NRC 2014-0040, License Amendment Request 276, Cyber Security Plan Milestone 8 Date Change Request

From kanterella
Jump to navigation Jump to search

License Amendment Request 276, Cyber Security Plan Milestone 8 Date Change Request
ML14202A574
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/18/2014
From: Mccartney E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2014-0040, TAC ME4248, TAC ME4249
Download: ML14202A574 (8)


Text

NEXTera ENERGY .

POINT BEACH July 18, 2014 NRC 2014-0040 10 CFR 50.90 U.S . Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Request 276 Cyber Security Plan Milestone 8 Date Change Request

References:

(1) NextEra Energy Point Beach , LLC letter to NRC, License Amendment Request 263A, Request for Approval of the Point Beach Nuclear

(2) NRC Letter to NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 -Issuance of Amendments Re: Revised Cyber Security Plan (TAC NOS . ME4248 AND ME4249), dated July21,2011 (ML111740077)

Pursuant to 10 CFR 50.90, NextEra Energy Point Beach, LLC (NextEra) hereby requests to amend the Cyber Security Plan for Point Beach Nuclear Plants, Units 1 and 2. The proposed change is a request to revise the completion date of Milestone 8 of the Cyber Security Plan implementation schedule. The Cyber Security Plan and implementation schedule were previously provided in Reference (1) and approved by the NRC in Reference (2). provides a description and an evaluation of the proposed change. contains proposed marked-up operating license pages for the Physical Protection license condition for PBNP to reference the change requested in this submittal. Enclosure 3 contains the clean pages of the proposed revised operating license pages. NextEra requests that Enclosures 1, which contains security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

Enclosure 1 contains security-related information to be withheld under 10 CFR 2.390. When separated from this transmittal, the remaining transmittal document is decontrolled.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 Enclosure 1 contains security-related information to be withheld under 10 CFR 2.390. When separated from this transmittal, the remaining transmittal document is decontrolled.

The proposed changes have been evaluated in accordance with 10 CFR 50.91 (a)(1) using the criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration. The bases for these determinations are included in Enclosure 1.

NextEra requests this license amendment be effective as of its date of issuance.

Review and approval is requested by July 31,2015.

These changes have been reviewed by the NextEra Onsite Review Group. A copy of this submittal is also being sent to our appointed state official pursuant to 10 CFR 50.91.

  • Should you have any questions regarding this submittal, please contact Mr. Michael Millen, Licensing Manager at 920/755-7845.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on July 18, 2014.

Very truly yours,

~~c(~

Eric McCartney Site Vice President Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Enclosure 1 contains security-related information to be withheld under 10 CFR 2.390. When separated from this transmittal , the remaining transmittal document is decontrolled.

ENCLOSURE 2 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 FACILITY OPERATING LICENSE NOs. DPR-24 AND DPR-27 PROPOSED OPERATING LICENSE CHANGE (MARKED-UP PAGES) 2 pages follow

D. Physical Protection NextEra Energy Point Beach shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Point Beach Nuclear Plant Physical Security Plan, (Revision 4 )," submitted by letter dated May 10, 2006. Next Era Energy Point Beach, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Point Beach Nuclear Plant Cyber Security Plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Point Beach CSP was approved by License Amendment No. 243 as supplemented by-a change~ approved by License Amendment No. 24 7 and License Amendment No. xxx.

E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.

F. NextEra Energy Point Beach shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:

NextEra Energy Point Beach may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Secondary Water Chemistry Monitoring Program NextEra Energy Point Beach shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
2. Identification of the procedures used to quantify parameters that are critical to control points;
3. Identification of process sampling points;
4. Procedure for the recording and management of data; Renewed License No. DPR-24 Amendment No. ~

D. Physical Protection NextEra Energy Point Beach shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Point Beach Nuclear Plant Physical Security Plan, (Revision 4 ),"submitted by letter dated May 10, 2006. NextEra Energy Point Beach, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Point Beach Nuclear Plant Cyber Security Plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Point Beach CSP was approved by License Amendment No. 247 as supplemented by a change,§ approved by License Amendment No. 251 and License Amendment No. xxx.

E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.

F. NextEra Energy Point Beach shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No. 174, subject to the following provision:

NextEra Energy Point Beach may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Secondary Water Chemistry Monitoring Program NextEra Energy Point Beach shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
2. Identification of the procedures used to quantify parameters that are critical to control points;
3. Identification of process sampling points; Renewed License No. DPR-27 Amendment No. ~

ENCLOSURE 3 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 FACILITY OPERATING LICENSE NOs. DPR-24 AND DPR-27 REVISED OPERATING LICENSE (RETYPED PAGES) 2 pages follow

D. Physical Protection NextEra Energy Point Beach shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50 .90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21 , is entitled: "Point Beach Nuclear Plant Physical Security Plan, (Revision 4 )," submitted by letter dated May 10, 2006. Next Era Energy Point Beach, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Point Beach Nuclear Plant Cyber Security Plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Point Beach CSP was approved by License Amendment No. 243 as supplemented by changes approved by License Amendment No. 24 7 and License Amendment No. xxx.

E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shutdown using normal procedures and placed in a block-permissive condition for safety injection actuation.

F. NextEra Energy Point Beach shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specification Amendment No. 170, subject to the following provision:

NextEra Energy Point Beach may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Secondary Water Chemistry Monitoring Program NextEra Energy Point Beach shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation . This program shall include:

1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
2. Identification of the procedures used to quantify parameters that are critical to control points;
3. Identification of process sampling points;
4. Procedure for the recording and management of data; Renewed License No. DPR-24 Amendment No.

D. Physical Protection NextEra Energy Point Beach shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50 .54(p ). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Point Beach Nuclear Plant Physical Security Plan, (Revision 4 )," submitted by letter dated May 10, 2006. Next Era Energy Point Beach, LLC shall fully implement and maintain in effect all provisions of the Commission-approved Point Beach Nuclear Plant Cyber Security Plan (CSP),

including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Point Beach CSP was approved by License Amendment No. 24 7 as supplemented by changes approved by License Amendment No. 251 and License Amendment No. xxx.

E. Safety Injection Logic The licensee is authorized to modify the safety injection actuation logic and actuation power supplies and related changes as described in licensee's application for amendment dated April27, 1979, as supplemented May 7, 1979. In the interim period until the power supply modification has been completed, should any DC powered safety injection actuation channel be in a failed condition for greater than one hour, the unit shall thereafter be shut down using normal procedures and placed in a block-permissive condition for safety injection actuation.

F. NextEra Energy Point Beach shall implement and maintain in effect all provisions of the approved fire protection program as described in the FSAR for the facility and as approved in the Safety Evaluation Report dated August 2, 1979 (and Supplements dated October 21, 1980, January 22, 1981, and July 27, 1988) and the safety evaluation issued January 8, 1997, for Technical Specifications Amendment No. 174, subject to the following provision:

NextEra Energy Point Beach may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Secondary Water Chemistry Monitoring Program NextEra Energy Point Beach shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
2. Identification of the procedures used to quantify parameters that are critical to control points;
3. Identification of process sampling points; Renewed License No. DPR-27 Amendment No.