ML18150A648

From kanterella
Jump to navigation Jump to search
APR1400, Supplementary Information for Safety Evaluation with No Open Items for Chapter 14.3, Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) - Letter to KHNP
ML18150A648
Person / Time
Site: 05200046
Issue date: 06/07/2018
From: William Ward
NRC/NRO/DNRL/LB2
To: Grace Kim
Korea Hydro & Nuclear Power Co, Ltd
Santos C / 415-7270
Shared Package
ML18150A645 List:
References
Download: ML18150A648 (5)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION June 7, 2018 Dr. Han-Gon Kim, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd.

70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 34101 Korea (Republic of)

SUBJECT:

ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SUPPLEMENTARY INFORMATION FOR SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 14.3, INSPECTIONS, TESTS, ANALYSES AND ACCEPTANCE CRITERIA (ITAAC)

Dear Dr. Kim:

The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 2 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 8, 2018.

The staffs SE with no OIs for Chapter 14, Section 14.3, Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC), was provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support an upcoming meeting of the ACRS Subcommittee scheduled to be held on June 19, 2018. The attached ITAAC Evaluation Cross Reference Table is also being provided to the ACRS as additional supplementary information to support this meeting.

The enclosed table is being provided to KHNP for review of proprietary information pursuant to the Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed table does not contain any information for which exemption from public disclosure has been sought or approved; however, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no exempt information or factual errors.

Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION Dr. Kim If within that ten day period, you do not request that all or portions of the table be withheld from public disclosure, the enclosure will be made available for public inspection through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.

If you have any questions or comments concerning this matter, please contact Cayetano Santos at (301) 415-7270 or via e-mail address at Cayetano.Santos@nrc.gov.

Sincerely,

/RA/

William R. Ward, Senior Project Manager Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No.: 52-046

Enclosure:

As stated cc w/ encls: See Next Page OFFICIAL USE ONLY - PROPRIETARY INFORMATION

Pkg: ML18150A645 Letter: ML18150A648 Table: ML18150A650 *via email NRO-002 OFFICE DLSE/LB2: PM DLSE/LB2: LA DLSE/LB2: LPM NAME CSantos (CLauron CSmith

  • WWard For)

DATE 06/07/2018 5/31/2018 06/07/2018 KHNP Mailing List 02/06/2018 Daegeun (Tony) Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2

Email kimhg1108@khnp.co.kr [Han-Gon Kim]

hansang.kim@khnp.co.kr [Hansang Kim]

dohwan.lee@khnp.co.kr [Do-Hwan Lee]

junghokim@khnp.co.kr [Jung-Ho Kim]

yunho.kim@khnp.co.kr [Yun Ho Kim]

jiyong.oh@khnp.co.kr [Jiyong Andy Oh]

ahn.daegeun@khnp.co.kr [Daegeun Tony Ahn]

jksuh@khnp.co.kr [Jeong Kwan Suh]

hachewung@khnp.co.kr [Che Wung Ha]

kang.deogji@khnp.co.kr [Deog Ji Kang]

sunguk.kwon@khnp.co.kr [Sun Guk Kwon]

ptmaster300@kepco.co.kr [Hyun Chul Park]

sisk1rb@westinghouse.com [Rob Sisk]

david.wagner@aecom.com [David Wagner]

robert.sweeney@consultant.aecom.com [Robert Sweeney]

Page 2 of 2