MONTHYEARRS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-041, Response to Request for Additional Information for Alternative Request RV-23H2023-03-14014 March 2023 Response to Request for Additional Information for Alternative Request RV-23H RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-004, Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request2023-01-23023 January 2023 Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-117, Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-11-0303 November 2022 Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-116, Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval2022-11-0101 November 2022 Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval RS-22-115, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-10-19019 October 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-066, License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2022-08-25025 August 2022 License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel2022-08-18018 August 2022 License Amendment Request Regarding Transition to GNF3 Fuel RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-101, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-102022-07-19019 July 2022 Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 RS-22-082, Defueled Safety Analysis Report Update, Revision 112022-06-22022 June 2022 Defueled Safety Analysis Report Update, Revision 11 RS-22-080, Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals2022-06-0909 June 2022 Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals RS-22-064, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.12022-06-0808 June 2022 License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-046, Relief Requests Associated with the Sixth Inservice Inspection Interval2022-03-25025 March 2022 Relief Requests Associated with the Sixth Inservice Inspection Interval RS-22-042, Report on Status of Decommissioning Funding for Shutdown Reactors2022-03-23023 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactors RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-21-009, Proposed Relief Request Associated with Code Case N-9212022-01-18018 January 2022 Proposed Relief Request Associated with Code Case N-921 RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-114, Request for Exemption from 10 CFR 2.109(b)2021-10-28028 October 2021 Request for Exemption from 10 CFR 2.109(b) RS-21-110, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-19019 October 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-103, Updated Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations for Byron Station and Dresden Nuclear Power Station2021-09-28028 September 2021 Updated Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations for Byron Station and Dresden Nuclear Power Station RS-21-097, Withdrawal of Certification of Permanent Cessation of Power Operations for Dresden Nuclear Power Station, Units 2 and 3, and Previously Submitted Licensing Actions in Support of Decommissioning2021-09-15015 September 2021 Withdrawal of Certification of Permanent Cessation of Power Operations for Dresden Nuclear Power Station, Units 2 and 3, and Previously Submitted Licensing Actions in Support of Decommissioning RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-086, Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E2021-08-23023 August 2021 Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel 2023-08-30
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-066, License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2022-08-25025 August 2022 License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel2022-08-18018 August 2022 License Amendment Request Regarding Transition to GNF3 Fuel RS-22-064, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.12022-06-0808 June 2022 License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-021, License Amendment Request - Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition2021-03-17017 March 2021 License Amendment Request - Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments RS-21-016, Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2021-01-29029 January 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML20323A2542020-11-18018 November 2020 Markup of Proposed Technical Specifications Bases Pages RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-132, License Amendment Request, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2020-10-29029 October 2020 License Amendment Request, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition RS-20-116, License Amendment Request - Proposed Changes to Unit 1 Technical Specifications Section 6.1, Responsibility, and Units 2 and 3 Technical Specifications 1.1, Definitions, and 5.0, Administrative2020-09-24024 September 2020 License Amendment Request - Proposed Changes to Unit 1 Technical Specifications Section 6.1, Responsibility, and Units 2 and 3 Technical Specifications 1.1, Definitions, and 5.0, Administrative RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process RS-20-025, Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2020-02-24024 February 2020 Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-19-093, Secondary Containment Drawdown Analysis2019-10-17017 October 2019 Secondary Containment Drawdown Analysis RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)2019-08-23023 August 2019 License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control2019-06-18018 June 2019 Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements RS-18-134, Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits2018-12-0505 December 2018 Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-18-032, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2018-04-25025 April 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) ML18053A1832018-01-31031 January 2018 Enclosure 4 - Dresden Units 1, 2 & 3 - Evaluation of Proposed Changes RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements ML18053A1732018-01-31031 January 2018 Attachment 4A - Dresden Marked-up Emergency Plan EP-AA-1000 Pages ML18053A1742018-01-31031 January 2018 Attachment 4B - Dresden Clean Emergency Plan EP-AA-1000 Pages RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-17-174, Additional Supplement to Dresden Nuclear Power Station, Units 2 and 3 - Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-12-21021 December 2017 Additional Supplement to Dresden Nuclear Power Station, Units 2 and 3 - Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RS-17-173, Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-12-20020 December 2017 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements RS-17-060, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-05-0303 May 2017 Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process RS-17-029, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-02-10010 February 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-16-199, Supplement to Request for License Amendment Regarding Transition to Areva Fuel2016-09-28028 September 2016 Supplement to Request for License Amendment Regarding Transition to Areva Fuel ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-16-105, Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel2016-04-26026 April 2016 Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings2016-02-0303 February 2016 County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings RS-16-016, Supplement to Request for License Amendment Regarding Transition to Areva Fuel2016-01-20020 January 2016 Supplement to Request for License Amendment Regarding Transition to Areva Fuel RS-15-237, Dresden Nuclear Power Station, Units 2 and 3/Quad Cities Nuclear Power Station, Units 1 and 2 - Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel2015-09-0101 September 2015 Dresden Nuclear Power Station, Units 2 and 3/Quad Cities Nuclear Power Station, Units 1 and 2 - Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel RS-15-237, /Quad Cities Nuclear Power Station, Units 1 and 2 - Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel2015-09-0101 September 2015 /Quad Cities Nuclear Power Station, Units 1 and 2 - Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel RS-15-108, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2015-08-18018 August 2015 Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. 2023-05-25
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-22-066 10 CFR 50.90 August 25, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249
Subject:
License Amendment Request to Revise Technical Specification 3.1.4, "Control Rod Scram Times" In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Constellation Energy Generation, LLC (CEG) requests an amendment to Renewed Facility Operating License Nos. DPR-19 and DPR-25 for Dresden Nuclear Power Station (DNPS), Units 2 and 3, respectively. Specifically, the proposed change would revise control rod scram time limits in DNPS Technical Specifications (TS) Table 3.1.4-1 to regain margin for reactor vessel overpressure. provides a description and assessment of the proposed changes. Attachment 2 provides the existing TS page marked-up to show the proposed TS changes. There are no TS Bases changes associated with the corresponding TS change.
The proposed changes have been reviewed and approved by the Plant Operations Review Committee at DNPS in accordance with the requirements of the CEG Quality Assurance Program.
CEG requests approval of the proposed changes by August 25, 2023. Once approved, the amendment shall be implemented within 60 days.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"
paragraph (b), CEG is notifying the State of Illinois of this application for license amendment by transmitting a copy of this letter and its attachments to the designated State Officials.
There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mrs. Linda M. Palutsis at (630) 657-2821.
August 25, 2022 U.S. Nuclear Regulatory Commission Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 25th day of August 2022.
Respectfully, Patrick R. Simpson Sr. Manager Licensing Constellation Energy Generation, LLC Attachments:
- 1. Evaluation of Proposed Changes
- 2. Markup of Proposed Technical Specifications Pages cc: U.S. NRC Region III, Regional Administrator U.S. NRC Senior Resident Inspector, Dresden Nuclear Power Station Illinois Emergency Management Agency - Division of Nuclear Safety
ATTACHMENT 1 Evaluation of Proposed Changes
Subject:
License Amendment Request to Revise Technical Specification 3.1.4, "Control Rod Scram Times" TABLE OF CONTENTS 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION
3.0 TECHNICAL EVALUATION
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration 4.4 Conclusion
5.0 ENVIRONMENTAL CONSIDERATION
6.0 REFERENCES
Page 1 of 6
ATTACHMENT 1 Evaluation of Proposed Changes 1.0
SUMMARY
DESCRIPTION In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Constellation Energy Generation, LLC (CEG) requests an amendment to Renewed Facility Operating License Nos. DPR-19 and DPR-25 for Dresden Nuclear Power Station (DNPS), Units 2 and 3, respectively. Specifically, the proposed change would revise control rod scram time limits in DNPS Technical Specifications (TS) Table 3.1.4-1 to regain margin for reactor vessel overpressure.
2.0 DETAILED DESCRIPTION The proposed change would revise control rod scram time limits in DNPS TS Table 3.1.4-1, as indicated below, to regain margin for reactor vessel overpressure. The revision of the numerical values of the scram insertion speeds also results in a change to an input parameter to the NRC approved ODYN based transient methodology (References 6.3, 6.4, and 6.5) for determining the Operating Limit Minimum Critical Power Ratio (OLMCPR). ODYN is a calculational model included in the General Electric Standard Application for Reactor Fuel (GESTAR-II, Reference 6.6). Since GESTAR-II is already part of the DNPS licensing basis, this methodology change does not require a corresponding TS change.
CURRENT SCRAM TIMES REVISED SCRAM TIMES PERCENT INSERTION (seconds) (seconds) 5 0.48 0.45 20 0.89 0.85 50 1.98 1.80 90 3.44 3.00 contains a marked-up version of the DNPS, Units 2 and 3 TS showing the proposed changes to Table 3.1.4-1. There are no corresponding changes to the TS Bases.
3.0 TECHNICAL EVALUATION
DNPS plans to load GNF3 fuel into Unit 2 during the fall 2023 refueling outage and into Unit 3 the following fall. The fuel transition requires a new set of scram times to support improvements on the margin to the American Society of Mechanical Engineers (ASME) Code reactor vessel overpressure limit.
The scram function of the Control Rod Drive (CRD) System controls reactivity changes during anticipated operational occurrences (AOOs) to ensure that specified acceptable fuel design limits are not exceeded. The Design Basis Accident (DBA) and transient analyses assume that all control rods scram at a specified insertion rate. The resulting negative scram reactivity forms the basis for the determination of plant thermal limits (e.g., the minimum critical power ratio (MCPR)). Other distributions of scram times (e.g., several control rods scramming slower than the average time with several control rods scramming faster than the average time) can also provide sufficient scram reactivity. Surveillance of each individual control rod's scram time Page 2 of 6
ATTACHMENT 1 Evaluation of Proposed Changes ensures the scram reactivity assumed in the DBA and transient analyses can be met.
At 800 psig, the scram function is designed to insert negative reactivity at a rate fast enough to prevent the actual MCPR from becoming less than the MCPR Safety Limit, during the analyzed limiting power transient. Below 800 psig, the scram function is assumed during the control rod drop accident to provide protection against violating fuel design limits during reactivity insertion accidents. For the reactor vessel overpressure protection analysis, the scram function, along with the safety/relief valves, ensure that the peak vessel pressure is maintained within the applicable ASME Code limits.
Based on the evaluations performed in an analysis carried out by Global Nuclear Fuels -
America, LLC (GNF), modifications to the scram speed profiles can be used to regain overpressure margin. The proposed changes do not affect the design, functional performance, or normal operation of the facility. Similarly, it does not affect the design or operation of any component in the facility such that new equipment failure modes are created.
The determination of the revised Dresden TS scram speed limits utilizes the General Electric (GE) transient calculation methodology involving the ODYN computer code (Reference 6.3).
This methodology was previously approved by the NRC in References 6.4 and 6.5. The methodology described in Reference 6.3 applies two scram time options in the calculation of the MCPR operating limits. The Option A analysis directly applies the TS scram time values, and an NRC-imposed uncertainty factor and Option B applies a generic statistical scram time distribution. Licensees are required to demonstrate that the actual scram speeds bound the generic statistical scram times in Option B or operate with a higher limit (i.e., a penalty). The proposed revision of the TS scram time values described in Section 2 is based on the Option A method using a 1.044 code uncertainty penalty. The uncertainty consideration in the calculation of the OLMCPR ensures that less than 0.1% of the fuel rods will experience boiling transition during the transient (Reference 6.6).
Existing TS Surveillance Requirements (SRs) for each individual control rod's scram time ensures the scram reactivity assumed in the DBA and transient analyses can be met. These SRs are sufficient to ensure that the plant operates under the ODYN Option A or B operating limits for pressurization events.
All cores containing GNF3 fuel will be analyzed with the revised TS scram times resulting in the development of the fuel cycle dependent MCPR operating limits.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria TS 3.1.4, "Control Rod Scram Times" satisfies the following regulatory requirements:
10 CFR 50.36(c)(2)(ii)(C) Criterion 3 A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or Page 3 of 6
ATTACHMENT 1 Evaluation of Proposed Changes presents a challenge to the integrity of a fission product barrier.
10 CFR 50 Appendix A, GDC 10 - Reactor Design The reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded during any condition of normal operation, including the effects of anticipated operational occurrences.
The original design of DNPS, Units 2 and 3, was reviewed and approved against the draft General Design Criteria (GDC) issued in July 1967. Updated Final Safety Analysis Report (UFSAR), Section 3.1, "Conformance with NRC General Design Criteria," provides an assessment against the 70 draft GDC published in 1967 and concluded that the plant specific requirements are sufficiently similar to the Appendix A GDC. Therefore, the equivalent draft GDC used at DNPS is functionally equivalent to 10 CFR 50 Appendix A, GDC 10.
4.2 Precedent The Dresden scram speeds were previously revised to reflect using the GE methodology for specifying the TS time limits during a prior fuel transition to GE14 fuel in 2001 (ADAMS Accession Nos. ML003756771 and ML012950202, References 6.7 and 6.8). The current proposed revision of the values of the TS limits reflects the differences between GE14 and GNF3 fuel using the same NRC-approved GE methodology.
4.3 No Significant Hazards Consideration In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Constellation Energy Generation, LLC (CEG) requests an amendment to Renewed Facility Operating License Nos. DPR-19 and DPR-25 for Dresden Nuclear Power Station (DNPS), Units 2 and 3, respectively. Specifically, the proposed change would revise control rod scram time limits in DNPS Technical Specifications (TS) Table 3.1.4-1 to regain margin for reactor vessel overpressure.
CEG has evaluated the proposed change against the criteria of 10 CFR 50.92(c) to determine if the proposed change results in any significant hazards. The following is the evaluation of each of the 10 CFR 50.92(c) criteria:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The requested changes to the TS Table 3.1.4-1 scram times are based on ensuring that the analytical approach utilized by Global Nuclear Fuels - America LLC (GNF) is met.
There are no other changes to TS 3.1.4 (e.g., the number of slow rods allowed is unchanged). A scram time slower than required might result in an increase in the consequences of an accident. The CEG proposed changes do not constitute an increase to any consequences to any accidents because the revised allowed scram Page 4 of 6
ATTACHMENT 1 Evaluation of Proposed Changes times are bounded by the GNF analysis which demonstrates that all required limits are met.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change does not affect the design, functional performance, or normal operation of the facility. Similarly, it does not affect the design or operation of any component in the facility such that new equipment failure modes are created.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No Sufficiently rapid insertion of control rods following certain accidents (scram time) will prevent fuel damage, and thereby maintain a margin of safety to fuel damage. The proposed change to the control rod scram time limits does not constitute a change in the operation of the facility and hence do not involve a significant reduction in the margin of safety.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, CEG concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
4.4 Conclusion In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
The proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change Page 5 of 6
ATTACHMENT 1 Evaluation of Proposed Changes an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 REFERENCES
6.1 Dresden Nuclear Power Station, Units 2 and 3 Technical Specifications 6.2 Dresden Nuclear Power Station Updated Final Safety Analysis Report (UFSAR),
Revision 14, dated June 2021 6.3 NEDO-24154, "Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors," dated October 1978 (ADAMS Accession No. ML19269C819) 6.4 "Safety Evaluation for the General Electric Topical Report Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors, NEDO-24154 and NEDE-24154-P, Volumes I, II, and III," dated June 1980 (ADAMS Accession No. ML03121015) 6.5 "Supplemental Safety Evaluation for the General Electric Topical Report Qualification of the One-Dimensional Core Transient Model for Boiling Water Reactors, NEDO-24154 and NEDE-24154-P, Volumes I, II, and III," dated January 1981 (ADAMS Accession No. ML031210226) 6.6 General Electric Licensing Topical Report NEDE-24011-P-A, "General Electric Standard Application for Reactor Fuel, (GESTAR II Base Document (NEDE-24011-P-A, Main)," Revision 31, dated November 2020 (ADAMS Accession No. ML20330A199 for the non-proprietary version) 6.7 Letter from R.M. Krich (Commonwealth Edison (ComEd)) to U. S. NRC, "Request for Technical Specifications Change, Transition to General Electric Fuel," dated September 29, 2000 (ADAMS Accession No. ML003756771) 6.8 Letter from S. Bailey (U. S. NRC) to O. Kingsley (Exelon Generation Company, LLC),
"Issuance of Amendments (TAC NOS. MB0170, MB0171, MB1337, MB1338, MB2715, and MB2716," dated November 2, 2001 (ADAMS Accession No. ML012950202)
Page 6 of 6
ATTACHMENT 2 Markup of Proposed Technical Specifications Page Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 REVISED TECHNICAL SPECIFICATIONS PAGE 3.1.4-3
Control Rod Scram Times 3.1.4 Table 3.1.4-1 (page 1 of 1)
Control Rod Scram Times
NOTES -----------------------------------
- 1. OPERABLE control rods with scram times not within the limits of this Table are considered "slow."
- 2. Enter applicable Conditions and Required Actions of LCO 3.1.3, "Control Rod OPERABILITY," for control rods with scram times 7 seconds to 90%
insertion. These control rods are inoperable, in accordance with SR 3.1.3.4, and are not considered "slow."
SCRAM TIMES(a)(b)(seconds) when REACTOR STEAM DOME PERCENT INSERTION PRESSURE 800 psig 5 0.48 0.45 20 0.89 0.85 50 1.98 1.80 90 3.44 3.00 (a) Maximum scram time from fully withdrawn position based on de-energization of scram pilot valve solenoids at time zero.
(b) Scram times as a function of reactor steam dome pressure when 800 psig are within established limits.
Dresden 2 and 3 3.1.4-3 Amendment No. 220/211