NRC 2005-0079, Request for Withholding of Proprietary Information from Public Disclosure

From kanterella
Jump to navigation Jump to search

Request for Withholding of Proprietary Information from Public Disclosure
ML052520084
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/01/2005
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2005-0079, NRC 2005-0110, NRC 2005-0114
Download: ML052520084 (2)


Text

Committed to NuclearExcellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC September 1, 2005 NRC 2005-0114 10 CFR 2.390 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Request for Withholdina of Proorietarv Information from Public Disclosure

References:

1. Letter from NMC to NRC dated August 26,2005 (NRC 2005-0110)
2. Letter from NMC to NRC dated June 20, 2005 (NRC 2005-0079)

In Reference 1, Nuclear Management Company, LLC (NMC), submitted the reclassified non-proprietary version of Westinghouse Calculation Note Number CN-RCDA-05-68, Revision 2, "Plastic Analysis of Point Beach Reactor Coolant Piping for Reactor Vessel Head Drop", dated July 18, 2005. Reference 2 had submitted an earlier version of this calculation (Revision 1) as a proprietary document. Revision 2 superseded Revision 1.

Westinghouse Electric Company ("Westinghouse"), the owner of the information, has informed NMC that CN-RCDA-05-68, Revision 2, consisted of additions and clarifications to Revision 1. Westinghouse stated that since CN-RCDA-05-68, Revision 2, was reclassified by Westinghouse as non-proprietary, previous revisions of CN-RCDA-05-68, including Revision 1, also contain no proprietary information and may be released for public disclosure by the NRC.

This letter contains no new commitments and no revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September 1, 2005.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC OD 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

Document Control Desk Page 2 cc: Project Manager, Point Beach Nuclear Plant, USNRC Regional Administrator, Region IIl, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC