Category:Inservice/Preservice Inspection and Test Report
MONTHYEARRA-23-0011, End of Cycle 24 (H1R24) Inservice Inspection Program Owner'S Activity Report2023-01-26026 January 2023 End of Cycle 24 (H1R24) Inservice Inspection Program Owner'S Activity Report RA-22-0172, Duke Energy Progress, LLC - Supplement to Relief Request HNP-IST-004-RR1 for Inservice Testing Program Plan - Fourth Ten-Year Interval2022-06-10010 June 2022 Duke Energy Progress, LLC - Supplement to Relief Request HNP-IST-004-RR1 for Inservice Testing Program Plan - Fourth Ten-Year Interval RA-21-0200, End of Cycle 23 (H1R23) Inservice Inspection Program Owner'S Activity Report2021-08-11011 August 2021 End of Cycle 23 (H1R23) Inservice Inspection Program Owner'S Activity Report RA-21-0067, Response to Request for Additional Information - Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection Program, Fourth Ten-Year Interval2021-02-25025 February 2021 Response to Request for Additional Information - Relief Request, Service Water Pinhole Leak in a Socket Weld, Inservice Inspection Program, Fourth Ten-Year Interval RA-20-0082, Submittal of 180-Day Steam Generator Tube Inspection Report2020-04-0808 April 2020 Submittal of 180-Day Steam Generator Tube Inspection Report RA-20-0025, Cycle 22 Owner'S Activity Report2020-02-12012 February 2020 Cycle 22 Owner'S Activity Report RA-19-0206, Proposed Alternative for the Third 10-Year Inservice Inspection Program2019-04-30030 April 2019 Proposed Alternative for the Third 10-Year Inservice Inspection Program RA-18-0066, Cycle 21 Owner'S Activity Report2018-07-31031 July 2018 Cycle 21 Owner'S Activity Report HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan2017-10-23023 October 2017 Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan HNP-16-092, Relief Request I3R-16, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Third Ten-Year Interval2016-10-19019 October 2016 Relief Request I3R-16, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Third Ten-Year Interval HNP-15-064, Submits 90-day Inservice Inspection Summary Report2015-08-0505 August 2015 Submits 90-day Inservice Inspection Summary Report HNP-15-037, Relief Request I3R-15, Reactor Vessel Closure Head Nozzle Repair Technique, Response to Request for Additional Information2015-04-24024 April 2015 Relief Request I3R-15, Reactor Vessel Closure Head Nozzle Repair Technique, Response to Request for Additional Information HNP-15-034, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program - Third Ten-Year Interval2015-04-15015 April 2015 Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program - Third Ten-Year Interval HNP-15-010, Relief Request I3R-15, Reactor Vessel Closure Head Nozzle Repair Technique Inservice Inspection Program - Third Ten-Year Interval2015-04-0202 April 2015 Relief Request I3R-15, Reactor Vessel Closure Head Nozzle Repair Technique Inservice Inspection Program - Third Ten-Year Interval HNP-14-099, Relief Request I3R-14, Deferral of Reactor Vessel Inspections Inservice Inspection Program - Third Ten-Year Interval Response to Request for Additional Information2014-09-0808 September 2014 Relief Request I3R-14, Deferral of Reactor Vessel Inspections Inservice Inspection Program - Third Ten-Year Interval Response to Request for Additional Information HNP-13-119, Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Inservice Inspection Program - Third Ten-Year Interval2013-11-22022 November 2013 Relief Request I3R-13, Reactor Vessel Closure Head Nozzle 37, Inservice Inspection Program - Third Ten-Year Interval HNP-13-071, Day Inservice Inspection Summary Report Corrections2013-06-26026 June 2013 Day Inservice Inspection Summary Report Corrections HNP-13-057, Relief Request I3R-11 Reactor Vessel Closure Head Nozzles Lnservice Inspection Program - Third Interval2013-05-22022 May 2013 Relief Request I3R-11 Reactor Vessel Closure Head Nozzles Lnservice Inspection Program - Third Interval HNP-12-091, Day Inservice Inspection Summary Report2012-09-0505 September 2012 Day Inservice Inspection Summary Report HNP-12-018, Day Inservice Inspection (ISI) Summary Report Corrections2012-04-11011 April 2012 Day Inservice Inspection (ISI) Summary Report Corrections HNP-11-045, 180-Day Steam Generator Tube Inspection Report2011-05-0505 May 2011 180-Day Steam Generator Tube Inspection Report HNP-11-017, 90-Day Inservice Inspection (ISI) Summary Report2011-02-10010 February 2011 90-Day Inservice Inspection (ISI) Summary Report HNP-09-095, Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program2009-09-24024 September 2009 Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program ML0923103532009-08-27027 August 2009 Correction to 10-Year Inservice Inspection Interval Enumerated in Relief Request 13R-02 Issued on April 30, 2009 HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report2009-08-0606 August 2009 90-Day Inservice Inspection (ISI) Summary Report HNP-08-067, Supplement to Third Interval Inservice Inspection Relief Request 13R-02 Submittal2008-06-19019 June 2008 Supplement to Third Interval Inservice Inspection Relief Request 13R-02 Submittal ML0804600932008-02-0808 February 2008 RFO13 90 Day Inservice Inspection (ISI) Summary Report ML0813304642008-01-30030 January 2008 Rev. 0 to PEN02.G03, Shearon Harris Nuclear Plant ISI Program Plan, Third 10-Year Inspection Interval. Cover to Page 8-2 ML0813304652008-01-30030 January 2008 Rev. 0 to PEN02.G03, Shearon Harris Nuclear Plant ISI Program Plan, Third 10-Year Inspection Interval. Attachment 1: Welds & Supports Schedule ML0813304662008-01-30030 January 2008 Rev. 0 to PEN02.G03, Shearon Harris Nuclear Plant ISI Program Plan, Third 10-Year Inspection Interval. Page 288 to End HNP-07-179, 90-Day Inservice Inspection (ISI) Summary Report2008-01-18018 January 2008 90-Day Inservice Inspection (ISI) Summary Report HNP-07-145, Inservice Inspection Relief Request 1, Summary of Ultrasonic Examinations of Preemptive Weld Overlays for Pressurizer Nozzle Locations Containing Alloy 600 Materials2007-10-22022 October 2007 Inservice Inspection Relief Request 1, Summary of Ultrasonic Examinations of Preemptive Weld Overlays for Pressurizer Nozzle Locations Containing Alloy 600 Materials HNP-07-143, Inservice Inspection Relief Request 1 Re Weld Overlay Repair Stress Analysis Summary2007-10-19019 October 2007 Inservice Inspection Relief Request 1 Re Weld Overlay Repair Stress Analysis Summary HNP-07-042, Revision of the Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan2007-03-22022 March 2007 Revision of the Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan HNP-06-141, Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan2006-12-18018 December 2006 Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan HNP-06-091, Relief Requests from ASME Code Inservice Testing Requirements to Allow Online Disassembly of Certain Check Valves2006-09-0707 September 2006 Relief Requests from ASME Code Inservice Testing Requirements to Allow Online Disassembly of Certain Check Valves HNP-06-081, Submittal of Inservice Inspection Summary Report for Harris Nuclear Plant2006-08-10010 August 2006 Submittal of Inservice Inspection Summary Report for Harris Nuclear Plant HNP-05-088, One-Year Special Report - Steam Generator Tube Inservice Inspection Results2005-08-0101 August 2005 One-Year Special Report - Steam Generator Tube Inservice Inspection Results HNP-05-018, Inservice Inspection Summary Report2005-02-15015 February 2005 Inservice Inspection Summary Report HNP-04-076, One Year Special Report, Steam Generator Tube Inspection Results2004-05-0707 May 2004 One Year Special Report, Steam Generator Tube Inspection Results HNP-03-081, Inservice Inspection Summary Report2003-08-13013 August 2003 Inservice Inspection Summary Report HNP-02-051, Part 2 of 2, Shearon Harris Nuclear Power Plant, Inservice Inspection Summary Report, Class 2 Through End2002-04-0101 April 2002 Part 2 of 2, Shearon Harris Nuclear Power Plant, Inservice Inspection Summary Report, Class 2 Through End HNP-01-170, Inservice Inspection Summary Report for Harris Nuclear Plant2002-01-24024 January 2002 Inservice Inspection Summary Report for Harris Nuclear Plant 2023-01-26
[Table view] Category:Letter type:RA
MONTHYEARRA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0098, Annual Environmental (Nonradiological) Operating Report2023-04-19019 April 2023 Annual Environmental (Nonradiological) Operating Report RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications2023-02-0707 February 2023 License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-23-0011, End of Cycle 24 (H1R24) Inservice Inspection Program Owner'S Activity Report2023-01-26026 January 2023 End of Cycle 24 (H1R24) Inservice Inspection Program Owner'S Activity Report RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0314, Notification of Source Water Resiliency and Response Plan Submission2022-11-0202 November 2022 Notification of Source Water Resiliency and Response Plan Submission RA-22-0297, Cycle 25 Core Operating Limits Report, Revisions 0 and 12022-10-17017 October 2022 Cycle 25 Core Operating Limits Report, Revisions 0 and 1 RA-22-0214, 10 CFR 50.54(Q) Review Form for Revisions to the Shearon Harris Nuclear Power Plant, Unit 1, Emergency Action Level (EAL) Technical Basis Document and the EAL Wallchart Document2022-07-12012 July 2022 10 CFR 50.54(Q) Review Form for Revisions to the Shearon Harris Nuclear Power Plant, Unit 1, Emergency Action Level (EAL) Technical Basis Document and the EAL Wallchart Document RA-22-0197, Reactor and Senior Reactor Operator Initial Examinations 05000400/20223012022-07-0606 July 2022 Reactor and Senior Reactor Operator Initial Examinations 05000400/2022301 RA-22-0213, Notification of Modification to Permit Application for Industrial Stormwater Activities2022-06-30030 June 2022 Notification of Modification to Permit Application for Industrial Stormwater Activities RA-22-0172, Duke Energy Progress, LLC - Supplement to Relief Request HNP-IST-004-RR1 for Inservice Testing Program Plan - Fourth Ten-Year Interval2022-06-10010 June 2022 Duke Energy Progress, LLC - Supplement to Relief Request HNP-IST-004-RR1 for Inservice Testing Program Plan - Fourth Ten-Year Interval RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes2022-05-24024 May 2022 Duke Energy Common Emergency Plan, Revision 2, Summary of Changes RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory2022-05-16016 May 2022 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0136, Annual Environmental (Nonradiological) Operating Report2022-04-29029 April 2022 Annual Environmental (Nonradiological) Operating Report RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 20212022-04-27027 April 2022 Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.462022-04-27027 April 2022 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-22-0117, Relief Request for Inservice Testing Program Plan - Fourth Ten-Year Interval2022-04-0707 April 2022 Relief Request for Inservice Testing Program Plan - Fourth Ten-Year Interval RA-22-0114, Duke Energy Carolinas, LLC and Duke Energy Progress, LLC Submittal of 10CFR26.719(c)(1) Report of Unsatisfactory Performance of Health and Human Services Certified Laboratory2022-04-0101 April 2022 Duke Energy Carolinas, LLC and Duke Energy Progress, LLC Submittal of 10CFR26.719(c)(1) Report of Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-22-0014, Duke Energy Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-21021 March 2022 Duke Energy Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations RA-22-0079, Snubber Program Plan2022-02-28028 February 2022 Snubber Program Plan RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-22-0055, Evacuation Time Estimate Report2022-02-18018 February 2022 Evacuation Time Estimate Report RA-22-0043, CFR 50.54(q) Evaluation2022-02-0808 February 2022 CFR 50.54(q) Evaluation RA-22-0037, Emergency Plan Annex, Revision 1 and Emergency Plan Annex, Revision 1, Emergency Action Level (EAL) Wallchart, Revision 2, and EAL Technical Basis Document2022-02-0808 February 2022 Emergency Plan Annex, Revision 1 and Emergency Plan Annex, Revision 1, Emergency Action Level (EAL) Wallchart, Revision 2, and EAL Technical Basis Document 2024-01-08
[Table view] |
Text
Kevin P. Riley Nuclear Support Services Manager Harris Nuclear Plant 5413 Shearon Harris Rd New Hill, NC 27562-9300 984.229.2124 August 11, 2021 Serial: RA-21-0200 ATTN: Document Control Desk 10 CFR 50.55a U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 / Renewed License No. NPF-63
Subject:
Shearon Harris Nuclear Power Plant, Unit 1 - End of Cycle 23 (H1R23) Inservice Inspection Program Owners Activity Report Ladies and Gentlemen:
Pursuant to the reporting requirements of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, as amended by ASME Code Case N-532-5, Duke Energy Progress, LLC (Duke Energy), hereby submits the Owners Activity Report for the Shearon Harris Nuclear Power Plant, Unit 1, refueling outage H1R23.
This letter contains no new or revised regulatory commitments.
Should you have any questions concerning this letter, or require additional information, please contact Art Zaremba, Manager - Nuclear Fleet Licensing, at 980-373-2062.
Sincerely, Digitally signed by i22614 i22614 (330130)
Date: 2021.08.10 (330130) 21:43:21 -04'00' Kevin P. Riley
Enclosure:
Cycle 23 Owners Activity Report cc: J. Zeiler, NRC Sr. Resident Inspector, HNP M. Mahoney, NRC Project Manager, HNP L. Dudes, NRC Regional Administrator, Region II
U.S. Nuclear Regulatory Commission Serial: RA-21-0200, Enclosure ENCLOSURE SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 CYCLE 23 OWNERS ACTIVITY REPORT (5 PAGES PLUS COVER)
DUKE ENERGY INSERVICE INSPECTION
SUMMARY
REPORT REFUELING OUTAGE H1R23 (Outage 3)
Location: 5413 Shearon Harris Road, New Hill, NC 27562 NRC Docket No. 50-400 / Renewed License No. NPF-63 Commercial Service Date: May 2, 1987 Owner: Duke Energy 526 South Church St.
Charlotte, NC 28201-1006 Revision 0 Originated By: Date Angela Staller Checked By: Date Austin Keller Approved By: Date Mark Pyne
CASE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number RA-21-0200 Plant Shearon Harris Nuclear Plant, 5413 Shearon Harris Road, New Hill, NC 27562 Unit No. 1 Commercial service date May 2, 1987 Refueling outage no. H1R23 (if applicable)
Current inspection interval Fourth Inspection Interval (ISI), Third Inspection Interval (Containment ISI)
(1st, 2nd, 3rd, 4th, other)
Current inspection period Second Inspection Period (ISI), First Inspection Period (Containment ISI)
(1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the ASME Section XI 2007 Edition through 2008 Addenda, inspection plans 2017 Edition (See Attachment 1)
Date and revision of inspection plans See Attachment 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases Available for Use:
N-513-3, N-532-5, N-586-1, N-600, N-613-1, N-638-6, N-639, N-643-2, N-Code Cases used for inspection 648-1, N-651, N-705, N-706-1, N-716-1, N-722-1, N-729-6, N-731, N-735, and evaluation: N-747, N-765, N-770-5, N-775, N-776, N-798, N-800, N-805, N-845 (if applicable, include cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of H1R23 conform to the requirements of Section XI.
(refueling outage number)
Signed Angela Staller, ISI Program Owner Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by OneCIS Insurance Company of Lynn, MA have inspected e that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Elmostafa Elkouri Commissions NB #13930, NC# 1600 A.N.I.C.
National Board, State, Province, and Endorsements Page 1 of 4
Attachment 1 CASE N-532-5 Shearon Harris Unit 1 Refueling Outage 23, Inservice Inspection Report The Shearon Harris Nuclear Power Plant, Unit 1, Fourth Ten-Year Interval Inservice Inspection (ISI) Plan and Third Ten-Year Containment Inservice Inspection (CISI) Plan complies with 10CFR50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2007 Edition through 2008 Addenda. The 2017 Edition of Section XI is also applicable for IWA-4340, IWA-4540(b),
IWA-5120, IWA-5213, IWA-5241, IWA-5242 and IWA-5250 in accordance with three NRC Safety Evaluations (ADAMS Accession Numbers ML21113A013, ML20300A206 and ML21029A335).
This summary report is submitted pursuant to the reporting requirements of ASME Section XI as Requirements and Inservice Inspection Summary Report Preparation and Submission Section Refueling Outage 23 (H1R23) is the first of three outages of the second period in the fourth inspection interval for the ISI and Pressure Testing programs, and the second of two outages of the first period in the third inspection interval for the Containment ISI program. See the table below for the dates and revisions of the inservice inspection plans.
Document Title Document Number Date of Issue and Revision Fourth Interval Inservice Inspection Plan and HNP-PM4-002, Rev. 2 March 9, 2020 Third Interval Containment Inservice Plan Fourth Interval Inservice Inspection Schedule HNP-PM4-003, Rev. 2 March 9, 2020 and Third Interval Containment Inservice Inspection Schedule Fourth Interval Inservice Inspection Pressure HNP-PM4-005, Rev. 1 April 30, 2020 Test Plan and Schedule Augmented Inservice Inspection (AISI) Plan HNP-PM-4-007, Rev. 4 May 13, 2020 th Inservice Inspection Interval Page 2 of 4
CASE N-532-5 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Concrete Areas of exposed welded wire mesh were noted during containment dome examination. Only cosmetic grout layer was deteriorated above parapet L-A/L1.11 floor 0° to 180° that conditions with exposed welded wire mesh are acceptable.
Concrete Areas of exposed welded wire mesh were noted during containment dome examination. Only cosmetic grout layer was deteriorated above parapet L-A/L1.11 floor 180° to 360° that conditions with exposed welded wire mesh are acceptable.
Page 3 of 4
CASE N-532-5 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Repair /
Code Date Replacement Class Item Description Description of Work Completed Plan Number 3SW3-1499SB-1, Replace 3 3SW3-1499SB-1 Emergency Service Water 12/11/2019 20301071-01 Piping 3SC1-2SA-1 Sock-O-Let 3 3SC1-2SA-1 1/16/2020 20378074-04 replacement 1CS-CSIPA 1CS-CSIPA, Repair 2 12/15/2020 20433121-01 Cracked Weld 3SW1-141SB-1, Replace Piping in Support of Relief 3 3SW1-141SB-1 4/21/2021 20424752-01 Request RA-20-0312 and EC 418338 3SW3-1500SA-1, Replace 3 3SW3-1500SA-1 Emergency Service Water 5/5/2021 20413927-01 Piping Replace 1SW-1060 and Associated Piping with 3 3SW1.5-814SA-1 5/5/2021 20361269-01 Stainless-Steel Ball Valve and Piping 1CH-E005, Replace 3 1CH-E005 Degraded Support in 5/5/2021 20394226-11 Waterbox Page 4 of 4