RS-17-059, Clinton Power Station, Unit 1, Submittal of Revisions to Radiological Emergency Plan

From kanterella
Jump to navigation Jump to search
Clinton Power Station, Unit 1, Submittal of Revisions to Radiological Emergency Plan
ML17128A037
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/26/2017
From: David Gudger
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17128A023 List:
References
RS-17-059
Download: ML17128A037 (2)


Text

200 Exelon Way Exelon Generation Kennett Square, PA 19348 www.exeloncorp.com RS-17-059 April 26, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 10 CFR 50.54(q)(5).

10 CFR 50.4 10 CFR 72.44(f) Facility Operating License No. NPF-62 NRG Docket No. 50-461

Subject:

Exelon Generation Company Radiological Emergency Plan Revision In accordance with 1 O CFR 50.4(b)(5), "Emergency plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting Emergency Plan revision documentation listed in the table below for Clinton Power Station, Unit 1 (Clinton).

Procedure No. Revision Title EP-AA-1003 27 Radiological Emergency Plan Annex for Clinton Station EP-CL-1000 (superseded) 0 Clinton Emergency Plan EP-AA-1000 (reinstituted) 28 Exelon Nuclear Standardized Radiological Emergency Plan The changes to the Clinton Emergency Plan were evaluated under the requirements of 1 O CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for Clinton. This notification is being submitted within 30 days of implementation of the changes as required by 1 O CFR 50.54(q)(5).

The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

  • In addition, as required by 1 o CFR 50.54(q)(5), Attachment 1 of this submittal includes a summary analysis of the changes to the Emergency Plan. This submittal also satisfies the reporting requirements associated with 1 o CFR 72.44(f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management.

U.S. Nuclear Regulatory Commission Emergency Plan Revision Docket No. 50-461 April 26, 2017 Page2 There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respenttully, _ 1

  • I . ci:l_-J )A--David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:
1. 1 O CFR 50.54(q)(5)

Procedure Change Summary Analysis 2. EP-AA-1003, Revision 27, "Radiological Emergency Plan Annex for Clinton Station" 3. EP-AA-1000, Revision 28, "Exelon Nuclear Standardized Radiological Emergency Plan" cc: w/ Attachment 1 only Regional Administrator-NRC Region Ill Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector

-Clinton Power Station NRC Project Manager, NRR -Clinton Power Station Illinois Emergency Management Agency -Division of Nuclear Safety