Exelon Generation July 10, 2018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com Peach Bottom Atomic Power Station, Units 2 and 3

Subject:

Renewed Facility Operating License Nos. DPR-44 and DPR-56 N RC Docket Nos. 50-277 and 50-278 Application for Subsequent Renewed Operating Licenses 10 CFR 50 10 CFR 51 10 CFR 54 Pursuant to the Code of Federal Regulations, Title 1 O, Parts 50, 51, and 54, Exelon Generation Company, LLC (Exelon) hereby applies for the renewal of the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, Renewed Facility Operating Licenses, Nos. DPR-44 and DPR-56, respectively.

The existing PBAPS renewed facility operating licenses are currently set to expire as follows:

  • At midnight on August 8, 2033 for Unit 2 (Facility Operating License No. DPR-44)
  • At midnight on July 2, 2034 for Unit 3 (Facility Operating License No. DPR-56)

Exelon seeks to extend the respective operating terms by 20 years beyond the current renewed license expiration dates.

The enclosed Subsequent License Renewal Application (SLRA) contains the information required by the License Renewal regulations set forth in 1 O CFR Parts 54 and 51, and meets the submittal timeliness requirements of 10 CFR 54.17(c) and 10 CFR 2.109(b).

As required by 1 O CFR 54.21 (b), current licensing basis changes which have a material effect on the content of this application will be identified annually while the application is under NRC review, and at least three months prior to the scheduled completion of the NRC review.

Appendix A, Section A.5, of the enclosed PBAPS SLRA provides a list of commitments made in this application. This list will be updated as required throughout the SLRA review process.

U.S. Nuclear Regulatory Commission

  • Subsequent Renewed Operating Licenses Docket Nos. 50-277 and 50-278 July 1 O, 2018 Page 2 In accordance with 1 O CFR Part 50, Appendix H, and NUREG-2192, "Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants," an update to the PBAPS reactor surveillance capsule withdrawal schedule addressing the subsequent (i.e.,

second) period of extended operation is included within this submittal, for NRC approval. The capsule withdrawal schedule is provided in Enhancement 1 of the Reactor Vessel Material Surveillance program, as shown in SLRA Sections A.2.1.20, A.5 (Commitment 20), and 8.2.1.20.

The enclosed SLRA is being submitted electronically. A total of one (1) CD-ROM is included in this electronic submission. The CD-ROM labeled "PB_SLRA" contains the following six (6) files:

001 _PB_SLRA.pdf 8,881,000 bytes, publicly available 002 _PB_ERMain.pdf 89,563,000 bytes, publicly available 003 _PB_ER_AppA_B.pdf 31,183,000 bytes, publicly available 004 _PB_ER_AppC1_Part_ 1_of_2_;pdf 75,043,000 bytes, publicly available 005 _PB_ER_AppC1 _Part_2_of_2_.pdf 96,107,000 bytes, publicly available 006 _PB_ER_AppC2_C3_D_E.pdf 20,633,000 bytes, publicly available Exelon has reviewed all information contained in the above files and verified that none of the information is marked as proprietary.

If you have any questions, please contact:

Name Mailing Address E-Mail Address Phone Number John Hilditch 200 Exelon Way Kennett Square, PA 19348 john.hilditch@exeloncorp.com 61 0-765-5373 I declare under penalty of perjury that the foregoing is true and correct.

Executed on _tJ_7_-_l._"_-_'2ol g Respectfully, rt!:ltt://~ -

Vice President - License Renewal and Decommissioning Exelon Generation Company, LLC

U.S. Nuclear Regulatory Commission Subsequent Renewed Operating Licenses Docket Nos. 50-277 and 50-278 July 10, 2018 Page 3

Enclosure:

CD-ROM labeled "PB_SLRA" cc:

without Enclosure Regional Administrator - NRC Region I NRC Project Manager (Safety Review), NRR-DMLR NRC Project Manager (Environmental Review), NRR-DMLR NRC Project Manager, NRR-DORL - Peach Bottom Atomic Power Station NRC Senior Resident Inspector, Peach Bottom Atomic Power Station R.R. Janati, Manager, BRP Nuclear Safety Program, Pennsylvania Department of Environmental Protection S.T. Gray, Deputy Division Director PPAD, Maryland Department of Natural Resources