RS-17-059, Submittal of Revisions to Radiological Emergency Plan
ML17128A037 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 04/26/2017 |
From: | David Gudger Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML17128A023 | List: |
References | |
RS-17-059 | |
Download: ML17128A037 (2) | |
Similar Documents at Clinton | |
---|---|
Category:Emergency Preparedness-Emergency Plan
MONTHYEARRS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022
[Table view]Constellation Radiological Emergency Plan Addendum Revision ML22139A2552022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum and Procedure Revision WBL-21-046, Unit 2 -Emergency Plan Implementing Procedure Revision2021-09-30030 September 2021 Unit 2 -Emergency Plan Implementing Procedure Revision RS-20-137, Company Emergency Plan Addendum Revisions2020-11-10010 November 2020 Company Emergency Plan Addendum Revisions ML20316A0042020-11-10010 November 2020 EP-AA-1003, Addendum 3, Revision 3, Emergency Action Levels for Clinton Station ML20316A0052020-11-10010 November 2020 EP-AA-1001, Addendum 3, Revision 4, Emergency Action Levels for Clinton Station ML20316A0062020-11-10010 November 2020 EP-AA-1001, Addendum 3, Revision 5, Emergency Action Levels for Clinton Station RS-19-022, License Amendment Request - Clarifying Changes for Certain Emergency Action Levels Based on Emergency Preparedness Program Frequently Asked Questions (Epfaqs)2019-03-0101 March 2019 License Amendment Request - Clarifying Changes for Certain Emergency Action Levels Based on Emergency Preparedness Program Frequently Asked Questions (Epfaqs) ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML18053A1822018-01-31031 January 2018 Enclosure 3 - Clinton Power Station, Unit 1 - Evaluation of Proposed Changes ML18053A1712018-01-31031 January 2018 Attachment 3B - Clinton Power Station, Unit 1 - Clean Emergency Plan EP-AA-1000 Pages ML18053A1702018-01-31031 January 2018 Attachment 3A - Clinton Power Station, Unit 1 - Marked-up Emergency Plan EP-AA-1000 Pages RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-17-170, Company Emergency Plan Annex and Addendum Revisions2017-12-19019 December 2017 Company Emergency Plan Annex and Addendum Revisions ML17128A0382017-04-26026 April 2017 10CFR50.54(q)(5) Procedure Change Summary Analysis, Rev. 27 to EP-AA-1003, Radiological Emergency Plan Annex and Rev. 28 to EP-AA-1000, Standardized Radiological Emergency Plan. RS-17-059, Clinton Power Station, Unit 1, Submittal of Revisions to Radiological Emergency Plan2017-04-26026 April 2017 Clinton Power Station, Unit 1, Submittal of Revisions to Radiological Emergency Plan RS-17-059, Submittal of Revisions to Radiological Emergency Plan2017-04-26026 April 2017 Submittal of Revisions to Radiological Emergency Plan RS-16-217, Radiological Emergency Plan Addendum Revisions2016-10-25025 October 2016 Radiological Emergency Plan Addendum Revisions RS-16-143, Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition2016-08-11011 August 2016 Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition ML16229A2792016-08-11011 August 2016 Attachments 1 - 7: Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition RS-16-143, License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition2016-08-11011 August 2016 License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition RS-16-058, EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station.2016-03-28028 March 2016 EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station. ML16088A3962016-03-28028 March 2016 Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision RS-16-058, Clinton, Unit 1 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision2016-03-28028 March 2016 Clinton, Unit 1 - Transmittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision NEI 99-01, Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4B and 4C, Cl 3-74 - Cl 3-1512014-05-30030 May 2014 Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4B and 4C, Cl 3-74 - Cl 3-151 NEI 99-01, Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4A and 4B, Cover - Cl 3-732014-05-30030 May 2014 Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4A and 4B, Cover - Cl 3-73 ML14164A0622014-05-30030 May 2014 Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4A and 4B, Cover - Cl 3-73 ML14164A0632014-05-30030 May 2014 Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4B and 4C, Cl 3-74 - Cl 3-151 RA-14-032, Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4A and 4B, Cover - Cl 3-732014-05-30030 May 2014 Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4A and 4B, Cover - Cl 3-73 RA-14-032, Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4B and 4C, Cl 3-74 - Cl 3-1512014-05-30030 May 2014 Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4B and 4C, Cl 3-74 - Cl 3-151 RS-10-074, Request for NRC Approval of Changes Emergency Plan2010-04-0202 April 2010 Request for NRC Approval of Changes Emergency Plan RS-09-073, Request for NRC Approval of Changes to the Clinton Power Station Emergency Plan2009-06-19019 June 2009 Request for NRC Approval of Changes to the Clinton Power Station Emergency Plan RS-06-185, Additional Information Supporting Request for NRC Approval of Changes to Clinton Power Station Emergency Plan Annex2006-12-19019 December 2006 Additional Information Supporting Request for NRC Approval of Changes to Clinton Power Station Emergency Plan Annex RS-06-080, Request for NRC Approval of Changes to the Plant Emergency Plan Annex2006-06-30030 June 2006 Request for NRC Approval of Changes to the Plant Emergency Plan Annex ML0327216012003-09-25025 September 2003 Emergency Plan for the Exelon Generation Company, LLC Early Site Permit, Chapter 10 Through Appendiix C, References ML0327216002003-09-25025 September 2003 Emergency Plan for the Exelon Generation Company, LLC Early Site Permit, Table of Contents Through Chapter 9, Section 9.2.3 2022-05-19 Category:Letter type:RS MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024
[Table view]Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-005, Additional Information Supporting Request for Partial Site Release2024-02-0808 February 2024 Additional Information Supporting Request for Partial Site Release RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-069, Third Inservice Inspection Interval Relief Request I3R-182021-06-28028 June 2021 Third Inservice Inspection Interval Relief Request I3R-18 2024-09-09 |
Text
200 Exelon Way Kennett Square, PA 19348 Exelon Generation www.exeloncorp.com 10 CFR 50.54(q)(5).
10 CFR 50.4 10 CFR 72.44(f)
RS-17-059 April 26, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRG Docket No. 50-461
Subject:
Exelon Generation Company Radiological Emergency Plan Revision In accordance with 10 CFR 50.4(b)(5), "Emergency plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting Emergency Plan revision documentation listed in the table below for Clinton Power Station, Unit 1 (Clinton).
Procedure No. Revision Title Radiological Emergency Plan Annex for Clinton EP-AA-1003 27 Station EP-CL-1000 (superseded) 0 Clinton Emergency Plan Exelon Nuclear Standardized Radiological EP-AA-1000 (reinstituted) 28 Emergency Plan The changes to the Clinton Emergency Plan were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for Clinton. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.
- In addition, as required by 1o CFR 50.54(q)(5), Attachment 1 of this submittal includes a summary analysis of the changes to the Emergency Plan.
This submittal also satisfies the reporting requirements associated with 1o CFR 72.44(f),
which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management.
U.S. Nuclear Regulatory Commission Emergency Plan Revision Docket No. 50-461 April 26, 2017 Page2 There are no regulatory commitments in this submittal.
If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.
Respenttully, _ 1 *
~c,.--J I . ci:l_- J )A--
David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:
- 1. 10 CFR 50.54(q)(5) Procedure Change Summary Analysis
- 2. EP-AA-1003, Revision 27, "Radiological Emergency Plan Annex for Clinton Station"
- 3. EP-AA-1000, Revision 28, "Exelon Nuclear Standardized Radiological Emergency Plan" cc: w/ Attachment 1 only Regional Administrator- NRC Region Ill Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector - Clinton Power Station NRC Project Manager, NRR - Clinton Power Station Illinois Emergency Management Agency - Division of Nuclear Safety