MONTHYEARML20217N4261999-10-25025 October 1999 Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0049, Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included ML20209C1081999-06-29029 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 30 NRC-99-0050, Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included1999-06-24024 June 1999 Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included NRC-99-0075, Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld1999-06-22022 June 1999 Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld ML20212J3861999-06-18018 June 1999 Forwards Rev 29 to Approved UFSAR LCR That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0047, Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl1999-06-0909 June 1999 Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl ML20195G2001999-06-0808 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 28 ML20195E7391999-06-0303 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 27 NRC-99-0046, Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 11999-06-0202 June 1999 Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 1 ML20207D9631999-05-26026 May 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) ML20195B3381999-05-19019 May 1999 Forwards Rev 25 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) NRC-99-0040, Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative1999-05-14014 May 1999 Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative NRC-99-0039, Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl NRC-99-0041, Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl NRC-99-0038, Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii)1999-05-14014 May 1999 Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii) NRC-99-0045, Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl1999-05-0707 May 1999 Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl NRC-99-0044, Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses1999-04-30030 April 1999 Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses NRC-99-0059, Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate1999-04-29029 April 1999 Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate ML20206E2941999-04-28028 April 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 24 NRC-99-0037, Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl1999-04-26026 April 1999 Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl 1999-09-08
[Table view] |
Text
. - . - . .
4
,. Douglas R. Gipson
- Senior Vee Presdent Nuclear Generatson Detroit r.,6 l
6400 North Dixie Highway Newport, Michigan 48166 (313) 586-5249 April 19,1996 NRC-96-0041 P
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
References:
1). Fermi 2 i NRC Docket No. 50-341 NRC License No. NPF-43
- 2) NRC Letter to Detroit Edison, " Technical Specification Change l Request - Emergency Diesel Generator Allowed Outage Time l Extension (TAC No. M94171)," dated March 22,1996
- 3) Detroit Edison Letter to NRC," Proposed Technical Specification Change (License Amendment) - Emergency Diesel Generator Action Statements, Surveillance Requirements and
- Report," NRC-95-0124, dated November 22,1995 -
l
- 4) Detroit Edison Letter to NRC, " Request for Enforcement Discretion," NRC-96-0038, dated March 11,1996
- 5) NRC Letter to Detroit Edison, " Notice of Enforcement Discretion for the Detroit Edison Company Regarding Fermi l Unit 2 (NOED No. 96-3-001)," dated March 13,1996
- 6) Detroit Edison Letter to NRC," Response to Questions on Proposed Emergency Diesel Generator Technical Specification Change," NRC-96-0008, dated February 19,1996
$fQQQj 7) NRC Staff Requirements Memorandum, "SECY-90-340 -
l
" Diesel Generator Reliability," Resolution of Generic Safety Issue B-56 (COMJC-91-001/001-A)", dated June 26,1991
Subject:
Response to NRC Letter on Emergency Diesel Generator
, Allowed Outage Time Extension (TAC No. M94170
! This letter provide, Detroit Edison's response to the questions asked in Enclosure 2 of Reference 2 and furing an April 1,1996 conference call. The questions pertain to Detroit Edison's request to increase the allowed out-of-service time for one onsite AC electrical power division (Reference 3). Responses to the questions in Enclosure 1 of Reference 2 have also been drafted and will be discussed during the upcoming 9604240036 960419 PDR ADOCK 05000341
[ON ,I ,
P PDR
^
USNRC
- April 19,1996 NRC-96-0041 Page 2 onsite working level meeting on the probabalistic safety assessment (PSA) evaluation used to support the proposed Technical Specification Change or separately submitted.
The following commitment is being made by this letter, contingent upon approval of the proposed Technical Specification:
' Detroit Edison will verify (by administrative check) that the Alternate AC source (AAC) is functional before removing an Emergency Diesel Generator (EDG) from service for a planned extended period (> 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />), such as for the 18 month inspection, during plant operation. This verification (by administrative check of breaker, AAC source, and line availability) will confirm that the AAC source is capable of supplying power to Division 1 loads if needed. The capability of the AAC source to be connected to Division I loads will also be verified every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (with up to 25% extension) thereafter during a planned extended EDG outage.
Detroit Edison sincerely hopes the responses in the enclosure to this letter will facilitate prompt completion of the NRC review of the proposed Technical >
Specification changes. If there are any additional questions, please contact Lynne Goodman at (313) 586-4097 promptly, so they can be expeditiously answered.
Detroit Edison understands the NRC review could not be completed by March 31, 1996 as originally requested, however, completion by May 31,1996 would be greatly appreciated.
Sincerely, 1 I
l Enclosure Attachment cc: T. G. Colburn M. J. Jordan H. J. Miller A. Vegel 1
l Enclosure to NRC-96-0041 Page1 l
t RESPONSES TO REFERENCE 2 ENCLOSURE 2 OUESTIONS NRC Ouestion 1:
l In your submittal of November 22,1995, you proposed to extend the allowed outage time (AOT) from 3 days to 7 days for each emergency diesel generator I (EDG) in order to perform preventive maintenance (PM) and corrective maintenance (CM). The extending EDG AOT for PM such as the 18-month
! manufacturer-recommended inspection could be beneficial as it involves
- teardowns or preplanned PM or modifications that could extend beyond the l original AOT. However, it appears that the 3 day AOT has been adequate for !
CM (for example, an inoperable EDG)in the past. It is not clear now why the 7-day AOT time period is needed for CM. Please state your reason for extending your current CM for the EDG AOT. Your response should also include instances where your current AOT was insuflicient to perform CM. ;
Detroit Edison Response:
In general, the 3 day allowed out-of-service time (AOT) has been adequate for I corrective maintenance. However, in a recent case, which occurred afler the proposed Technical Specification change was submitted, the AOT was insufficient
- (due to a fuel oil quality problem discovered after planned work was completed).
Enforcement discretion was requested and received due to the circumstances l described in References 4 and 5. There have been infrequent occasions in the past
, when maintenance, which would have improved reliability, was deferred because i
the AOT could have been challenged.
The main reason for not requesting separate AOTs for corrective maintenance and i preplanned teardowns, preventive maintenance or modifications is the added complexity of having different AOTs for different circumstances. Separate AOTs i would add to complexity in Technical Specifications, which could unduly l
challenge the plant operators.
The specification could also be subject to interpretation differences. For example, what if during an EDG test at the end of preventive maintenance, an unrelated problem was found necessitating corrective maintenance? The operators, as well as the plant staff could be confused as to the proper application of the Technical Specification. Detroit Edison believes a simple 7 day AOT would avoid
! unnecessary operator confusion.
. Additionally, the majority of plants that have a 7 day AOT do not have separate AOTs for preventive and corrective maintenance. For these reasons, a single AOT for one division of onsite AC electrical power being inoperable was
! requested.
- - . - - - . - - .--. ~ - .. .. -- . -. . _ . .. . ...- - - - . -
l l- '
Enclosure to NRC-96-004 i l
Pege 2 l NRC Ouestion 2:
l l The staff has recently granted an extension of an EDG AOT to a plant that has l- installed a weather-protected tie-line from a hydro station used as an alternate ac l (AAC) source which will be substituted for the inoperable EDG during the I
extension. The extension was granted based on the licensee's commitment to l meet the following conditions. Except as noted, provide a discussion of how you would address each condition listed below as related to Fermi 2.
- a. The Technical Specification (TS) should include verification that the required systems, subsystems, trains, components, and devices that depend on the remaining EDGs as a source of emergency power are operable before removing an EDG for PM. In addition, positive measures should be provided to preclude subsequent testing or maintenance activities on these systems, subsystems, trains, components, and devices while the EDG is inoperable. This was described in Fermi's 2/19/96 letter.
- b. The overall unavailability of the EDG should not exceed the value that was used in the probabilistic risk assessment (PRA) supporting the proposed AOT. Also, the EDG unavailability should be monitored and con't rolled in accordance with the maintenance rule performance goals.
This discussion was provided in Fermi's 2/19/96 letter.
- c. Before taking an EDG out for an extended period, the AAC source should be verified: (1) that it is functional: (2) that the power source is capable of i being connected to the safety bus associated with the inoperable EDG; and (3) that this capability of being connected to the safety bus associated with the inoperable EDG is verified once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (shift) thereafter.
. 1 i -
- d. Voluntary entry into a limiting condition for operation (LCO) action I statement to perform PM should be contingent upon a determination that
- the decrease in plant safety is small enough and the level of risk to the plant will be acceptable for the period and is warranted by operational necessity, not by convenience.
e.- Voluntary entry into an LCO actior, statement should not be abused by repeated entry into and exit from the LCO. )
l
- f. Removal from service of safety systems and important nonsafety
[ equipment, including offsite power sources, should be minimized during l
{ the outage of the EDG for PM. This discussion was provided in Fermi's 2/19/96 letter.
}
a
! g. Voluntary entry into an LCO action statement shoulo not be scheduled I
when adverse weather is expected. This discussion was provided in
- Fermi's 2/19/96 letter.
1
. 4+_-. - - , - ,m _, m-.. ,. . -- - ,,- , _ . , ..- .-,--- - _ --,9- ,,
Enclosure to NRC-96-0041 Page 3 Detroit Edison Response: ;
I Detroit Edison's response will address items c-e since Items a, b, f and g were previously addressed in Reference 6 as indicated in the NRC question.
As discussed in Reference 6, Detroit Edison personnel normally determine what other equipment is inoperable prior to removing an EDG from service. This
{
includes checking that CTG 11-1, the AAC source, is available before l
intentionally removing a diesel generator from service for maintenance. This is an l administrative check, not a specific test. CTG 11-1 is started monthly as required l by Technical Specification 4.7.11.2, to ensure it remains operable.
' Reference 6 also addressed that CTG 11-1 is capable of and proceduralized to !
supply all Division 1 safe shutdown loads. However, CTG 11-1 is a manually started unit and it cannot fulfill starting <me and automatic loading functions of the EDGs.
To specifically address NRC Item c, Detroit Edison will commit to verify (by administrative check) that ihe AAC source is functional before removing an EDG from service for a planned extended period (> 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />), such as for the 18 month inspection, during plant operation. This verification (by administrative check of breaker, AAC source, and line availability) will confirm that the AAC source is capable of supplying power to Division I loads, if needed. The capability of the AAC source to be connected to Division I loads will be verified every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (with up to 25% extension) thereafter during a planned, extended EDG outage.
The difference between the above and the NRC request is that the AAC source will be checked to ensure that it is capable of being connected to Division I loads instead of being connected to the safety bus associated with the inoperable EDG.
From a safety standpoint, adequate protection against station blackout will still be maintained for reasons described below:
If a loss of offsite power occurs while a division of EDGs is out-of-service, the other division of EDGs will be able to supply the loads needed for safe shutdown and the AAC source would not be needed. If additional EDG failures occur, preventing the operable onsite AC power divisional EDGs from performing their function, resulting in station blackout, CTG 11-! would be able to supply Division I loads to accomplish safe shutdown, regardless of which EDGs were originally inoperable.
NRC representatives asked whether CTG 11-1 can supply Division 2 loads through a cross tie. As discussed in Reference 6, the capability of CTG 11-1 to supply Division 2 loads has not been specifically evaluated or tested. As discussed in Reference 3, the operation of cross tie breakers are administratively controlled to be used in the shutdown condition only. In response to the NRC
Enclosure to
' NRC-96-0041 Page 4 question, a simple assessment has been performed based on the procedure for operation of the maintenance cross tie breakers and the equipment loading, as addressed in the Updated Final Safety Analysis Report. The conclusion reached was that CTG 11-1 could be used to supply some Division 2 equipment.
However, a very detailed model and evaluation would be needed to determine whether all equipment could be supplied, since equipment starting currents, voltage drops and the response of the maintenance tie breaker to load changes would need to be evaluated. The current through the maintenance tie breaker is limited, which limits the loads that could be supplied. Based on this conclusion, a detailed engineering evaluation will not be performed. As addressed earlier, CTG 11-1 can supply Division I station blackout safe shutdown loads regardless of l whether the Division 1 EDGs were out of service for maintenance or whether the Division 1 EDGs failed to operate when needed.
Voluntary entry into an LCO for key safety equipment, such as EDGs. is planned contingent upon a determination that the decrease in plant safety is small enough and level of risk is acceptable for the time period and is warranted by operational necessity, Technical Specification requirements, the need to maintain equipment reliability, or by a qualitative determination that the risk of performing a needed task on-line is not significantly greater than performing it while the plant is shutdown.
l As discussed in Reference 3, performing the 18 month EDG inspection while the plant is on-line will significantly improve EDG availability during plant outages.
This will help in reducing shutdown risk.
Normally, Detroit Edison does not voluntarily repeatedly enter and exit LCO action statements. Rare exceptions occur when information needs to be obtained to prepare for a task that can only be obtained by rendering the equipment temporarily inoperable or when advanced preparatory work needs to be performed.
NRC Ouestion 3; When an EDG is taken out of service, is it assumed that the whole engineered safety feature electrical power division is inoperable for the purpose of calculating l
- the increase in CDF7 If not, why not?
i
)
e J
}
_~ _ _ _ _
i 1
Enclosure to l
' NRC-96-0041 ;
Page 5 Detroit Edison Response:
i No, the PSA evaluation for an EDG taken out-of-service considers the specific effects of the EDG being removed from service. The EDG remaining in that ,
division could still supply the emergency power to safety related equipment that '
could be used ifneeded and this is what the PSA evaluation assumes. From a licensing basis standpoint, a division of onsite AC electrical power is inoperable if ,
either EDG is not operable, since both EDGs are needed to supply the full safe I shutdown loads in the division. However, the PSA evaluation is more practical. I Additionally, the PSA is based on more realistic assumptions than licensing basis analyses and so more benefit is achieved from one EDG than would be assumed in licensing basis (e.g.,10CFR50, Appendix K) analyses. This was discussed in i Section 3 of the Fermi 2 IPE report. !
i NRC Ouestion 4: i Provide the current EDG reliability data and the major electrical component failure rates used in the PRA.
Detroit Edison Response:
l Detroit Edison does not actually calculate a reliability number for the EDGs.
Trigger valu,:s were established to monitor reliability. Trigger values compare the ,
number of failures to the number of tests. If trigger values are not exceeded, the !
reliability targets are met. This methodology is based on NUMARC guidance. {
i Adoption of the trigger values was part of an industry wide initiative (No. 5 A) to f monitor the reliability of Emergency Diesel Generators. Considerable l communication between NUMARC and the NRC on the trigger value concept f
was held in 1991 and the NRC's opinion was favorable (Reference 7). !
Detroit Edison's trigger values are established to maintain a reliability of at least 95%. The EDGs at Fermi 2 currently meet the reliability target.
As discussed in Reference 6, future monitoring of EDG performance will be i against Maintenance Rule performance criteria, which includes a conditional !
success probability of greater than 95%. l In a telephone conversation on April 1,1996, NRC representatives asked that the conditional success probability for past EDG performance and for the PSA case ;
with I week of added EDG out of service time per EDG per cycle be addressed m ;
this letter. ;
1 i
- 1 l'
Enclosure to
, NRC-96-0041 f Page 6 Previously, conditional success probability was not calculated for the EDGs.
Based on historical availability and functional failure information collected during preparation for Maintenance Rule implementation, Detroit Edison estimates that the conditional success probability has been greater than 95% per EDG per year.
The mean conditional success probability in the PSA cases performed assuming an additional week of out-of-service time per EDG per cycle was 92% using the IPE model and 92.8% using the current model, assuming no other EDGs have failed
)
and all support is available. If during the scenario, other EDGs fail or status of other EDGs is unknown, the conditional success probability decreases due to the potential of a common cause failure.
Refer to the attached table for the major electrical component failure rates u. d in the Fermi 2 PSA.
Additional NRC Ouestions Durine Anril 1,1996 Telephone Conversation NRC Ouestion:
With the 1,9% maintenance / testing unavailability applied to the total diesel failure rate, provide the actual values for calculated Core Damage Frequency (CDF) for all Station Blackout (SBO) sequences and for total CDF. (This question refers to Reference 6, response to NRC Question 3.)
Detroit Edison Response:
The CDF for SBO sequences for the extended AOT (which corresponds to increased unavailability of 1.9%) was calculated to be 1.39 E-7 by the IPE model and 1,55 E-7 by the current model. The total CDF was calculated to be 5.77 E-6 l by the IPE model and 6.56 E-6 by the current model, as modified by the extended out of service time.
I
- Other NRC Ouestions The answers to other NRC questions conveyed in the April 1,1996 conference call are included in the answers to Questions 2 and 4 since the NRC questions j addressed similar topics.
4 1
e
_ .. . ~ . - ..m_._ .. .
Attachment to NRC-96-0041 -
Fermi 2 PSA Major Electrical Compon2nt Failure Rites Variable Description Mean Variance 5th%ile 50th%ile 95th%ile ZTBATD 130V DC BATTERY - FAILURE OF OUTPUT ON DEMAND 4.8352E-04 2.1450E-07 9.1672E-05 3.5796E-04 1.2345E-03
, ZTBATR 130V DC BATTERY - FAILURE OF OUTPUT DURING OPERATION 7.5319E-07 1.09ME-12 7.7275E-08 4.2624E-07 1.9493E-06 ZTBCilR BATTERY CilARGER - FAILURE DURING OPERATION 1.8605E-05 1.0685E-09 1.2163E-06 9.0545E-06 6.2769E-05 ZTBSIR BUS - FAILURE DURING OPERATION 4.9752E-07 23726E-13 9.5593E-08 3.6527E-07 13040E-06 ZTCBIC CIRCUlT BREAKER (600V AC AND ABOVE)- FAIL TO CLOSE ON 1.6099E-03 3.9385E-06 33457E-04 1.2228E-03 3.8859E-03 l ZTCB10 CIRCUIT BREAKER (600V AC AND ABOVE)- FAILURE TO OPEN O 6.4938E-04 6.5376E-07 7.8792E-05 4.1063E-04 1.8207E-03 ,
ZTCBIT CIRCUIT BREAKER (600V AC AND ABOVE)-TRANSFER OPEN DURIN 8.2841E-07 1.5747E-12 63695E-08 4.4185E-07 2.5834E-06 l ZTCB2C CIRCUIT BKR(AC OR DC,LT.600V)- FAILURE TO CLOSE ON DEM 2.2747E-04 23148E-07 9.4046E-06 1.0223E-04 8.1143E-04 l
ZTCB2O CIRCUIT BKR(AC OR DC,LT. 600V)- FAILURE TO OPEN ON DEM 83901E-04 3.1493E-06 3.4690E-05 3.7708E-04 2.9930E-03 I l
ZTCB2T CIRCUIT BREAKER (AC OR DC, <600V) TRFR OPEN/ CLOSED DUR. 2.6802E-07 8.2054E-14 2.9436E-08 1.5707E-07 1.M03 E-06 ZTDGSI DIESEL GENERATOR - FAILURE DURING FIRST llR OF OPERATION 1.6932E-02 4.1141 E-04 1.6398E-03 1.0570E-02 53106E-02 ZTDGS2 DIESEL GENERATOR - FAILURE TO RUN AFTER FIRST llOUR 2.5001 E-03 7.7666E-06 3.0272E-04 1.7503E-03 6.9729E-03 I ZTDGSS DIESEL GENERATOR - FAILURE TO START ON DEMAND 2.1373E-02 4.0946E-04 33425E-03 1.4642E-02 6.5569E-02 ZTFU1R FUSE - Fall OPEN DURING OPERATION 9.2037E-07 4.0174E-12 3.7588E-08 3.4958E-07 32.254E-06 ZTPSIR POWER SUPPLY +5V DC,+24V DC RPS - FAIL DURING OPERATION 53271E45 12696E-08 2.2025E-06 23942E-05 1.9003E-04 l ZTRL1D RELAY - FAILURE TO OPERATE ON DEMAND 2.4120E-04 1.4678E-07 1.9835E-05 13803E-04 8.2015E-04 ZTRL1R RELAY - FAILURE DURING OPERATION 4.1977E-07 2.6723E-13 3.5141E-08 2.2405E-07 1.5586E-06 ZTXR1R TRANSFORMER (LARGER TIIAN 4.16KV)- FAILURE DURING OPERA 3.7300E-06 2.2228E-11 63262F-07 1.9436E-06 1.6777E-05 ZTXR2R TRANSFORMER (STN. SERVICE,4.16KV TO 600V)- FAIL DURING 6.8693E-07 4.4859E-13 13778E-07 4.9471E-07 1.6550E-06