APR1400 Chapter 19, Section 19.0 and Section 19.1, Probabilistic Risk Assessment and Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Letter to KHNP
ML18128A113
Person / Time
Site: 05200046
Issue date: 05/08/2018
From: William Ward
NRC/NRO/DNRL/LB2
To: Kim H
Korea Hydro & Nuclear Power Co, Ltd
Steckel J / 415-1026
Shared Package
ML18128A109 List:
References
Download: ML18128A113 (5)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION May 8, 2018 Dr. Han-Gon Kim, Project Manager APR1400 Design Certification Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd.

70-1312-gil, Yuseong-daero Yuseong-Gu, Daejeon 305-343 Korea (Republic of)

SUBJECT:

ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 19, SECTIONS 19.0 and 19.1, PROBABILISTIC RISK ASSESSMENT

Dear Dr. Kim:

The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items (OIs) for each chapter of Revision 2 to the Advanced Power Reactor 1400 Design Certification Application, submitted by Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd. (KHNP) on March 8, 2018.

The staffs SE with no OIs for Chapter 19, Sections 19.0 and 19.1, Probabilistic Risk Assessment, is being provided to the Advisory Committee on Reactor Safeguards (ACRS)

Subcommittee to support upcoming meeting of the ACRS Subcommittee, scheduled to be held on June 5, 2018.

The enclosed SE with no OIs is being provided to KHNP for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does contain information for which exemption from public disclosure has been sought or approved; however, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains exempt information but no factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.

Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION H. Kim If you have any questions or comments concerning this matter, I can be reached at (301) 415-7038 or via e-mail address at William.Ward@nrc.gov.

Sincerely,

/RA Michael McCoppin Acting For/

William R. Ward, Senior Project Manager Licensing Branch 2 Division of New Reactor Licensing Office of New Reactors Docket No.: 52-046

Enclosure:

As stated cc w/encl.: See Next Page OFFICIAL USE ONLY - PROPRIETARY INFORMATION

ML18128A113 (letter) *via email NRO-002 OFFICE NRO/DNRL/LB2: PM NRO/DNRL/LB2: LA NRO/DNRL/LB2: PM NAME JSteckel CSmith* (MMcCoppin WWard*

For)

DATE 05/08/2018 5/8/2018 5/08/2018 KHNP Mailing List Daegeun (Tony) Ahn Director KHNP Washington DC Center 8100 Boone Blvd, Suite 620 Vienna, VA 22182 Page 1 of 2

Email kimhg1108@khnp.co.kr [Han-Gon Kim]

hansang.kim@khnp.co.kr [Hansang Kim]

dohwan.lee@khnp.co.kr [Do-Hwan Lee]

junghokim@khnp.co.kr [Jung-Ho Kim]

yunho.kim@khnp.co.kr [Yun Ho Kim]

jiyong.oh@khnp.co.kr [Jiyong Andy Oh]

ahn.daegeun@khnp.co.kr [Daegeun Tony Ahn]

jksuh@khnp.co.kr [Jeong Kwan Suh]

hachewung@khnp.co.kr [Che Wung Ha]

kang.deogji@khnp.co.kr [Deog Ji Kang]

sunguk.kwon@khnp.co.kr [Sun Guk Kwon]

ptmaster300@kepco.co.kr [Hyun Chul Park]

sisk1rb@westinghouse.com [Rob Sisk]

david.wagner@aecom.com [David Wagner]

robert.sweeney@consultant.aecom.com [Robert Sweeney]