MONTHYEARML17013A1462018-08-29029 August 2018 Audit Summary to Review KHNP APR1400 Non-LOCA Chapter 15, Transient and Accident Analyses - Memo ML17230A2602018-08-21021 August 2018 Summary for Audit Conducted from July 29, 2015 Through April 27, 2017and Transmittal Memo APR1400 Chapters 4, 6 and 9 ML18158A3422018-08-15015 August 2018 KHNP Environmental Assessment: APR1400 Design Certification (Rin 3150-AJ67; NRC-2015-0225 ML18150A6472018-06-11011 June 2018 APR1400, Supplementary Information for Safety Evaluation with No Open Items for Chapter 14.3, Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) - Memorandum ML18156A0462018-06-0505 June 2018 APR1400 Topical Report Safety Evaluation, Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400 - Memorandum to ACRS ML18149A5502018-05-31031 May 2018 APR1400 Chapter 14.3.2, Structural and Systems Engineering - ITAAC, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18147A0032018-05-31031 May 2018 APR1400 Chapter 13, Conduct of Operations, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML17188A3032018-05-21021 May 2018 APR1400 Chapter 6, Engineered Safety Features, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18054A6862018-05-20020 May 2018 APR1400 Chapter 14.3, Verification Programs, Safety Evaluation Report with Open Items - Memorandum to ACRS Memo ML18128A2992018-05-0808 May 2018 APR1400 Chapter 17, Quality Assurance and Reliability Assurance, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18128A1112018-05-0808 May 2018 APR1400 Chapter 19, Section 19.0 and Section 19.1, Probabilistic Risk Assessment and Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18122A2242018-05-0808 May 2018 APR1400 Chapter 19, Section 19.2, Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18073A2552018-03-26026 March 2018 Summary of March 14, 2018 Public Meeting with KHNP to Discuss Human Factors Engineering ML18068A1292018-03-26026 March 2018 March 7, 2018 Summary of Public Meeting with KHNP to Discuss Proposed ITAAC for the APR1400 ML17265A2692018-03-23023 March 2018 Transmittal Memo to ACRS of the LBLOCA Safety Evaluation for KHNP Topical Report APR1400-F-A-TR-1200A-P, Realistic Evaluation Methodology for Large-Break Loss of Coolant Accident of the APR1400. ML18017A2422018-03-20020 March 2018 Chapter_3_Phase_4_Memorandum ML17269A3152018-03-19019 March 2018 Transmittal Memo to ACRS of the Chapter 15 Phase 4 Safety Evaluation Report Transient and Accident Analyses, APR1400 Design Certification ML18074A0322018-03-19019 March 2018 APR1400 P4 Chapter 7 ACRS ML17166A1142018-02-23023 February 2018 APR1400 Chapter 2 Phase 4 - Section 2.5 - Memo to ACRS ML18012A6282018-01-26026 January 2018 Chapter_9_Phase_4_Memorandum ML17276A0342018-01-26026 January 2018 Memo for Transmittal to ACRS the Phase 4 Chapter 19.5, Aircraft Impact Assessment Safety Evacuation Report for the APR1400 Design Certification ML17271A0982018-01-26026 January 2018 APR1400 P4 Chapter 19.3 ACRS Memo ML17243A2462018-01-26026 January 2018 Memo Advanced Power Reactor 1400 Design Certification Application - Safety Evaluation with No Open Items for Section 19.4, Loss of Large Areas of the Plant Due to Explosions or Fire ML17324B2882017-12-28028 December 2017 APR1400 P4 Chapter 14.1-14.2 ACRS Memo ML17276B5182017-12-28028 December 2017 APR1400 P4 Chapter 18 ACRS Memo ML17188A3152017-12-28028 December 2017 APR1400 Chapter 16 Phase 4 ACRS Memorandum ML17334A1042017-12-27027 December 2017 APR1400 Chapter 4 Phase 4 Memorandum ML17132A2862017-12-26026 December 2017 Audit Report of Structural and Seismic Design Supporting Chapter 3, Design of Structures, Systems, Components, and Equipment, of the Advanced Power Reactor 1400 Design Control Document ML17058A3932017-03-17017 March 2017 APR1400 Chapter 14, Phase 3, ACRS Memo ML16300A1842016-12-0707 December 2016 Memorandum - Audit Summary for the Korea Hydro and Nuclear Power Co. Ltd Advanced Power Reactor 1400 Electric Power System ML16211A3512016-08-0404 August 2016 Supplemental Safety Evaluation Report for Topical Report APR1400-K-Q-TR-11005-NP, Revision 5, Knhp Quality Assurance Program Description for the APR1400 Design Certification. 2018-08-29
[Table view] |
Text
August 29, 2018 MEMORANDUM TO: Michael McCoppin, Chief Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: James Steckel, Project manager /RA Carolyn Lauron Acting for/
Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
AUDIT
SUMMARY
FOR THE KOREA HYDRO AND NUCLEAR POWER CO. LTD ADVANCED POWER REACTOR 1400 NON-LOCA CHAPTER 15 TRANSIENT AND ACCIDENT ANALYSES REVIEW OF THE APR1400 DESIGN CONTROL DOCUMENT The purpose of this memorandum is to document for Licensing Branch 2, the summary of the Regulatory Audit conducted from June 10, 2015 through June 16, 2016. During this period a team from the U.S. Nuclear Regulatory Commission (NRC), Office of New Reactors (NRO),
performed an audit of Korea Hydro and Nuclear Power Co., Ltd. (KHNP), Advanced Power Reactor 1400 (APR1400) information related to Chapter 15 of the KHNP standard design certification application. The purpose of the audit was to gain a better understanding of the calculations supporting the safety analyses presented in the following sections of Chapter 15 of the APR1400 Design Control Document (DCD) and related documentation: 15.0.2, 15.1.1, 15.1.2, 15.1.3, 15.1.4, 15.4.1, 15.4.2, 15.4.3, 15.4.4, 15.4.8, 15.6.2, and 15.6.3. Information contained in the APR1400 Electronic Reading Room was reviewed, and information submitted by KHNP, as part of responses to requests for additional information, was evaluated.
The enclosed summary provides the observations made by the NRC staff during the audit, along with clarifications discussed with KHNP during the audit. A list of audit team members is provided in the audit summary, along with the list of documents reviewed by the NRC staff.
The Enclosure contains the Audit Summary. The plan for this audit, dated June 10, 2015, is documented and can be found in the Agencywide Documents Access System (ADAMS) under Accession No. ML15147A597.
CONTACT: James A. Steckel, NRO/DLSE/LB2 (301) 415-1026 Docket No. PROJ0782
Enclosure:
As stated cc: See next page
Package: ML17013A130 Pkg.
Letter: ML1717013A146 NRR-105 OFFICE DNRL/LB2: PM DLSE/LB2: LA DLSE/LB2: PM NAME JSteckel IBetts MMcCoppin DATE 01/13/17 08/22/18 08/29/18 KHNP Mailing List 7/4/2018 Daegeun (Tony) Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2
E-mail yunho.kim@khnp.co.kr [Yun-Ho Kim]
hansang.kim@khnp.co.kr [Hansang Kim]
dohwan.lee@khnp.co.kr [Do-Hwan Lee]
junghokim@khnp.co.kr [Jung-Ho Kim]
jiyong.oh@khnp.co.kr [Jiyong Andy Oh]
ahn.daegeun@khnp.co.kr [Daegeun Tony Ahn]
jksuh@khnp.co.kr [Jeong Kwan Suh]
hachewung@khnp.co.kr [Che Wung Ha]
kang.deogji@khnp.co.kr [Deog Ji Kang]
sunguk.kwon@khnp.co.kr [Sun Guk Kwon]
ptmaster300@kepco.co.kr [Hyun Chul Park]
sisk1rb@westinghouse.com [Rob Sisk]
robert.sweeney@consultant.aecom.com [Robert Sweeney]
Page 2 of 2