NOC-AE-03001641, November 2003 Monthly Operating Report for South Texas Project, Units 1 and 2

From kanterella
Jump to navigation Jump to search
November 2003 Monthly Operating Report for South Texas Project, Units 1 and 2
ML033510557
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/11/2003
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-03001641, STI: 31677844
Download: ML033510557 (14)


Text

Nuclear Operating Company December 11, 2003 NOC-AE-03001641 File No.: G02 10CFR50.71 STI: 31677844 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for November, 2003 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for November 2003.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen General Manager, Financial Support Attachments: 1) STPEGS Unit 1 Monthly Operating Report - November 2003

2) STPEGS Unit 2 Monthly Operating Report - November 2003

cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U.S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP, 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 L. D. Blaylock City Public Service U. S. Nuclear Regulatory Commission Attention: Document Control Desk David H. Jaffe One White Flint North U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 R. L. Balcom Texas Genco, LP Richard A. Ratliff Bureau of Radiation Control A. Ramirez Texas Department of Health City of Austin 1100 West 49th Street Austin, TX 78756-3189 C. A. Johnson AEP Texas Central Company Jeffrey Cruz Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT NOVEMBER 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 Approved By: r / /

E.D. AALPIN Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO. 50-498 UNIT I DATE Dec. 3. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 11/1/03-11/30103 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (Mxvt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 720.0 4.742.4 103.271.5
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 720.0 4,690.4 101.583.5
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 227412919 17 608,615 379.559.078
10. NET ELECTRICAL ENERGY GENERATED (MWH) 926.350 5,898.939 124,114,994
11. REACTOR SERVICE FACTOR (em) 100.0 59.2 77.2
12. REACTOR AVAILABILITY FACTOR (%) 100.0 59.2 77.2
13. UNIT SERVICE FACTOR (%) 100.0 58.5 75.9
14. UNIT AVAILABILITY FACTOR (%) 100.0 58.5 75.9
15. UNIT CAPACITY FACTOR - Using MDC (%) 102.9 58.8 74.2
16. UNIT CAPACITY FACTOR - Using DER (%) 102.9 58.8 74.2
17. UNIT FORCED OUTAGE RATE (%) 0.0 36.6 14.8
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): NIA
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50498 UNIT I DATE Dec. 3 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH NOVEMBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1288 17 1286 2 1289 18 1290 3 1288 19 1293 4 1288 20 1293 5 1288 21 1291 6 1289 22 1290 7 1289 23 1289 8 1289 24 1292 9 1290 25 1292 10 1289 26 1289 11 1289 27 1290 12 1289 28 1293 13 1289 29 1295 14 1289 30 1292 15 1211 16 1271

UNIT SHUTDOWNS AND POWVER REDUCTIONS DOCKET NO. 50-498 UNIT I DATE Dec.3.2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH NOVEMBER 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I I I I I I I I 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT NOVEMBER 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 Approved By: 1674!

E.D. HWIN Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO. 50499 UNIT 2 DATE Dec. 3, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: I1l//03-11/30/03 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 720.0 6.402.7 100.960.4
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 720.0 6,369.1 98.661.5
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.729.644 24.099.317 368.512.967
10. NET ELECTRICAL ENERGY GENERATED (MWH) 911.232 7.976,208 120.154,175
11. REACTOR SERVICE FACTOR (%) 100.0 79.9 79.7
12. REACTOR AVAILABILITY FACTOR (%) 100.0 79.9 79.7
13. UNIT SERVICE FACTOR (%) 100.0 79.5 77.9
14. UNIT AVAILABILITY FACTOR (%) 100.0 79.5 77.9
15. UNIT CAPACITY FACTOR - Using MDC (%) 101.2 79.6 75.8
16. UNIT CAPACITY FACTOR - Using DER (%) 101.2 79.6 75.8
17. UNIT FORCED OUTAGE RATE (as) 0.0 20.5 14.0
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):

Scheduled 22-day outage to allow refueling to begin on March 31, 2004.

19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Dec.3 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH NOVEMBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1275 17 1274 1279 18 1275 1274 19 1275 1274 20 1277 1273 21 1276 1251 22 1276 1102 23 1276 1199 24 1277 1278 25 1278 1273 26 1277 1265 27 1277 1267 28 1279 1268 29 1279 1274 30 1278 1269 1276

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE Dec. 3. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH NOVEMBER 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I_ I I I I I I II I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) I-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.