RS-21-016, Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems

From kanterella
Jump to navigation Jump to search

Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems
ML21029A306
Person / Time
Site: Dresden, Peach Bottom  Constellation icon.png
Issue date: 01/29/2021
From: Simpson P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-21-016
Download: ML21029A306 (16)


Text

4300 Winfield Road Warrenville, IL 60555 Exelon Generation 630 65 7 2000 Office RS-21-016 10 CFR 50.90 January 29, 2021 U.S . Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station , Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.50-277. and 50-278

Subject:

Supplement to Application to Revise Technical Specifications to Adopt TSTF-566 , "Revise Actions for Inoperable RHR Shutdown Cooling Systems"

Reference:

Letter from P.R. Simpson (Exelon) to U.S. NRC, "Application to Revise Technical Specifications to Adopt TSTF-566, 'Revise Actions for Inoperable RHR Shutdown Cooling Systems'," dated April 13, 2020 (ML20104C104)

In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (EGC), proposed a change to the Technical Specifications (TS),

Appendix A of Facility Operating License (FOL) No. NPF-62 for Clinton Power Station , Unit 1, Renewed FOL Nos. DPR-19 and DPR-25 for Dresden Nuclear Power Station, Units 2 and 3, Renewed FOL No. DPR-59 for James A. FitzPatrick Nuclear Power Plant, Renewed FOL Nos. NPF-11 and NPF-18 for LaSalle County Station, Units 1 and 2, Renewed FOL No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2, Renewed FOL Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3, and Renewed FOL Nos. DPR-29 and DPR-30 for Quad Cities Nuclear Power Station, Units 1 and 2. The proposed changes are consistent with previously NRC-approved Industry/Technical Specifications Task Force Traveler 566 (TSTF-566), Revision 0, "Revise Actions for Inoperable RHR Shutdown Cooling Systems."

During preparation and review of clean TS pages to be submitted to the NRC, it was identified that the addition of the word "required" for the proposed new Required Action B.1 would result in improved consistency of wording within the TS for Dresden Nuclear Power Station and Peach Bottom Atomic Power Station. The updated marked-up TS pages for these two plants are included in Attachments 1 and 2, respectively. These pages supersede those included in the Reference for these two plants in their entirety.

EGC has reviewed the information supporting a finding of no significant hazards consideration , and the environmental consideration, that were previously provided to the NRC in Reference 1. EGC has concluded

January 29, 2021 U.S . Nuclear Regulatory Commission Page 2 that the information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92. In addition, EGC has concluded that the information in this supplemental letter does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b), EGC is notifying the State of Illinois and the State of Pennsylvania of this supplement to the proposed TS pages by transmitting a copy of this letter and its attachments to the designated State Officials.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Ms. Rebecca L. Steinman at (630) 657-2831 .

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 291h day of January 2021 .

Respectfully, Patrick R. Simpson Sr. Manager Licensing Exelon Generation Corporation , LLC Attachments:

1. Markup of Proposed Technical Specifications Pages for Dresden Nuclear Power Station
2. Markup of Proposed Technical Specifications Pages for Point Beach Atomic Power Station cc: NRC Regional Administrator, Region I NRC Regional Administrator, Region Ill NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Senior Resident Inspector - Peach Bottom Atomic Power Station Illinois Emergency Management Agency - Division of Nuclear Safety R. R. Janati , Pennsylvania Bureau of Radiation Protection

ATTACHMENT 1 Markup of Proposed Technical Specifications Pages For Dresden Nuclear Power Station Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 REVISED TECHNICAL SPECIFICATIONS PAGES 3.4. 7-1 3.4. 7-2 3.4.8-1 3.4.8-2

SOC System-Hot Shutdown 3 .4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Shutdown Cooling (SOC) System-Hot Shutdown LCO 3.4.7 Two SOC subsystems shall be OPERABLE, and, with no recirculation pump in operation, at lea st one SOC subsystem sha ll be in operation.

- - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - -

1. Both required SOC subsystems and recirculation pumps may be not in operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required SOC subsystem may be inoperab l e for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.

APPLICABILITY: MODE 3, with reactor vesse l coolant temperature less than the SOC cut -in permissive temperature.

ACTIONS

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N0TE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Ir Separate Cond iti on entry is allowed for each SOC subsystem. /'f CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required IAitiate actioA to Iff!ff!edi ately SOC subsystems FestsFe Fe~l:liFed SOC inoperable. s1:Jbsysteffl( s) to OPERABLE stat1:Js .

(continued)

Dresden 2 and 3 3.4.7-1 Amendment No. 212/204

SOC System-Hot Shutdown 3.4.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) Verify an alternate 1 hour method of decay heat removal is available for each inoperable required SOC subsystem. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Be iA MODE zq q_ AOl:ff S

!i mmediately I

- No required SOC Initiate action to Immediately subsystem in restore one required operation. SOC subsystem or one

. recirculation pump to AND operation.

No recirculation in operation.

Verify reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from coolant circulation discovery of no by an alternate reactor coolant B. Required Action method. circulation and associated Completion Time of Condition A not met. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.1 Initiate action to thereafter restore required SOC subsystem(s) to OPERABLE status. Monitor reactor Once per hour coolant temperature and pressure.

Dresden 2 and 3 3.4.7-2 Amendment No. 185 /1 80

SOC System-Cold Shutdown 3 .4.8 3.4 REACTOR COOLANT SYS TEM (RCS) 3.4.8 Shutdown Cooling (SOC) System-Cold Shutdown LCO 3.4.8 Two SOC subsystems shal l be OPERABLE, and, with no recirculation pump in operation, at least one SOC subsystem sha ll be in operation.

- - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - -

1. Both required SOC subsystems may be not in operation during hydrostatic testing.
2. Both required SOC subsystems and recirculation pumps may be not in operat i on for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
3. One required SOC subsys tem may be inoperab l e for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveil lan ces.

APPLICABILITY: MODE 4.

AC TIONS

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTE- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Separate Condition entry is allowed for each shutdown coo ling subsystem .

CONDITION REQUIRED AC TION COMPLETION TIME A. One or two required A.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> soc subsystems method of decay heat inoperable. removal is available AND for each inoperable required SOC Once per subsystem . 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter 1r--. ~ .

(continued)

I B. Required Action B. 1 Initiate action to and associated restore required SOC IImmediately subsystem(s) to I

Completion Time of Condition A not met. OPERABLE status.

Dresden 2 and 3 3.4.8-1 Amendment No. 185 /1 80

SOC System-Cold Shutdown 3.4.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME No required SOC Verify reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from d

subsystem in coolant circulating discovery of no operation. by an alternate reactor coolant method. circulation No recirculation pump in operation. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter t

Monitor reactor Once per hour coolant temperature and pressure.

IC.2 I SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify one SOC subsystem or recirculation In accordance pump is operating. with the Surveillance Frequency Control Program SR 3.4.8.2 Verify SOC subsystem locations susceptible In accordance to gas accumulation are sufficiently filled with the with water. Surveillance Frequency Control Program Dresden 2 and 3 3.4.8-2 Amendment No. 2qq ; 237

ATTACHMENT 2 Markup of Proposed Technical Specifications Pages For Peach Bottom Atomic Power Station Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 REVISED TECHNICAL SPECIFICATIONS PAGES Peach Bottom Atomic Power Station. Unit 2 3.4-16 3.4-17 3.4-19 3.4-20 Peach Bottom Atomic Power Station. Unit 3 3.4-16 3.4-17 3.4-19 3.4-20

RHR Shutdown Cooling System-Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.

- - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - -

1. Both required RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for perfor mance of Survei 11 ances.

APPLICABILITY: MODE 3, with reactor steam dome pressure less than the RHR shutdown cooling isolation pressure.

ACTIONS

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTE- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Separate Condition entry is allowed for each RHR shutdown coo l ing subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A-:-+/- IAitiate actieA te lFAFACSi a tel)'

RHR shutdown cooling l"CStGl"C l"CEjl:Ji l"CS Rll R subsystems inoperable. SAl:JtSG '1/A ceel i A§l Sl:JBS)'StCFA( 5) te OPERABLE stahts .

(continued)

PBAPS UNIT 2 3.4-16 Amendment No. ~

RHR Shutdown Cooling System-Hot Shutdown 3.4.7 ACT IONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> method of decay heat removal is available for each required AND inoperable RHR Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> shutdown cooling thereafter subsystem.

Be i A MODE~ . 2~ AOl:ffS

~~ lm

~ m-ed

-i-at-e-ly~~~

£-..;- No RHR shutdown Initiate action to Immediately cooling subsystem in restore one RHR operation. shutdown cooling

~ AND subsystem or one recircu l ation pump to operation.

No in operation.

Verify reacto r 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from B. Required Action coolant circulation discovery of no and associated by an alternate reactor coolant Completion Time of method. circulation Condition A not met.

Once per B.1 Initiate action to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> restore required RHR thereafter shutdown cooling subsystem(s) to OPERABLE status.

Monitor reactor Once per hour coolant tempe r ature and pressure.

PBAPS UNIT 2 3.4-17 Amendment No. ~

RHR Shutdown Cooling System-Cold Shutdown 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System-Cold Shutdown LCO 3.4.8 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.

- - - - - - - - - - - - - - - - - - - - - - - - - - - -NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - -

1. Both required RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for perfor mance of Survei 11 ances.

APPLICABILITY: MODE 4.

ACT IONS

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTE- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Separate Condition entry is allowed for each RHR shutdown coo l ing subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A .1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> RHR shutdown cooling method of decay heat subsystems inoperable. removal is available for each inoperable required RHR shutdown Once per cooling subsystem. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> t hereafter

( (continued)

B. Required Action B. 1 Initiate action to and associated restore required RHR Completion Time of shutdown cooling IImmediately I Condition A not met. subsystem(s) to OPERABLE status.

PBAPS UNIT 2 3.4-19 Amendment No. ~

RHR Shu tdown Coo li ng System-Cold Shutdown

3. 4. 8 AC TIONS (continued)

COND IT ION REQUIR ED AC TI ON COMP LETI ON TIM E

~ No RHR shutdown -&-:-+ Ver i fy reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from

~ coo li ng subsys t em i n coolant ci rcu l ati ng di scovery of no operat i on . by an al ternate reactor coo l ant AND ~ met hod . ci rcu l at i on AN D No rec i rcu l at i on pump i n operat i on. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> therea f ter AND B-; Mon it or reactor Once per hour coo l ant temperature

~

and pressure.

SURVEI LLANC E REQU I REMENTS SURV EILL ANC E FR EQUE NCY SR 3.4 . 8. 1 Ver i fy one required RHR s hutdown cooling In accordance subsys t em or rec i rculat i on pump i s wit h the operating. Surve ill ance Frequency Contro l Program.

SR 3.4.8 . 2 - - - - - - - - - - - - - - - - - - -NOTE - - - - - - - - - - - - - - - - - - - -

HP SW system re l ated components are exc l uded.

Ver i fy requ i red RHR shutdown coo li ng In accordance subsys t em l ocat i ons suscept i ble to gas wi t h the accumu l at ion are suffic i ently f il led wi t h Survei 11 ance water. Frequency Contro l Program.

PBA PS UN IT 2 3. 4-20 Amendment No . ~

RHR Shutdown Cooling System-Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shal l be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - -

1. Both required RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be inopera ble for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Survei 11 ances.

APPLICABILITY: MODE 3, with reactor steam dome pressure less than the RHR shutdown cooling isolation pressure.

ACTIONS

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTE- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A-:4- I Aitiate actieA te l lfllfleE1i ate l ,y RHR shutdown cooling pestel"e l"CEjl:Ji l"CS Rll R subsystems inoperable. s~1:JtE1ewA cee l iA§ Sl:JBS)'Stelfl( 5) te OPERABLE stat1:Js .

(continued)

PBAPS UN IT 3 3.4-16 Amendment No. ~

RHR Shutdown Cooling System-Hot Shutdown 3.4.7 ACTIONS CONDITION REQUIRED ACT ION COMPLETION TIME A. (continued) Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> method of decay heat removal is available ~ AND for each required Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable RHR thereafter shutdown coo ling subsystem.

Be iA MODE 4. 24 A Ol:.11"5

~~lm ~m-e-d-ia-t-el-y~~~~

~ No RHR shutdown £--;-} Initiate action to Immediately cooling subsystem in restore one RHR

~ ~

operation. shutdown coo ling subsystem or one AND recirculation pump to operation .

No recirculation ump in operation. AND B. Required Action  : Verify reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from and associated coo lant circulation discovery of no

~

Completion Time of by an alternate reactor coo lant Condition A not method. circulation met.

AND 8 .1 Initiate action to Once per restore required RHR 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shutdown cooling thereafter subsystem(s) to OPERABLE status. AND Monitor reactor Once per hour coolant temperature and pressure.

PBAPS UN IT 3 3.4-17 Amendment No. +4

RHR Shutdown Cooling System-Cold Shutdown 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System-Cold Shutdown LCO 3.4.8 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTES- - - - - - - - - - - - - - - - - - - - - - - - - - -

1. Both required RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be inopera ble for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Survei 11 ances.

APPLICABILITY: MODE 4.

ACTIONS

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTE- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> RHR shutdown cooling method of decay heat subsystems inoperable. removal is ava i lable for each inoperable required RHR shutdown Once per cooling subsystem. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter 11\ I\

(continued)

8. 1 Initiate action to
8. Required Action restore required RHR IImmediately I and associated shutdown cooling Completion Time of subsystem(s) to Condition A not OPERABLE status.

met.

PBAPS UN IT 3 3.4-19 Amendment No. ~

RHR Shutdown Coo li ng System-Co l d Shutdown 3.4.8 ACT IONS (cont i nued)

COND IT ION REQUIR ED AC TI ON COMP LETI ON TI ME b-&-:- No RHR s hutdown cool i ng subsystem i n operat i on .

-&-:+ Ver ify reactor coo l an t c i rculat i ng by an alt ernate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fro m di scovery of no reactor coo l ant AN D No rec i rcu l at i on pump

~ method . ci rcu l at i on AND i n operat i on. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AN D

~ Mon i tor reac t or Once per hour I~ coo l ant t emperature and pressure.

rc21 SURV EILL ANC E REQ UI REMENTS SURV EI LLANC E FREQU ENCY SR 3 . 4.8.1 Ver i fy one requ i red RHR s hu tdow n coo li ng I n accordance subsystem or rec i rcu l at ion pump i s wit h t he opera ti ng . Surve ill ance Frequency Contro l Program .

SR 3.4.8.2 - - - - - - - - - - - - - - - - - - - NO TE - - - - - - - - - - - - - - - - - - - -

HPSW system re l ated co mponents are exc lu ded .

Ver ify requ i red RHR s hutdown cool i ng In accordance subsystem loca ti ons suscept i bl e to gas wit h t he accu mulatio n are suff i ci ent l y f i l l ed with Surve ill ance water . Frequency Contro l Program.

PBAPS UN IT 3 3. 4- 20 Amendment No . B-B