NOC-AE-04001680, January 2004 Monthly Operating Report for South Texas Project, Units 1 and 2

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for South Texas Project, Units 1 and 2
ML040490591
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/12/2004
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-04001680, STI: 31697287
Download: ML040490591 (14)


Text

Nuclear Operating Company February 12, 2004 NOC-AE-04001680 File No.: G02 10CFR50.71 STI: 31697287 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for January 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for January 2004.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen 47 General Mandger, Financial Support Attachments: 1) STPEGS Unit 1 Monthly Operating Report - January 2004

2) STPEGS Unit 2 Monthly Operating Report - January 2004

cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U.S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 L. D. Blaylock City Public Service U. S. Nuclear Regulatory Commission Attention: Document Control Desk David H. Jaffe One White Flint North U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 R. L. Balcom Texas Genco, LP Richard A. Ratliff Bureau of Radiation Control A. Ramirez Texas Department of Health City of Austin 1100 West 49th Street Austin, TX 78756-3189 C. A. Johnson AEP Texas Central Company Jeffrey Cruz Jon C. Wood U. .S. Nuclear Regulatory Commission Matthews & Branscomb P. 0. Box 289, Mail Code: MNI 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT JANUARY 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 Approved By: ( °/ 2 E.D. H1P IN Date

MONMTLY

SUMMARY

South Texas Project Unit 1 began the reporting period operating at full power. On January 23, at 1616 the unit experienced an automatic reactor trip caused by high water level in Steam Generator IB. The event was induced by the failure of a ferro resonant transformer in the inverter, which supplies power to distribution panel 1201. The inverter was replaced and the unit was returned to service on January 26, at 1530. Full power was achieved on January 27, at 1529.

OPERATING DATA REPORT DOCKET NO. 50-498 UNIT I DATE Feb 2, 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 1/1/04-1/31/04 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 688.9 688.9 104 704.4
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 672.8 672.8 103,000.3
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,563,134 2,563 134 385,530 591
10. NET ELECTRICAL ENERGY GENERATED (MWH) 850 507 850,507 125,925,344
11. REACTOR SERVICE FACTOR (%) 92.6 92.6 77.4
12. REACTOR AVAILABILITY FACTOR (%) 92.6 92.6 77.4
13. UNIT SERVICE FACTOR (%) 90.4 90.4 76.1
14. UNIT AVAILABILITY FACTOR (%) 90.4 90.4 76.1
15. UNIT CAPACITY FACTOR - Using MDC (%) 91.4 74.4
16. UNIT CAPACITY FACTOR - Using DER (%s) 91.4 91.4 74.4
17. UNIT FORCED OUTAGE RATE (%) 9.6 9.6 14.7
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT I DATE Feb. 2. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH JANUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1290 17 1290 2 1290 18 1291 3 1290 19 1292 4 1289 20 1293 5 1292 21 1291 6 1291 22 1292 7 1292 23 860 8 1284 24 0 9 1291 25 0 10 1291 26 23 11 1291 27 1003 12 1290 28 1292 13 1290 29 1290 14 1291 30 1290 15 1290 31 1291 16 1289

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50498 UNIT I DATE Feb. 2 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH JANUARY 1 ~~~2 3 4 5 No. Date Type Duration Reason Method of Liccnsee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor 04-01 040123 F 71.2 A 3 1-04-001 JB INVT Automatic reactor trip caused by high water level in Steam Generator IB. The event was induced by the failure of a ferro resonant transformer in the inverter, which supplies power to distribution panel 1201. The inverter was replaced.

I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORNS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT JANUARY 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By: r4 'v E.D. HAtPIN Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Feb. 2 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 1/1/04 - 1/31/04 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 744.0 744.0 102.448.4
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 744.0 744.0 100.149.5
8. UNIT RESERVE SHUTDOWN HOURS 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.879.364 374.567.469
10. NET ELECTRICAL ENERGY GENERATED (MWH) 948.648 948.648 122.046.825
11. REACTOR SERVICE FACTOR (%) 1 00.0 100.0 79.9
12. REACTOR AVAILABILITY FACTOR (%) 100.0 100.0 79.9
13. UNIT SERVICE FACTOR (%) 100.0 100.0 78.1
14. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 78.1
15. UNIT CAPACITY FACTOR - Using MDC (%) 102.0 102.0 76.1
16. UNIT CAPACITY FACTOR - Using DER (%) 102.0 102.0 76.1
17. UNIT FORCED OUTAGE RATE (%) 0.0 0.0 13.8
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):

Scheduled 22-day outage to allow refueling to begin on March 31, 2004.

19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWNER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Feb. 2 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH JANUARY DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1277 17 1276 2 1277 18 1276 3 1277 19 1276 4 1277 20 1273 5 1277 21 1275 6 1274 22 1276 7 1277 23 1275 8 1277 24 1267 9 1276 25 1267 10 1276 26 1266 11 1276 27 1275 12 1275 28 1277 13 1275 29 1277 14 1277 30 1276 15 1276 31 1276 16 1276

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE Feb. 2 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH JANUARY 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD

___I I I I . I I I 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

POR 'S AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.