NOC-AE-02001261, January 2002 Monthly Operating Report for South Texas Project, Units 1 & 2

From kanterella
Jump to navigation Jump to search
January 2002 Monthly Operating Report for South Texas Project, Units 1 & 2
ML020650333
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/12/2002
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-02001261
Download: ML020650333 (14)


Text

Nuclear Operating Company South Texas Pro/&ct Nuclear OperallngCompany PO Box 289 Wvadsworth, Trxas 77483 ,

February 12, 2002 NOC-AE-02001261 File No. G02 ST131403045 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for January, 2002 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for January 2002.

If you should have any questions on this matter, please contact R. L. Hill at (361) 972-7667.

Sincerely, F. H. Mallen Manager, Planning & Controls Attachments: 1) STPEGS Unit 1 Monthly Operating Report - January 2002

2) STPEGS Unit 2 Monthly Operating Report - January 2002

NOC-AE- 02001261 File No.: G02 STI No.:31403045 Page 2 cc:

Ellis W. Merschoff Jon C. Wood Regional Administrator, Region IV Matthews & Branscomb U.S. Nuclear Regulatory Commission 112 East Pecan, Suite 1100 611 Ryan Plaza Drive, Suite 400 San Antonio, Texas 78205-3692 Arlington, Texas 76011-8064 Institute of Nuclear Power Mohan C. Thadani Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Project Manager, Atlanta, GA 30339-5957 1 White Flint North 11555 Rockville Place Richard A. Ratliff Rockville, MD 20852-2738 Bureau of Radiation Control Mail Stop: O-7D1 Texas Department of Health 1100 West 49th Street Cornelius F. O'Keefe Austin, TX 78756-3189 U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code MN 16 R. L. Balcom/D. G. Tees Wadsworth, TX 77483 Reliant Energy, Inc.

P. 0. Box 1700 A. H. Gutterman, Esquire Houston, TX 77251 Morgan, Lewis & Bockius 1800 M. Street, N.W. C. A. Johnson/A. C. Bakken, III Washington, DC 20036-5869 AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5022 M. T. Hardt/W. C. Gunst Wadsworth, TX 77483 City Public Service P. 0. Box 1771 U. S. Nuclear Regulatory Commission San Antonio, TX 78296 Attention: Document Control Desk Washington, D.C. 20555-0001 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT JANUARY 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By: - a o ?

E.D. HALPIN Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO. 50-498 UNIT 1 DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 01/1/02-01/31/02 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 744.0 744.0 90,693.9
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 744.0 744.0 89,063.8
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,839,573 2,839,573 332,137,913
10. NET ELECTRICAL ENERGY GENERATED (MWH) 942871 942,871 108,290,985
11. REACTOR SERVICE FACTOR (%) 100.0 100.0 77.0
12. REACTOR AVAILABILITY FACTOR (%) 100.0 100.0 77.0
13. UNIT SERVICE FACTOR (%) 100.0 100.0 75.6
14. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 75.6
15. UNIT CAPACITY FACTOR - Using MDC (%) 101.3 101.3 73.5
16. UNIT CAPACITY FACTOR - Using DER (%) 101.3 101.3 73.5
17. UNIT FORCED OUTAGE RATE (%) 0.0 0.0 14.2
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH JANUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1266 17 1268 2 1267 18 1270 3 1268 19 1270 4 1270 20 1269 5 1262 21 1268 6 1271 22 1271 7 1274 23 1270 8 1271 24 1265 9 1269 25 1266 10 1263 26 1267 11 1263 27 1267 12 1266 28 1257 13 1269 29 1258 14 1267 30 1268 15 1267 31 1271 16 1266

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT 1 DATE Feb. 4,2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH JAUNARY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT JANUARY 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 ApprovedBy:

E.D. HKPIN Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 01/1/02-01/31/02 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 744.0 744.0 88,558.0
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 744.0 744.0 86,371.7
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,838,840 2,838,840 321,999,372
10. NET ELECTRICAL ENERGY GENERATED (MWH) 934,760 934,760 104,892,881
11. REACTOR SERVICE FACTOR (%) 100.0 100.0 80.0
12. REACTOR AVAILABILITY FACTOR (%) 100.0 100.0 80.0
13. UNIT SERVICE FACTOR (%) 100.0 100.0 78.1
14. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 78.1
15. UNIT CAPACITY FACTOR - Using MDC (%) 100.5 100.5 75.8
16. UNIT CAPACITY FACTOR - Using DER (%) 100.5 100.5 75.8
17. UNIT FORCED OUTAGE RATE (%) 0.0 0.0 13.8
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH JANUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1260 17 1257 1257 18 1258 1256 19 1239 1256 20 1257 1259 21 1256 1257 22 1252 1257 23 1251 1256 24 1260 1258 25 1256 1256 26 1259 1262 27 1252 1258 28 1259 1258 29 1261 1258 30 1254 15 1258 31 1258 16 1259

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE Feb. 4, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH JANUARY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1 2 3 4 5 Reason: Method: IEEE 805-1983 IEEE 803-1983 F: Forced S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.