NOC-AE-02001285, February 2002 Monthly Operating Report for South Texas Project Units 1 & 2

From kanterella
Jump to navigation Jump to search
February 2002 Monthly Operating Report for South Texas Project Units 1 & 2
ML020840319
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/11/2002
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02, NOC-AE-02001285, ST131415048
Download: ML020840319 (14)


Text

Nuclear Operating Company South Texas Projcct N1uclear Operating Company PO Boa 289 Wadsworth, Texas 77483 V March 11, 2002 NOC-AE-02001285 File No. G02 ST131415048 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for February 2002 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for February 2002.

If you should have any questions on this matter, please contact R. L. Hill at (361) 972-7667.

Sincerely, F. H. Mallen Manager, Planning & Controls Attachments: 1) STPEGS Unit 1 Monthly Operating Report - February 2002

2) STPEGS Unit 2 Monthly Operating Report - February 2002

NOC-AE- 02001285 File No.: G02 STI No.:31415048 Page 2 Cc:

Ellis W. Merschoff Jon C. Wood Regional Administrator, Region IV Matthews & Branscomb U.S. Nuclear Regulatory Commission 112 East Pecan, Suite 1100 611 Ryan Plaza Drive, Suite 400 San Antonio, Texas 78205-3692 Arlington, Texas 76011-8064 Institute of Nuclear Power Mohan C. Thadani Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Project Manager, Atlanta, GA 30339-5957 1 White Flint North 11555 Rockville Place Richard A. Ratliff Rockville, MD 20852-2738 Bureau of Radiation Control Mail Stop: O-7D1 Texas Department of Health 1100 West 49th Street Cornelius F. O'Keefe Austin, TX 78756-3189 U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code MN 16 R. L. Balcom/D. G. Tees Wadsworth, TX 77483 Reliant Energy, Inc.

P. 0. Box 1700 A. H. Gutterman, Esquire Houston, TX 77251 Morgan, Lewis & Bockius 1800 M. Street, N.W. C. A. Johnson/A. C. Bakken, Uif Washington, DC 20036-5869 AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5022 M. T. Hardt/W. C. Gunst Wadsworth, TX 77483 City Public Service P. 0. Box 1771 U. S. Nuclear Regulatory Commission San Antonio, TX 78296 Attention: Document Control Desk Washington, D.C. 20555-0001 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT FEBRUARY 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By: . I -? -"

E.D. HALP IN' Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO. 50-498 UNIT 1 DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 02/1/02-02/28/02 GROSS HOURS IN REPORTING PERIOD: 672
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 672.0 1,416.0 91,365.9
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 672.0 1,416.0 89,735.8
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,559,711 5,399,284 334,697,624
10. NET ELECTRICAL ENERGY GENERATED (MWH) 850,795 1,793,66 109,141,780
11. REACTOR SERVICE FACTOR (%) 100.0 100.0 77.1
12. REACTOR AVAILABILITY FACTOR (%) 100.0 100.0 77.1
13. UNIT SERVICE FACTOR (%) 100.0 100.0 75.7
14. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 75.7
15. UNIT CAPACITY FACTOR - Using MDC (%) 101.2 101.3 73.7
16. UNIT CAPACITY FACTOR - Using DER (%) 101.2 101.3 73.7
17. UNIT FORCED OUTAGE RATE (%) 0.0 0.0 14.1
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1269 17 1271 1268 18 1266 1269 19 1185 1269 20 1264 1263 21 1270 1267 22 1270 1263 23 1271 1267 24 1270 1271 25 1269 1273 26 1269 1270 27 1270 1272 28 1270 1276 1270 1271 16 1271

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT 1 DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT FEBRUARY 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By: c E.D. HALPIN E.D.HAL~NI at-e

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 02/1/02-02/28/02 GROSS HOURS IN REPORTING PERIOD: 672
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 672.0 1,416.0 89,230.0
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 672.0 1,416.0 87,043.7
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,563,467 5,402,307 324,562,838
10. NET ELECTRICAL ENERGY GENERATED (MWH) 844,157 1,778,917 105,737,038
11. REACTOR SERVICE FACTOR (%) 100.0 100.0 80.2
12. REACTOR AVAILABILITY FACTOR (%) 100.0 100.0 80.2
13. UNIT SERVICE FACTOR (%) 100.0 100.0 78.2
14. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 78.2
15. UNIT CAPACITY FACTOR - Using MDC (%) 100.4 100.5 76.0
16. UNIT CAPACITY FACTOR - Using DER (%) 100.4 100.5 76.0
17. UNIT FORCED OUTAGE RATE (%) 0.0 0.0 13.8
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1253 17 1257 1252 18 1254 1262 19 1254 1262 20 1257 1254 21 1254 1245 22 1257 1261 23 1258 1253 24 1256 1258 25 1254 1259 26 1256 1260 27 1257 1254 28 1258 1257 1256 15 1258 16 1258

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE Mar. 5, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1 2 3 4 5 Reason: Method: IEEE 805-1983 IEEE 803-1983 F: Forced S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.