MONTHYEARNRC 2011-0106, License Renewal Commitment Reactor Vessel Lnternals Program Submittal2011-12-19019 December 2011 License Renewal Commitment Reactor Vessel Lnternals Program Submittal Project stage: Other ML12159A1132012-06-0707 June 2012 Draft RAI on Reactor Vessel Internals Inspection Plan Project stage: Draft RAI ML12198A0502012-07-10010 July 2012 E-mail Point Beach Nuclear Plant Units 1 and 2 - Draft Request for Additional Information Re Reactor Vessel Internals Inspection Plan Project stage: Draft RAI NRC 2012-0052, Reactor Vessel Internals Inspection Plan, Response to Request for Additional Information2012-08-16016 August 2012 Reactor Vessel Internals Inspection Plan, Response to Request for Additional Information Project stage: Response to RAI ML13036A3002013-01-31031 January 2013 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information (Second Round) Reactor Vessel Internals Inspection Plan Review (TAC Nos. ME8235 & ME8236) Project stage: Draft RAI NRC 2013-0029, Reactor Vessel Lnternals Inspection Plan, Response to Request for Additional Lnformation2013-03-15015 March 2013 Reactor Vessel Lnternals Inspection Plan, Response to Request for Additional Lnformation Project stage: Request NRC 2014-0021, Reactor Vessel Internals Inspection Plan Response to Request for Addtional Information2014-04-21021 April 2014 Reactor Vessel Internals Inspection Plan Response to Request for Addtional Information Project stage: Request NRC 2015-0003, Reactor Vessel Internals Inspection Plan Response to Request for Additional Information2015-01-13013 January 2015 Reactor Vessel Internals Inspection Plan Response to Request for Additional Information Project stage: Response to RAI ML15334A2642015-03-30030 March 2015 Official Exhibit - ENT000649-00-BD01 - Letter from D. Pelton, NRC, to E. Mccartney, NextEra Energy Point Beach, Point Beach Np, Units 1 and 2 - Staff Assessment of Reactor Vessel Internals Inspection Plan Based on MRP-227-A Project stage: Other ML15079A0872015-03-30030 March 2015 Staff Assessment of Reactor Vessel Internals Inspection Plan Based on MRP 227 a Project stage: Other ML15222A9172015-03-30030 March 2015 ENT000649 - Letter from D. Pelton, NRC, to E. Mccartney, NextEra Energy Point Beach, Point Beach Nuclear Plant, Units 1 and 2 - Staff Assessment of Reactor Vessel Internals Inspection Plan Based on MRP-227-A (TAC Nos. ME8235 and ME8236)(Mar Project stage: Other 2013-01-31
[Table View] |
|
---|
Category:Letter type:NRC
MONTHYEARNRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report2019-10-18018 October 2019 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information2019-10-17017 October 2019 NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information 2023-07-07
[Table view] |
Text
March 15,2013 NRC 2013-0029 10 CFR 54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Reactor Vessel lnternals Inspection Plan Response to Request for Additional lnformation
References:
(1) NextEra Energy Point Beach, LLC letter to NRC, dated December 19,201 1, License Renewal Commitment, Reactor Vessel lnternals Program Submittal (MLI 13540301)
(2) NRC electronic mail to NextEra Energy Point Beach, LLC, dated June 7, 2012, Point Beach Units 1 and 2 - Draft RAI on the Reactor Vessel lnternals lnspection Plan (TAC ME8235 and ME8236)
(ML12159A113)
(3) NRC electronic mail to NextEra Energy Point Beach, LLC, dated July 10, 2012, Point Beach Nuclear Plant Units 1 and 2 - Draft Request for Additional lnformation re: Reactor Vessel lnternals lnspection Plan (TAC Nos. ME8235 and ME8236) (MLI2198A050)
(4) NextEra Energy Point Beach, LLC letter to NRC, dated August 16, 2012, Reactor Vessel lnternals lnspection Plan, Response to Request for Additional lnformation (MLI2229A580)
(5) NRC electronic mail to NextEra Energy Point Beach, LLC, dated January 31, 2013, Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional lnformation (Second Round) re: Reactor Vessel lnternals lnspection Plan Review (TAC Nos. ME8235 and ME8236)
(MLI 3036A300)
NextEra Energy Point Beach, LLC (NextEra) submitted the Point Beach Nuclear Plant (PBNP) program NP 7.7.30, Reactor Vessel lnternals Program, via Reference (1). The PBNP Reactor Vessel lnternals Program is based on Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) Technical Report MRP-227, Pressurized Water Reactor (PWR) lnternals lnspection and Evaluation Guidelines, Revision 0.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 Via References (2) and (3), the NRC determined additional information was required to enable the staff's continued review of the PBNP Reactor Vessel lnternals Program. NextEra responded to the request via Reference (4).
In Reference (5),the NRC requested a second round of additional information in order to enable the staff's continued review of the PBNP Reactor Vessel lnternals Program. Enclosure 1 contains the NextEra response to the NRC staff's request for additional information.
Summary of Regulatory Commitments:
This letter contains the following new commitments and no changes to existing commitments.
NextEra Energy Point Beach, LLC will contract with Westinghouse to determine which components are not bounded by the assumptions on stress, temperature, and fluence contained in MRP-191, MRP-232, and MRP-227-A. Westinghouse will complete the plant-specific evaluation to demonstrate that the MRP-227 recommended inspections will ensure functionality of these components until the next scheduled inspection. This information is expected to be available by January 31, 2014. This information will be provided to the NRC within 45 days of receipt from Westinghouse.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 15,2013.
Very truly yours, NextEra Energy Point Beach, LLC Site Vice President Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC
ENCLOSURE I NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 REACTOR VESSEL INTERNALS INSPECTION PLAN RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION The NRC staff determined that additional information was required (Reference 1) to enable the continued review of the Point Beach Nuclear Plant (PBNP) Reactor Vessel lnternals (RVI) Program (Reference 2). The following information is provided by NextEra Energy Point Beach, LLC (NextEra) in response to the NRC staff's request.
RAI-I a In response to RAI-I, ltem 4, the licensee stated:
"The PBNP RVI components are bounded by the typical WestinghousePWR internals components outlined in MRP-227-A and the applicable referenced documents, including MRP-191 and MRP-232. The PBNP reactor vessel internals inspection program was written to comply with MRP-227-A. No changes in the inspection requirements are being proposed at this time in that the PBNP inspection program complies with MRP-227-A as indicated above."
The licensee did not mention that an exfended power uprate (EPU) for each unit was approved by the NRC on May 5, 2011. The MRP has stated that the inspection recommendations are applicable to all U.S, PWR [pressurized water reactor] operating plants as of May 2007. In discussions with the MRP, the MRP indicated that EPUs after 2007 were not considered during the development of the MRP-227 recommendations.
The NRC staff reviewed the licensee's 2009 submittal for the EPU (ADAMS Accession No. ML091250566) and noted several instances for which the stress, fatigue usage, and neutron fluence values provided in the EPU evaluation appear to exceed the screening values of MRP-191 and, therefore, may not be bounded by the assumptions made in development of MRP-227-A. The following examples are noted:
I. Table 2.2.3-3 of the 2009 EPU submittal lists the stresses and fatigue usage factors (CUF) of different core support structures. For the upper core plate alignment pins, the document includes values of 51.48 ksi for stress and 0.30 for the CUF before the EPU, and 38,507 ksi for stress and 0.583 for the CUF after the EPU with an ASME Code-allowable stress intensity of 34.44 ksi, The licensee's August 16, 2012, response to RAI-I, ltem 2, lists that component as having an effective stress < 30 ksi, matching the stress for that component in MRP-191.
- 2. Section 2.1.4.2.2 of the 2009 EPU submittal lists the maximum fast neutron fluence (E > 1.0 MeV) for 54 EFPY as 8.83E+22 n/cm2for Unit I and 8.77E+22 n/cm2for Unit 2, whereas MRP-191 states that the maximum fluence values for any internal component is 5E+22 n/cm2.
Reuuested Information The NRC staff requests the licensee review its current licensing basis (CLB), including the 2009 EPU submittal, and list all components that are not bounded by the assumptions on stress, temperature, and fluence contained in MRP-191, MRP-232, and MRP-227-A. Evaluate the need for changes to the Page 1 of 3
inspection requirements and/or inspection frequency for any components that are not bounded by the screening values of fluence, temperature, and stress. Describe the process used to perform these evaluations. Provide a technicaljustification for either changing or not changing the inspection requirements and/or inspection frequency.
NextEra Response NextEra will contract with Westinghouse to supply the requested information for components that are not bounded by the assumptions on stress, temperature, and fluence contained in MRP-191, MRP-232, and MRP-227-A.
In the December 19, 2011, submittal, there is no discussion of Action ltem 7 from MRP-227-A. In Section 3.3.7 of the SE for MRP-227, the NRC staff stated that the licensee shall develop a plant-specific analysis to demonstrate that components manufactured from CASS materials will maintain their functions during the period of extended operation. This requirement applies to all susceptible components for which the licensee has determined aging management is required, which includes components designated as expansion and existing as well as the primary category.
Reauested Information The NRC staff requests that the licensee provide a list of all reactor vessel internal components manufactured from CASS materials for Point Beach, Units I and 2, along with the plant-specific analysis required by Action ltem 7. Provide plant-specific aging management requirements for any components that are not already covered by the "Primary'; "Expansion'; or "Existing Programs';
categories under MRP-227-A.
NextEra Response:
The following five PBNP RVI components within the scope of license renewal are constructed of CASS:
- 1) Flow Mixers (Upper Core Plate);
- 2) Upper Support Column Bases;
- 3) Bottom Mounted Instrumentation (BMI) Column Cruciforms;
- 4) Secondary Core Support (SCS) Guide Posts (Unit 2); and
- 5) Secondary Core Support (SCS) Housings (Unit 2).
The first three of these components screened in for thermal embrittlement (TE) and irradiation embrittlement (IE) during the initial screening process for MRP-227-A, as documented in Table 5-1 of MRP- 191. This screening was based only on the temperature (500°F) and fluence (6.7 x lo2' n/cm2, E N . 0 MeV) thresholds for TE and IE, respectively, without consideration of the components' delta ferrite contents. The last two of these components did not screen in for any of the failure mechanisms since MRP-191 considered them to be constructed only of wrought 304 SS. Given their CASS construction, PBNP also considers them susceptible to TE and IE.
Two of these components, Flow Mixers (Upper Core Plate) and Upper Support Column Bases, were screened as Category A - No Adverse Effects in Table 7-2 of MRP-191. BMI Column Cruciforms were placed in the No Additional Measures Group by the FMECA, categorization and rankings described in MRP-I 91 and MRP-232. The last two components, SCS Guide Posts and SCS Housings, were not considered to be made from CASS during screening in MRP-191. As part of the effort to respond to RAI-I a, Westinghouse will complete the plant-specific analysis or evaluation to demonstrate that the MRP-227 recommended inspections will ensure functionality of these components until the next scheduled inspection.
Page 2 of 3
References (1) NRC electronic mail to NextEra Energy Point Beach, LLC dated January 31, 2013, Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information (Second Round) re: Reactor Vessel lnternals Inspection Plan Review (TAC ME8235 and ME8236)
(2) NextEra Energy Point Beach, LLC letter to NRC, dated December 19, 201 1, License Renewal Commitment, Reactor Vessel lnternals Program Submittal (MLI 13540301)
Page 3 of 3