October 2003 Monthly Operating Report
ML033230328
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/12/2003
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02, NOC-AE-03001632, STI: 31670438
Download: ML033230328 (15)


Text

Nuclear Operating Company Am ~

.Sm kw mkfAizq CMM PO An JS9 flWmAtk X741J November 12, 2003 NOC.-AE-03001632 File No.: G02 10CFR50.71 STI: 31670438 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for October, 2003 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for October 2003 and a revised Unit 2 Operating Data Report for April 2003. The April Operating Data Report includes a revised Net Electrical Energy Generated value.

Cumulative totals for the Unit 2 Net Electrical Energy Generated values reflect the revision.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen General Manager, Financial Support Attachments: 1) STPEGS Unit 1 Monthly Operating Report - October 2003

2) STPEGS Unit 2 Monthly Operating Report - October 2003
3) STPEGS Unit 2 Operating Data Report - April 2003

cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U.S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 L. D. Blaylock City Public Service U. S. Nuclear Regulatory Commission Attention: Document Control Desk David H. Jaffe One White Flint North U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 R. L. Balcom Texas Genco, LP Richard A. Ratliff Bureau of Radiation Control A. Ramirez Texas Department of Health City of Austin 1100 West 49th Street Austin, TX 78756-3189 C. A. Johnson AEP Texas Central Company Jeffrey Cruz Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. 0. Box 289, Mail Code: MNI 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT OCTOBER 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 Approved By: /z/leld E.D. PIN Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO. 50-498 UNIT I DATE Nov. 4, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 10/1/03-10/31/03 GROSS HOURS IN REPORTING PERIOD: 745
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 745.0 4,022.4 102,551.5
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 745.0 3,970.4 100.863.5 I Q~+/-
8. UNIT RESERVE SHUTDOWN HOURS 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.842.871 14,8696 377.307.932
10. NET ELECTRICAL ENERGY GENERATED (MWH) 957,565 4.972,589 123.188.644
11. REACTOR SERVICE FACTOR (%) 100.0 55.1 77.0
12. REACTOR AVAILABILITY FACTOR (%) 100.0 55.1 77.0
13. UNIT SERVICE FACTOR (%) 100.0 54.4 75.8
14. UNIT AVAILABILITY FACTOR (%) 100.0 54.4 75.8
15. UNIT CAPACITY FACTOR - Using MDC (%) 102.8 54.5 74.0
16. UNIT CAPACITY FACTOR - Using DER (%) 102.8 54.5 74.0
17. UNIT FORCED OUTAGE RATE (%) 0.0 40.5 14.9
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT PONVER LEVEL DOCKET NO. 50-498 UNIT I DATE Nov. 4. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH OCTOBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1289 17 1284 2 1288 18 1287 3 1286 19 1287 4 1287 20 1286 5 1286 21 1288 6 1285 22 1284 7 1285 23 1283 8 1284 24 1285 9 1282 25 1284 10 1283 26 1286 11 1284 27 1286 12 1284 28 1290 13 1285 29 1289 14 1284 30 1288 15 1286 31 1275 16 1285

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT I DATE Nov. 4. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH OCTOBER 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I_ I I I I I I II I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT OCTOBER 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By: e___ ____ _____ r/6o9 E.D. HALfIN Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Nov. 4 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 10/1/03-10/31/03 GROSS HOURS IN REPORTING PERIOD: 745
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 745.0 5.682.7 100.240.4
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 745.0 5,649.1 97.941.5
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.843.696 21.369,673 365.783,324
10. NET ELECTRICAL ENERGY GENERATED (MWH) 946710 7,064,976 119.242.943 II. REACTOR SERVICE FACTOR (%) 100.0 77.9 79.6
12. REACTOR AVAILABILITY FACTOR (%) 100.0 77.9 79.6
13. UNIT SERVICE FACTOR (%) 100.0 77.4 77.8
14. UNIT AVAILABILITY FACTOR (%) 100.0 77.4 77.8
15. UNIT CAPACITY FACTOR - Using MDC (%) 101.6 77.4 75.7
16. UNIT CAPACITY FACTOR - Using DER (%) 101.6 77.4 75.7
17. UNIT FORCED OUTAGE RATE (%) 0.0 22.6 14.1
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):

Scheduled 22-day outage to allow refueling to begin on March 31, 2004.

19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Nov. 4. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH OCTOBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1264 17 1270 2 1264 18 1271 3 1265 19 1273 4 1270 20 1270 5 1273 21 1270 6 1272 22 1270 7 1271 23 1268 8 1270 24 1269 9 1268 25 1271 10 1268 26 1273 11 1269 27 1277 12 1270 28 1278 13 1270 29 1279 14 1270 30 1276 15 1271 31 1275 16 1270

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50499 UNIT 2 DATE Nov. 4, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH OCTOBER 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I I I I I I I I I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There wvere no PORV or Safety Valves challenged during the reporting period.

OPERATING DATA REPORT DOCKET NO. 50499 UNIT 2 DATE Nov. 4. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 4/1/03-4/30/03 GROSS HOURS IN REPORTING PERIOD: 719
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 719.0 1,265.7 95.823.4
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 719.0 1.232.1 93,524.5
8. UNIT RESERVE SHUTDOWN HOURS 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.744.392 4,518.381 348,932,032
10. NET ELECTRICAL ENERGY GENERATED (MWH) 914.971 1,494.336 113.672,303
11. REACTOR SERVICE FACTOR (%) 100.0 44.0 78.8
12. REACTOR AVAILABILITY FACTOR (%) 100.0 44.0 78.8
13. UNIT SERVICE FACTOR (%) 100.0 42.8 77.0
14. UNIT AVAILABILITY FACTOR (as) 100.0 42.8 77.0
15. UNIT CAPACITY FACTOR - Using MDC (%) 101.8 41.5 74.8
16. UNIT CAPACITY FACTOR - Using DER (%) 101.8 41.5 74.8
17. UNIT FORCED OUTAGE RATE (as) 0.0 57.2 14.7
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A