NOC-AE-04001694, February 2004 Monthly Operating Report for South Texas Project, Units 1 and 2

From kanterella
Jump to navigation Jump to search
February 2004 Monthly Operating Report for South Texas Project, Units 1 and 2
ML040760722
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/11/2004
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-04001694
Download: ML040760722 (14)


Text

Nuclear Operating Compas

&5 1fhtA QdzyU&Zr MHmAkT=77J1 March 11, 2004 NOC-AE-04001694 File No.: G02 10CFR50.71 STI: 31708997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for February 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for February 2004.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen General Manager, Financial Support Attachments: 1) STPEGS Unit 1 Monthly Operating Report - February 2004

2) STPEGS Unit 2 Monthly Operating Report - February 2004

cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U.S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 L. D. Blaylock City Public Service U. S. Nuclear Regulatory Commission Attention: Document Control Desk David H. Jaffe One White Flint North U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 R. L. Balcom Texas Genco, LP Richard A. Ratliff Bureau of Radiation Control A. Ramirez Texas Department of Health City of Austin 1100 West 49th Street Austin, TX 78756-3189 C. A. Johnson AEP Texas Central Company Jeffrey Cruz Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C.-M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT FEBRUARY 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By: ___ _ __ ,__ id_

_ _ 3-10-0' E.D. HALPIN Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO. 50498 UNIT I DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 2/1/04 - 2/29/04 GROSS HOURS IN REPORTING PERIOD: 696
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 696.0 1.384.9 105.400.4
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 696.0 1.368.8 103.696.3
8. UNIT RESERVE SHUTDOWN HOURS 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.693.685 5.256.819 388.224.276
10. NET ELECTRICAL ENERGY GENERATED (MWH) 8981001 1.748.508 126.82.345
11. REACTOR SERVICE FACTOR (%/) 100.0 96.2 77.5
12. REACTOR AVAILABILITY FACTOR (%) 100.0 962 77.5
13. UNIT SERVICE FACTOR (%) 100.0 76.2
14. UNIT AVAILABILITY FACTOR (%) 100.0 95.1 76.2
15. UNIT CAPACITY FACTOR - Using MDC (%) 103.2 97.1 74.6
16. UNIT CAPACITY FACTOR - Using DER (as) 103.2 2211 74.6
17. UNIT FORCED OUTAGE RATE (%) 0.0 4.9 14.6
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1290 17 1290 1291 18 1291 1292 19 1290 1289 20 1291 1289 21 1291 1291 22 1290 1292 23 1290 1291 24 1286 1289 25 1288 1289 26 1291 1290 27 1292 1290 28 1291 1290 29 1289 1290 1291 1292

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT I DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 12 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report#

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I I I I I I I I I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT FEBRUARY 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 Approved By: j Wk E.D. HALPIN h-A _3 ate 4D-Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 2/1/04 - 2/29/04 GROSS HOURS IN REPORTING PERIOD: 696
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 696.0 1,440.0 103.144.4
6. REACTOR RESERVE SHUTDOWN HOURS 0 0
7. HOURS GENERATOR ON LINE 696.0 1,440.0 100.845.5
8. UNIT RESERVE SHUTDOWN HOURS 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.693.685 5,573.049 377.261.154
10. NET ELECTRICAL ENERGY GENERATED (MWH) 888.248 1,836.896 22.935.073
11. REACTOR SERVICE FACTOR (%) 100.0 100.0 80.0
12. REACTOR AVAILABILITY FACTOR (%) 100.0 100.0 80.0
13. UNIT SERVICE FACTOR (%) 100.0 100.0 78.3
14. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 78.3
15. UNIT CAPACITY FACTOR - Using MDC (%/) 102.0 102.0 76.3
16. UNIT CAPACITY FACTOR - Using DER (%) 102.0 102.0 76.3
17. UNIT FORCED OUTAGE RATE (as) 0.0 0.0 13.7
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):

Scheduled 22-day outage to allow refueling to begin on March 31, 2004.

19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1276 17 1276 2 1276 18 1276 3 1276 19 1276 4 1274 20 1276 5 1276 21 1278 6 1277 22 1277 7 1277 23 1276 8 1278 24 1277 9 1276 25 1276 10 1277 26 1276 11 1276 27 1277 12 1275 28 1277 13 1276 29 1276 14 1275 15 1276 16 1276

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE Mar. 8 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report#

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD l_ l l l l l 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

I..

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.