark brackets around the four equations. The amendment number font on all the Braidwood and Byron TS pages is not consistent with the font used for the page text. Ginna TS page 3.2.1 - 2 was inadvertently issued with a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> completion time for B.3. Specifically, for:

Braidwood TS page 3.2.1 - 1, the dark line is removed and the amendment number font is corrected.

Braidwood TS page 3.2.1 - 2, the amendment number font is corrected.

Braidwood TS page 3.2.1 - 4, the dark line is removed, the four equations are reformatted to remove the dark brackets, and the amendment number font is corrected

D. Rhoades Byron TS page 3.2.1 - 1, the amendment number font is corrected Byron TS page 3.2.1 - 2, the amendment number font is corrected Byron TS page 3.2.1 - 4, the four equations on the page are reformatted to remove the dark brackets and the amendment number font is corrected The attachment to license Amendment No. 148 for the Ginna provided instructions to remove page 3.2.1 - 5. This page is a new page and there is no current page to remove.

Ginna TS page 3.2.1 - 2, corrects the B.3 completion time from 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The NRC staff has determined that these were inadvertent typographical or formatting errors and are entirely editorial in nature. The corrections do not change any of the conclusions in the safety evaluation associated with the amendments and do not change the associated notice to the public.

The corrected pages are enclosed and should be replaced as follows:

Remove Insert Braidwood TS page 3.2.1 - 1 Braidwood TS page 3.2.1 - 1 Braidwood TS page 3.2.1 - 2 Braidwood TS page 3.2.1 - 2 Braidwood TS page 3.2.1 - 4 Braidwood TS page 3.2.1 - 4 Byron TS page 3.2.1 - 1 Byron TS page 3.2.1 - 1 Byron TS page 3.2.1 - 2 Byron TS page 3.2.1 - 2 Byron TS page 3.2.1 - 4 Byron TS page 3.2.1 - 4 Ginna page replacement instructions Ginna page replacement instructions Ginna TS page 3.2.1 - 2 Ginna TS page 3.2.1 - 2 If you have any questions concerning this action, please contact me at (301) 415-6066 or by e-mail to Joel.Wiebe@nrc.gov.

Sincerely,

/RA/

Joel S. Wiebe, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, and 50-244

Enclosure:

Corrected Pages cc: Listserv

ENCLOSURE 1 BRAIDWOOD STATION, UNITS 1 AND 2, DOCKET NOS. 50-456 AND 457 CORRECTED PAGES TO LICENSE AMENDMENT NOS. 225 AND 225 TECHNICAL SPECIFICATIONS PAGES 3.2.1 - 1, 3.2.1 - 2, AND 3.2.1 - 4

FQ(Z) 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

LCO 3.2.1 FQ(Z), as approximated by FQC(Z) and FQW(Z), shall be within the limit specified in the COLR.

APPLICABILITY: MODE 1.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. FQC(Z) not within A.1 Reduce THERMAL POWER 15 minutes limit. 1% RTP for each 1% FQC(Z) exceeds limit.

AND A.2 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Neutron Flux-High trip setpoints 1%

for each 1% FQC(Z) exceeds limit.

AND A.3 Reduce Overpower T 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> trip setpoints 1%

for each 1% FQC(Z) exceeds limit.

AND A.4 Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2. THERMAL POWER above the limit of Required Action A.1 (continued)

BRAIDWOOD UNITS 1 & 2 3.2.1 1 Amendment 225

FQ(Z) 3.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. FQW(Z) not within B.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> limit. as specified in the COLR.

AND B.2 Reduce AFD limits as 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> specified in the COLR.

AND B.3 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Neutron Flux-High trip setpoints 1%

for each 1% that THERMAL POWER is limited below RATED THERMAL POWER by Required Action B.1.

AND B.4 Reduce Overpower T 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> trip setpoints 1%

for each 1% that THERMAL POWER is limited below RATED THERMAL POWER by Required Action B.1.

AND B.5 Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2. THERMAL POWER and AFD limits above the limits of Required Actions B.1 and B.2 C. Required Action and C.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

BRAIDWOOD UNITS 1 & 2 3.2.1 2 Amendment 225

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.2.1.2 -------------------NOTES-------------------

1. During power escalation at the beginning of each cycle, THERMAL POWER may be increased until an equilibrium power level has been achieved, at which a power distribution map is obtained.
2. If FQW(Z) measurements indicate that either the maximum over z [FQC(Z) / K(Z)]

OR maximum over z [FQW(Z)/ K(Z)]

has increased since the previous evaluation of FQC(Z) or if FQW(Z) is expected to increase prior to the next evaluation of FQC(Z) :

a. Increase FQW(Z) by the appropriate factor specified in the COLR and reverify FQW(Z) is within limits specified in the COLR; or
b. Repeat SR 3.2.1.2 once per 7 EFPD until either a. above is met or two successive flux maps indicate that the maximum over z [FQC(Z) / K(Z)]

and maximum over z [FQW(Z)/ K(Z)]

has not increased.

(continued)

BRAIDWOOD UNITS 1 & 2 3.2.1 4 Amendment 225

ENCLOSURE 2 Byron STATION, UNIT Nos. 1 AND 2, DOCKET NOS. 50-454 AND 456 CORRECTED PAGES TO LICENSE AMENDMENT NOS. 227 AND 227 TECHNICAL SPECIFICATIONS PAGES 3.2.1 - 1, 3.2.1 - 2, AND 3.2.1 - 4

FQ(Z) 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

LCO 3.2.1 FQ(Z), as approximated by FQC(Z) and FQW(Z), shall be within the limit specified in the COLR.

APPLICABILITY: MODE 1.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. FQC(Z) not within A.1 Reduce THERMAL POWER 15 minutes limit. 1% RTP for each 1% FQC(Z) exceeds limit.

AND A.2 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Neutron Flux-High trip setpoints 1%

for each 1% FQC(Z) exceeds limit.

AND A.3 Reduce Overpower T 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> trip setpoints 1%

for each 1% FQC(Z) exceeds limit.

AND A.4 Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2. THERMAL POWER above the limit of Required Action A.1 (continued)

BYRON UNITS 1 & 2 3.2.1 1 Amendment 227

FQ(Z) 3.2.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. FQW(Z) not within B.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> limit. as specified in the COLR.

AND B.2 Reduce AFD limits as 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> specified in the COLR.

AND B.3 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Neutron Flux-High trip setpoints 1%

for each 1% that THERMAL POWER is limited below RATED THERMAL POWER by Required Action B.1.

AND B.4 Reduce Overpower T 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> trip setpoints 1%

for each 1% that THERMAL POWER is limited below RATED THERMAL POWER by Required Action B.1.

AND B.5 Perform SR 3.2.1.1 Prior to increasing and SR 3.2.1.2. THERMAL POWER and AFD limits above the limits of Required Actions B.1 and B.2 C. Required Action and C.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

BYRON UNITS 1 & 2 3.2.1 2 Amendment 227

FQ(Z) 3.2.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.2.1.2 -------------------NOTES-------------------

1. During power escalation at the beginning of each cycle, THERMAL POWER may be increased until an equilibrium power level has been achieved, at which a power distribution map is obtained.
2. If FQW(Z) measurements indicate that either the maximum over z [FQC(Z) / K(Z)]

OR maximum over z [FQW(Z)/ K(Z)]

has increased since the previous evaluation of FQC(Z) or if FQW(Z) is expected to increase prior to the next evaluation of FQC(Z) :

a. Increase FQW(Z) by the appropriate factor specified in the COLR and reverify FQW(Z) is within limits specified in the COLR; or
b. Repeat SR 3.2.1.2 once per 7 EFPD until either a. above is met or two successive flux maps indicate that the maximum over z [FQC(Z) / K(Z)]

and maximum over z [FQW(Z)/ K(Z)]

has not increased.

(continued)

BYRON UNITS 1 & 2 3.2.1 4 Amendment 227

ENCLOSURE 3 R. E. GINNA NUCLEAR POWER PLANT, DOCKET NO. 50-244 CORRECTED PAGE TO LICENSE AMENDMENT NO. 148 PAGE REPLACEMENT INSTRUCTIONS AND TECHNICAL SPECIFICATIONS PAGE 3.2.1 - 2

FQ(Z) 3.2.1 CONDITION REQUIRED ACTION COMPLETION TIME


B.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

- NOTE -

POWER as specified in the Required Action B.5 shall COLR.

be completed whenever this Condition is entered.

AND B.2 Reduce AFD limits as 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B. () not within limits. specified in the COLR.

AND B.3 Reduce Power Range 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Neutron Flux - High trip setpoints 1% for each 1%

that THERMAL POWER is limited below RATED THERMAL POWER by Required Action B.1.

AND B.4 Reduce Overpower T trip 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> setpoints 1% for each 1%

that THERMAL POWER is limited below RATED THERMAL POWER by Required Action B.1.

AND B.5 Perform SR 3.2.1.1 and Prior to increasing SR 3.2.1.2. THERMAL POWER and AFD limits of Required Actions B.1 and B.2.

C. Required Action and C.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

R.E. Ginna Nuclear Power Plant 3.2.1-2 Amendment 148

ATTACHMENT TO LICENSE AMENDMENT NO. 148 RENEWED FACILITY OPERATING LICENSE NO. DPR-18 R. E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244 Replace the following pages of the Renewed Facility Operating License and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE INSERT License No. DPR-18 License No. DPR-18 Page 4 Page 4 TSs TSs 3.2.1 - 2 3.2.1 - 2 3.2.1 - 4 3.2.1 - 4 3.2.1 - 5

ML22145A586 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NAME JWiebe SRohrer NSalgado, RFK for DATE 05/25/2022 05/26/2022 06/02/2022 OFFICE NRR/DORL/LPL3/PM NAME JWiebe DATE 06/03/2022