MONTHYEARML19219A2242018-06-28028 June 2018 Chapter_8_Concurrence 8719 ML18073A3912018-03-14014 March 2018 Response to RAI 357-8344, Question 06.02.04-11, Notifying KHNP of the Need for an APR1400 Containment ITAAC to Verify That GDC 55, 56, and 57 Requirements Are Satisfied ML18016A3322018-01-16016 January 2018 Email Response: Removal of PRA-based SMA Insights from Chapter 19 SER and APR1400 Design Certification Rule ML18011B0642018-01-11011 January 2018 Removal of PRA-Based SMA Insights from Chapter 19 SER and APR1400 Design Certification Rule ML17263B2502017-09-20020 September 2017 APR1400 DCD RAI - APR1400 Design Certification Application RAI 555-9163 (7.2 - Reactor Trip System) 2018-06-28
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML19207A2572019-07-26026 July 2019 LLC Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A2742019-07-26026 July 2019 LLC Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML18243A4682018-08-31031 August 2018 Korea Hydro & Nuclear Power Co., Ltd - WO 89 Response to Digital I&C Questions ML18243A4652018-08-31031 August 2018 Korea Hydro & Nuclear Power Co., Ltd - Submittal of LTR-RAM-17-81, Revision 4, Work Order 89: Response to Digital I&C Questions. ML18225A1382018-08-13013 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 520-8693 for Question 06.02.02-43, (Rev.1) ML18222A3502018-08-10010 August 2018 Korea Hydro & Nuclear Power Co., Ltd. - Response to RAI Er 1-8428 for Question EIS ACC/SA-15 (Rev.4) ML18221A5162018-08-0909 August 2018 Korea Hydro & Nuclear Power Co., Ltd. - Response to RAI 452-8545 for the Question 10.03.06-21 (Rev.1) ML18218A2092018-08-0606 August 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 271-8290 for Question 19-15 (Rev. 5) ML18218A2072018-08-0606 August 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to RAI 271-8290 for Question 19-15 (Rev. 5) ML18218A2032018-08-0606 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 312-8343 for Question 19-16 (Rev. 3) ML18218A1952018-08-0606 August 2018 Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 434-8352 for Question 19-92 (Rev.5) ML18205A7322018-07-24024 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 558-9456 for Question 14.03.01-1 (Rev.1) ML18205A7312018-07-24024 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to RAI 558-9456 for Question 14.03.01-1 (Rev.1) ML18205A6372018-07-24024 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to RAI 356-7881 for the Question 07-18 (Rev.3) ML18207A4562018-07-20020 July 2018 Korea Hydro - Revised Response to Request for Additional Information, APR1400 Design Certification, RAI No. 112-8015 ML18201A4002018-07-20020 July 2018 LLC Response to NRC Request for Additional Information No. 491 (Erai No. 9557) on the NuScale Design Certification Application ML18197A2972018-07-13013 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to RAI 88-8046 for Question 03.05.02-4 (Rev.1) ML18197A2962018-07-13013 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 88-8046 for Question 03.05.02-4 (Rev.1) ML18194A8572018-07-13013 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to RAI 432-8377 for Question 19-64 (Rev.7) ML18194A8552018-07-13013 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 432-8377 for Question 19-64 (Rev.7) ML18194A8232018-07-13013 July 2018 Korea Hydro & Nuclear Power Co., Ltd, Revised Response to RAI 316-8305 for the Question 17.04-1 (Rev. 4) ML18190A1622018-07-0909 July 2018 Korea Hydro & Nuclear Power Co, Ltd., Revised Response to RAI 420-8482 for Question 19.03-36 (Rev.2) ML18184A3682018-07-0303 July 2018 Korea Hydro & Nuclear Power Co., Ltd - Response to RAI 301-8280 for the Question 07.01-45 ML18178A5772018-06-27027 June 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI Er 1-8428 for Question EIS ACC/SA-15 (Rev.3) ML18172A3142018-06-21021 June 2018 Korea Hydro & Nuclear Power Co., Ltd - Response to Action Item 5-6 Section 5.4.2.1 Mcb Issue List Regarding APR-1400, FSAR Section 5.4.2.1 ML18172A3132018-06-21021 June 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to Action Item 5-6.11 Regarding Mcb Issue for DCD Section 5.4 ML18170A0592018-06-19019 June 2018 Korea Hydro & Nuclear Power Co, Ltd - Revised Response to RAI 329-8424 for Question 14.03.08-13 (Rev.1) ML18162A3432018-06-11011 June 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 557-9199 for the Question 03.08.05-20 (Rev. 2) ML18155A4082018-06-0404 June 2018 Korea Hydro & Nuclear Power Co, Ltd. - Revised Response to RAI 61-7984 for Question 08.03.01-5 (Rev. 1) ML18155A4012018-06-0404 June 2018 Korea Hydro & Nuclear Power Co, Ltd. - Revised Response to RAI 297-8309 for Question 19.03-1 (Rev.2) ML18155A3932018-06-0404 June 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to RAI 297-8309 for Question 19.03-2 (Rev. 1) ML18155A3922018-06-0404 June 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 297-8309 for Question 19.03-2 (Rev. 1) ML18155A3822018-06-0404 June 2018 Korea Hydro & Nuclear Power Co., Ltd'S Revised Response to RAI 420-8482 for Question 19.03-36 (Rev. 1) ML18150A5832018-05-30030 May 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to RAI 557-9199 for the Question 03.08.05-20 ML18150A5802018-05-30030 May 2018 Korea Hydro & Nuclear Power Co., Ltd - Submittal of Revised Response to RAI 557-9199 for the Question 03.08.05-20 ML18145A0842018-05-25025 May 2018 Korea Hydro & Nuclear Power Co, Ltd. - Revised Response to RAI 301-8280 for the Question 07.01-45 (Rev.2) ML18142A2992018-05-18018 May 2018 Korea Hydro & Nuclear Power Co, Ltd. - Revised Response to RAI 255-8285 for the Question 03.08.05-7 (Rev. 5) ML18142A3062018-05-17017 May 2018 Korea Hydro & Nuclear Power Co., Ltd. - Response to RAI 554-9146 for Question 07.02-18 (Rev. 1) ML18137A4822018-05-17017 May 2018 Korea Hydro & Nuclear Power Co, Ltd. - Response to RAI 558-9456 for Question 14.03.01-1 ML18137A4742018-05-17017 May 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to RAI 128-7980 for the Question 18-18 (Rev. 1) ML18137A4722018-05-17017 May 2018 Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI 128-7980 for the Question 18-18 (Rev. 1) ML18131A1042018-05-11011 May 2018 Korea Hydro & Nuclear Power Co, Ltd - Revised Response to RAI 7-8567 for Question APR1400-4 (Rev. 1) ML18131A1062018-05-11011 May 2018 Korea Hydro & Nuclear Power Co, Ltd - Revised Response to RAI 7-8567 for Question APR1400-4 (Rev. 1) ML18131A1132018-05-11011 May 2018 Revised Response to RAI 412-8525 for Question 08.04-15 (Rev. 1) ML18129A3882018-05-0909 May 2018 Korea Hydro & Nuclear Power Co., Ltd - Revised Response to Request for Additional Information for Question No. 08.01-21 ML18124A1132018-05-0404 May 2018 Korea Hydro & Nuclear Power Co, Ltd - Revised Response to RAI 45-7883 for the Question 07.09-2 (Rev.6) ML18124A1512018-05-0404 May 2018 Korea Hydro & Nuclear Power Co, Ltd - Revised Response to RAI 555-9163 for the Question 07.02-19 (Rev. 2) ML18121A4162018-05-0101 May 2018 Korea Hydro & Nuclear Power Co, Ltd - Revised Response to RAI 433-8363 for Question 19-83 (Rev.2) ML18120A3042018-04-30030 April 2018 Korea Hydro & Nuclear Power Co., Ltd - Response to RAI 342-8291 for Question 07.08-10 (Rev.2) ML18115A3332018-04-25025 April 2018 Korea Hydro & Nuclear Power Co, Ltd. - Revised Response to RAI 553-9084 for the Question 18-134 (Rev.2) 2019-07-26
[Table view] |
Text
From: Ward, William Sent: Wednesday, March 14, 2018 7:09 PM To: 'jiyong oh'; Tony(WDCC); Robert Sisk; 'Wagner, David' Cc: Umana, Jessica; McCoppin, Michael; Santos, Cayetano; Cranston, Gregory; Goel, Raj
Subject:
Response to RAI 357-8344, Question 06.02.04-11, APR1400 Containment ITAAC Dr. Jiyong Oh, I am writing to follow-up on KHNPs response to Request for Additional Information (RAI) 357-8344, Question 06.02.04-11, (dated June 20, 2017, ML17171A364), regarding the ITAAC (Inspections, Tests, Analyses, and Acceptance Criteria) for containment isolation valves (CIV) provided in APR1400 Design Control Document (DCD), Revision 1, Tier 1, Table 2.11.3-2, Containment Isolation System ITAAC. The RAI concerned documenting the compliance of an as-built plant with the requirements of 10 CFR 50, Appendix A, General Design Criteria (GDC) 55, 56, and 57, which require, in part, that isolation valves outside containment should be located as close to containment as practical.
The RAI requested KHNP to answer the question, How will this ITAAC, as written, ensure that the supplied as-built piping distances from the outer CIV to the containment will be such that the valves are located as close to containment as practical? (i.e. describe any inspections, test, or acceptance criteria which will confirm that the as-built piping distances will not exceed those listed in DCD Tier 2, Table 6.2.4-1).
Your response stated:
GDCs 55, 56, and 57 require that isolation valves outside containment should be located as close to containment as practical. The APR1400 design has incorporated this design concept into the location of the containment isolation valves and has reflected the locations in the piping analyses performed. However, in applying the graded approach for piping design and analysis, only specific piping lines that penetrate containment are in the scope of the program and are required to be analyzed. Acceptable containment isolation valve location is assured through the overall design and piping analysis program. The length of pipe between containment and the outboard isolation valve indicated in DCD Tier 2, Table 6.2.4-1 does not necessarily represent a bounding condition for each piping line listed. Therefore, including verification of as-built piping distances as a prescriptive ITAAC item is not meaningful nor practical for a subjective criteria such as locating isolation valves as close as practical to containment and the graded approach for piping analysis that has been implemented for the APR1400.
NRC has reviewed your response and determined that it does not satisfy the requirement for an ITAAC to document the as-built plant meeting the requirements of GDCs 55, 56, and 57 with respect to the location of isolation valves outside containment. NRC understands KHNPs concern regarding the acceptance criteria. However, NRC cannot complete its review without an ITAAC to verify the compliance with GDCs 55, 56, and 57. NRC is requesting KHNP to re-evaluate its response and propose an ITAAC for this purpose. Below is an example, reworded for KHNP, of such an ITAAC proposed by a prior applicant. Please make changes as appropriate for your design, including in the acceptance criteria. If you prefer, you can provide more detail in the design description section (2.11.3.1) of Tier 1, including moving the bulleted
items in the acceptance criteria and referring to them from the acceptance criteria. However, KHNP should consider that the descriptions in 2.11.3.1 and ITAAC have different application lifetimes.
New ITAAC for DCD Tier 1, Table 2.11.3-2, Containment Isolation System ITAAC Design Commitment Inspections, Tests, Acceptance Criteria Analyses
- 11. Containment isolation valves 11. An inspection and 11. A report exists and concludes outside the containment as listed analysis will be that the outside containment in Table 2.11.3-1 and as shown performed to verify the isolation valves listed in Table in Figure 2.11.3-1, are located as as-built location of 2.11.3-1 and shown in Figure close to the containment as outside containment 2.11.3-1 are located as close practical, consistent with General isolation valves. to the containment as Design Criteria 55, 56, and 57. practical with consideration of the following:
- Access for inspection of welds
- Valve maintenance Please provide a revised response to RAI 357-8344, Question 06.02.04-11, which includes an ITAAC to verify compliance with GDCs 55, 56, and 57, as discussed above.
If you have any questions, please contact me.
Sincerely, William R. Ward, P.E.
APR1400 DCA Lead Project Manager U.S. Nuclear Regulatory Commission m/s O8-G9A Washington, DC, 20555-0001 NRO/DNRL/Licensing Branch 2 ofc O8-H15 ofc (301) 415-7038 U.S. NRC Protecting People and the Environment Please consider the environment before printing this email.