NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included

From kanterella
Jump to navigation Jump to search

Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included
ML20211G079
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/25/1999
From: Oconnor W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211G084 List:
References
CON-NRC-99-0078 TAC-MA1465, NUDOCS 9908310154
Download: ML20211G079 (5)


Text

1 s'

, fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison August 25,1999 NRC-99-0078 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001 References; l) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

2) Detroit Edison Letter to NRC, NRC-98-0043,

" Proposed Technical Specification Change -

(License Amendment)-Conversion to Improved Standard Technical Specifications,

dated April 3,1998

Subject:

Transmittal of Revision 14 to Fermi 2 Improved Technical Specification Submittal (TAC No. M A1465)

Attached please find Revision 14 to the Fermi 2 Improved Technical Specification (ITS) Submittal (Reference 2). The purpose of this revision is to provide an update for the remaining open issues associated with NRC review of the ITS submittal.

Attachment I contains a brief abstract of the changes included in this revision.

l Attachment 2 contains the revised pages for the submittal along with revision instructions.

Should you have any questions or require additional information, please contact Mr. Norman K. Peterson of my staff at (734) 586-4258.

Sincerely, U) D 0 '%

W. T. O'Connor, Jr.

9908310154 990825yi Assistant Vice President ppR ADOCK O g g Nuclear Assessment J P .t

  • Attachments

)

cc: A. J. Kugler  ;

A. Vegel ,I NRC Resident Office Regional Administrator, Region III

-fhD li Supervisor, Electric Operators, j Michigan Public Service Commission

)

A DTE Energy Company L

'.. k

[ USNRC.

NRC-99-0078 l.

Page 2 I, WILLIAM T. O'CONNOR, JR., do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.'

l 1

WC .DokN William T. O'Connor, Jr. U Assistant Vice President Nuclear Assessment On this day of // G'M ,1999 before me personally appeared William T. O'Connor, Jr., being first duly sworn and says that he executed the foregoing as his free act and deed.

kAllb5 f)til't Notary Public l ROSAUE A. ARME1TA I' HOTARYPUBUC MONROECOUNTY,MI MY COMMISSION EXPIRES 10/11/09 I

i

~

l i

1 1 4 i

-l

l. ]

/

1 o

k i

ATTACHMENT 1 TO NRC 99-0078 ABSTRACT OF REVISION 14 TO THE FERMI 2 IMPROVED TECHNICAL SPECIFICATION SUBMITTAL 1

l

s' Attachment I to NRC-99-0078 Page 2 Abstract of Revision 14 to the Fermi 2 Improved Technical Specification Submittal Revision 14 to the Fermi 2 Improved Technical Specification (ITS) submittal incorporates issues j remaining from NRC review of the ITS. Revision bars are provided to aid in identification of the i changed material. For those changes associated with an RAI, the RAI number is included with j the revision bar.

Minor corrections are included in this revision. These changes consist of various format, spelling, labeling, and editorial enhancement and/or technical changes typically identified during i implementation preparation. The revision bars for these changes are, except where noted, marked with a circled "A".

The following lists specific changes in Revision 14:

ITS 3.3.3.1 Discussion of Change (DOC) A.6 has been modified to remove an unnecessary  ;

sentence as requested by the NRC reviewer.

=

ITS 3.3.4.1 DOC A.4 has been clarified based upon discussions with the NRC reviewer.

=

For ECCS Instrumentation, the required number of channels per function has now been included in the ITS. Associated Bases changes have also been made. l

=

ITS 3.3.5.1 DOCS A.10 and M.1 have corrections for references to Actions.

=

ITS 3.3.6.2 DOC L.2 has been clarified based upon discussions with the NRC reviewer.

l

=

Action B ofITS 3.3.6.3, LLS Instrumentation, has been restructured for clarity. The previously proposed Action B.1 has been split into two actions.

The ISTS markup for Table 3.3.2.1-1 has been corrected to correspond with the CTS markup and clean typed ITS.

=

The ISTS markup for ITS 5.7.3 has been changed to reflect the clean typed ITS. This results in the elimination of DOC A.4.

=

The ISTS markup for note b to Table 3.3.1.1-1 has been modified to reflect the clean typed ITS.

=

The clean typed definition of Channel Functional Test has been corrected to correspond with the ISTS markup.

In response to RAI S3.6.2.4-1, the ITS now includes a specification for the Suppression Pool Spray system. This specification was provided in Revision 11 to the ITS submittal.

_ _.3

/

t 1

ATTACHMENT 2 TO NRC 99-0078 INSERT AND REMOVAL SHEETS i