Category:Letter type:NL
MONTHYEARNL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0672, Licensee Guarantees of Payment of Deferred Premiums2023-08-10010 August 2023 Licensee Guarantees of Payment of Deferred Premiums NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0611, Core Operating Limits Report, Cycle 11 Version 12023-07-19019 July 2023 Core Operating Limits Report, Cycle 11 Version 1 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0584, Preservice Inspection Program Owner'S Activity Report2023-07-10010 July 2023 Preservice Inspection Program Owner'S Activity Report NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0541, Inservice Inspection Program Owners Activity Report for Outage 1R242023-06-28028 June 2023 Inservice Inspection Program Owners Activity Report for Outage 1R24 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) NL-23-0455, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2023-06-12012 June 2023 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0346, License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007)2023-05-25025 May 2023 License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0398, Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-05-16016 May 2023 Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0326, Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-1082023-05-0101 May 2023 Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 NL-23-0330, Core Operating Limits Report, Cycle 25, Version 12023-04-26026 April 2023 Core Operating Limits Report, Cycle 25, Version 1 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0135, License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005)2023-04-17017 April 2023 License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005) NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI 2024-01-29
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 NL-23-0152, License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-04-11011 April 2023 License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0136, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-04-0505 April 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-22-0764, License Amendment Request to Revise Technical Specification 1.1 and Add 5.5.23 to Use Online Monitoring Methodology2022-12-21021 December 2022 License Amendment Request to Revise Technical Specification 1.1 and Add 5.5.23 to Use Online Monitoring Methodology NL-22-0799, License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52022-12-20020 December 2022 License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 ND-22-0894, License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005)2022-12-19019 December 2022 License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005) NL-22-0897, Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A,2022-12-0909 December 2022 Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, ML22286A1252022-11-16016 November 2022 Issuance of Amendments Nos. 217 & 200 Regarding Revision to Technical Specifications to Adopt TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value NL-22-0288, License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2022-06-30030 June 2022 License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-22-0208, License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902022-06-30030 June 2022 License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-21-0925, Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2021-12-22022 December 2021 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-21-0994, Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes2021-12-22022 December 2021 Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes NL-21-0989, License Amendment Request to Relocate Augmented Piping Inspection Program Details2021-12-22022 December 2021 License Amendment Request to Relocate Augmented Piping Inspection Program Details NL-21-1017, License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure2021-12-13013 December 2021 License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure NL-21-0930, Joseph F. Farley Nuclear Plant, Units 1 & 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-10-21021 October 2021 Joseph F. Farley Nuclear Plant, Units 1 & 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections NL-21-0845, License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System2021-09-30030 September 2021 License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements NL-21-0658, Joseph Farley, Units 1 and 2, Vogtle, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for for Steam Generator Tube Inspections2021-09-17017 September 2021 Joseph Farley, Units 1 and 2, Vogtle, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for for Steam Generator Tube Inspections NL-21-0613, Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, .2021-06-30030 June 2021 Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, . NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications2021-06-22022 June 2021 License Amendment Request to Remove Table of Contents from Technical Specifications NL-21-0042, Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System2021-06-0909 June 2021 Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System NL-20-0173, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values2021-03-30030 March 2021 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values NL-21-0065, License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls2021-03-25025 March 2021 License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls NL-20-0949, License Amendment Request to Revise, Technical Specifications to Adopt TSTF-541, Revision 22020-10-30030 October 2020 License Amendment Request to Revise, Technical Specifications to Adopt TSTF-541, Revision 2 ML20224A4642020-08-11011 August 2020 Southern Nuclear Operating Co, Inc - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML20192A1402020-06-30030 June 2020 Southern Nuclear Operating Co., Inc. - License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions NL-20-0275, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2020-05-29029 May 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ND-20-0093, Supplement to Request for License Amendment: Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (LAR-19-014S1)2020-02-14014 February 2020 Supplement to Request for License Amendment: Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (LAR-19-014S1) ND-19-1483, Request for License Amendment: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis (LAR-19-019)2019-12-13013 December 2019 Request for License Amendment: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis (LAR-19-019) NL-19-0331, License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors2019-12-12012 December 2019 License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors NL-19-0963, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process2019-12-11011 December 2019 Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process NL-19-1063, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition2019-12-10010 December 2019 Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition NL-19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-07-15015 July 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NL-19-0635, End State Revision from Hot Shutdown to Cold Shutdown for Several Technical Specifications2019-07-0909 July 2019 End State Revision from Hot Shutdown to Cold Shutdown for Several Technical Specifications NL-19-0771, Risk Informed Technical Specification Information Only Bases Changes2019-06-27027 June 2019 Risk Informed Technical Specification Information Only Bases Changes NL-18-1302, License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ...2018-12-19019 December 2018 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ... NL-18-0668, Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2018-12-14014 December 2018 Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material NL-18-1189, Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations- TSTF-51 and TSTF-4712018-11-29029 November 2018 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations- TSTF-51 and TSTF-471 ML18226A0942018-08-0909 August 2018 Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables NL-18-1043, License Amendment Request: Supplement to Request to Incorporate Seismic Probabilistic Risk Assessment Into the Categorization Process2018-08-0606 August 2018 License Amendment Request: Supplement to Request to Incorporate Seismic Probabilistic Risk Assessment Into the Categorization Process NL-18-0039, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ...2018-07-27027 July 2018 License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ... NL-18-0733, Supplement to License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow and Response to Request for Additional Information2018-06-0707 June 2018 Supplement to License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow and Response to Request for Additional Information ND-18-0417, Supplement to Request for License Amendment and Exemption: Changes to Tier 2 Departure Evaluation Process2018-04-0606 April 2018 Supplement to Request for License Amendment and Exemption: Changes to Tier 2 Departure Evaluation Process ML18065A0252018-03-0606 March 2018 Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures 2023-08-28
[Table view] Category:Technical Specification
MONTHYEARML23318A0702023-10-31031 October 2023 Technical Specifications Bases ML23165A2192023-06-13013 June 2023 Enclosure 9: Vogtle Electric Generating Plant, Units 3 and 4, Technical Specifications Bases, Revision 73 NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document NL-22-0977, License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing2023-02-0909 February 2023 License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing NL-23-0076, Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004)2023-01-31031 January 2023 Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004) NL-23-0020, Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality2023-01-12012 January 2023 Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ND-22-0881, License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002)2023-01-0303 January 2023 License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002) ND-22-0894, License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005)2022-12-19019 December 2022 License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005) ML22307A0072022-11-0202 November 2022 Draft LAR for TS 3.8.3 Inverters Operating Completion Time Extension ML22326A1092022-10-31031 October 2022 Bases for Improved Technical Specifications NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0609, Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2022-09-13013 September 2022 Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-22-0208, License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902022-06-30030 June 2022 License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 ML22179A1482022-06-15015 June 2022 Technical Specifications Bases, Revision 70 NL-21-0925, Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2021-12-22022 December 2021 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-21-1017, License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure2021-12-13013 December 2021 License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure NL-21-0984, Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls2021-11-10010 November 2021 Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls ML21313A3262021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21313A3272021-10-28028 October 2021 0, Technical Specification Bases NL-21-0845, License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System2021-09-30030 September 2021 License Amendment Request: Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System NL-21-0613, Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, .2021-06-30030 June 2021 Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, . NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications2021-06-22022 June 2021 License Amendment Request to Remove Table of Contents from Technical Specifications ML21179A0952021-06-15015 June 2021 8 to Technical Specifications Bases, List of Effective Sections NL-21-0444, Supplement to License Amendment Request to Revise Technical Specification 3.3.5.2 Allowable Values2021-05-0606 May 2021 Supplement to License Amendment Request to Revise Technical Specification 3.3.5.2 Allowable Values ML21102A2222021-03-30030 March 2021 3 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report NL-21-0265, 3 to Updated Final Safety Analysis Report, Bases for Improved Technical Specifications2021-03-30030 March 2021 3 to Updated Final Safety Analysis Report, Bases for Improved Technical Specifications NL-20-0173, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values2021-03-30030 March 2021 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML20125A2122020-04-28028 April 2020 Revisions to Technical Specification Bases Changes NL-19-0331, License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors2019-12-12012 December 2019 License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors NL-19-1063, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition2019-12-10010 December 2019 Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown NL-19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-07-15015 July 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NL-19-0771, Risk Informed Technical Specification Information Only Bases Changes2019-06-27027 June 2019 Risk Informed Technical Specification Information Only Bases Changes NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI)2019-05-0303 May 2019 Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI) NL-18-1302, License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ...2018-12-19019 December 2018 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidated Line ... ML18312A0772018-10-30030 October 2018 Technical Specifications Bases ML18226A0942018-08-0909 August 2018 Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables ND-18-0647, Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-Containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017)2018-07-20020 July 2018 Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-Containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017) ND-18-0374, Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009)2018-04-13013 April 2018 Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009) NL-17-2095, Supplement Submittal of Corrected Technical Specification Definition of Iodine 1-131 for the Ast. TSTF-448 and TSTF-312 Amendment Package2017-12-18018 December 2017 Supplement Submittal of Corrected Technical Specification Definition of Iodine 1-131 for the Ast. TSTF-448 and TSTF-312 Amendment Package ND-17-1559, Request for License Amendment: Technical Specification Changes to Support Control Rod Testing in Cold Shutdown with Reactor Coolant Pumps Not in Operation (LAR-17-034)2017-09-22022 September 2017 Request for License Amendment: Technical Specification Changes to Support Control Rod Testing in Cold Shutdown with Reactor Coolant Pumps Not in Operation (LAR-17-034) NL-17-0534, Joseph M. Farley Nuclear Plant, Technical Specifications Bases2017-04-20020 April 2017 Joseph M. Farley Nuclear Plant, Technical Specifications Bases ML17117A3742017-04-20020 April 2017 Technical Specifications Bases NL-16-1026, Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2016-11-21021 November 2016 Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements NL-16-2206, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process2016-11-15015 November 2016 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process NL-16-2080, Change (TSTF-427) to Add LCO 3.0.1 0, Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2016-11-15015 November 2016 Change (TSTF-427) to Add LCO 3.0.1 0, Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process 2023-06-13
[Table view] Category:Amendment
MONTHYEARNL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document NL-22-0977, License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing2023-02-0909 February 2023 License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing NL-23-0020, Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality2023-01-12012 January 2023 Emergency License Amendment Request: Technical Specification Limiting Conditions for Operation 3.4.11, 3.4.12, and 3.4.13 Operability Requirements for Automatic Depressurization System Stage 4 Flow Paths Prior to Initial Criticality ND-22-0894, License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005)2022-12-19019 December 2022 License Amendment Request for Technical Specification SR 3.0.3 for Never-Performed Surveillances (LAR-22-005) ML22307A0072022-11-0202 November 2022 Draft LAR for TS 3.8.3 Inverters Operating Completion Time Extension NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0609, Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2022-09-13013 September 2022 Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-21-0925, Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2021-12-22022 December 2021 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-21-1017, License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure2021-12-13013 December 2021 License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure NL-21-0984, Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls2021-11-10010 November 2021 Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls NL-21-0613, Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, .2021-06-30030 June 2021 Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, . NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications2021-06-22022 June 2021 License Amendment Request to Remove Table of Contents from Technical Specifications NL-21-0444, Supplement to License Amendment Request to Revise Technical Specification 3.3.5.2 Allowable Values2021-05-0606 May 2021 Supplement to License Amendment Request to Revise Technical Specification 3.3.5.2 Allowable Values NL-19-1063, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition2019-12-10010 December 2019 Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI)2019-05-0303 May 2019 Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI) ML18226A0942018-08-0909 August 2018 Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables ND-18-0647, Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-Containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017)2018-07-20020 July 2018 Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-Containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017) NL-17-2095, Supplement Submittal of Corrected Technical Specification Definition of Iodine 1-131 for the Ast. TSTF-448 and TSTF-312 Amendment Package2017-12-18018 December 2017 Supplement Submittal of Corrected Technical Specification Definition of Iodine 1-131 for the Ast. TSTF-448 and TSTF-312 Amendment Package NL-16-1026, Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2016-11-21021 November 2016 Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements NL-16-1246, Request to Revise Technical Specifications LCO 3.7.9 for a One-Time Change to Support a Unit 2 Nuclear Service Cooling Water Transfer Pump Refurbishment2016-08-12012 August 2016 Request to Revise Technical Specifications LCO 3.7.9 for a One-Time Change to Support a Unit 2 Nuclear Service Cooling Water Transfer Pump Refurbishment NL-15-0421, J. M. Farley, Units 1 and 2 - License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item Improvement P2015-05-12012 May 2015 J. M. Farley, Units 1 and 2 - License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item Improvement Pro NL-14-1974, Clarification of Response to Request for Additional Information on License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Rev. 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed.2014-12-12012 December 2014 Clarification of Response to Request for Additional Information on License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Rev. 0, Risk Informed Technical Specifications Initiative 4b, Risk-Managed. NL-14-0635, License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation2014-06-0303 June 2014 License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation NL-14-0869, Response to Request for Additional Information Regarding Revision to Technical Specification 3.7.14 Completion Time2014-05-30030 May 2014 Response to Request for Additional Information Regarding Revision to Technical Specification 3.7.14 Completion Time NL-13-1727, Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS)2013-08-0707 August 2013 Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.7.9 Ultimate Heat Sink (UHS) NL-12-1344, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines.2012-09-13013 September 2012 License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines. NL-12-0346, Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2012-02-20020 February 2012 Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST) NL-11-1057, License Amendment Request for Technical Specification Table 3.3.1-12011-09-0909 September 2011 License Amendment Request for Technical Specification Table 3.3.1-1 ML1120709912011-07-26026 July 2011 Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.6. NL-11-1004, Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.2011-07-26026 July 2011 Vogtle, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.6. NL-10-1609, Emergency Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System2010-08-18018 August 2010 Emergency Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System NL-09-1644, Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (SWS)2009-10-0808 October 2009 Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (SWS) NL-09-0154, Request to Revise Technical Specifications to Delete Reactor Trip System, Function 11, Reactor Coolant Pump Breaker Position2009-03-30030 March 2009 Request to Revise Technical Specifications to Delete Reactor Trip System, Function 11, Reactor Coolant Pump Breaker Position NL-08-1519, Response to Request for Information Regarding Revision to Technical Specifications 3.3.1, 3.3.2, 3.3.6, 3.3.7, and 3.3.82008-10-0808 October 2008 Response to Request for Information Regarding Revision to Technical Specifications 3.3.1, 3.3.2, 3.3.6, 3.3.7, and 3.3.8 NL-08-0535, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using Consolidated Line Item Improvement Process2008-10-0808 October 2008 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using Consolidated Line Item Improvement Process ML0818202032008-06-27027 June 2008 Enclosure 2, Markup of Proposed Technical Specifications NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 2, Markup of Proposed Technical Specifications2008-06-27027 June 2008 Vogtle, Units 1 and 2 - Enclosure 2, Markup of Proposed Technical Specifications ML0818202082008-06-27027 June 2008 Enclosure 3, Typed Pages for Technical Specification NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 3, Typed Pages for Technical Specification2008-06-27027 June 2008 Vogtle, Units 1 and 2 - Enclosure 3, Typed Pages for Technical Specification ML0803503492008-02-27027 February 2008 Technical Specifications for License Amendments Regarding Measurement Uncertainty Recapture Power Uprate ML0733801002007-11-30030 November 2007 Transmittal of Vogtle, Units 1 and 2 - License Amendment Request to Technical Specification (TS) Sections TS 5.5.9, Steam Generator (SG) Program and TS 5.6.10, Steam Generator Tube Inspection Report NL-06-0708, Request for License Amendment Related to Technical Specification 5.5.9, Steam Generator (SG) Tube Surveillance Program.2006-07-20020 July 2006 Request for License Amendment Related to Technical Specification 5.5.9, Steam Generator (SG) Tube Surveillance Program. ML0611504462006-04-14014 April 2006 Technical Specifications, Revise TS Section 5.5.6, Pre-Stressed Concrete Containment Tendon Surveillance Program, for Consistency with the Requirements of 10 CFR 50.55a(g)(4) for Components Classified as Code Class CC NL-05-0856, Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2005-11-0202 November 2005 Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML0521303062005-08-0303 August 2005 Enclosure, Corrected Tech Spec Page for Amendment Nos. 137 and 116 NL-05-0740, Submittal of Joseph M. Farley Nuclear Plant, Technical Specifications Revision Spent Fuel Cask Loading Requirements2005-05-17017 May 2005 Submittal of Joseph M. Farley Nuclear Plant, Technical Specifications Revision Spent Fuel Cask Loading Requirements ML0512300672005-04-22022 April 2005 Enclosure, Correction Ltr. on Amendment Nos. 167 & 159 for Elimination of Hydrogen Recombiners and Monitors (Tac No. MC3224, MC3225) 2023-05-05
[Table view] |
Text
Cheryl A. Gayheart 3535 Colonnade Parkway Regulatory Affairs Director Birmingham, AL 35243 205 992 5316 cagayhea@southernco.com December 22, 2021 Docket Nos.: 50-348 50-424 NL-21-0925 50-364 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Southern Nuclear Operating Company Farley Nuclear Plant Units 1&2 Vogtle Electric Generating Plant Units 1&2 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves Ladies and Gentlemen:
Pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) hereby requests a license amendment to the Joseph M. Farley Nuclear Plant (FNP) Unit 1 Renewed Facility Operating License (RFOL) NPF-2 and Unit 2 RFOL NPF-8, and the Vogtle Electric Generating Plant (VEGP) Unit 1 RFOL NPF-68 and Unit 2 RFOL NPF-81. The proposed amendment is consistent with NRC-approved Technical Specification Task Force (TSTF) Traveler 269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves.
The proposed changes modify Technical Specification (TS) 3.6.3, Containment Isolation Valves. Consistent with TSTF-269-A, Notes would be added to allow isolation devices that are locked, sealed or otherwise secured be verified by use of administrative means.
Approval of the proposed amendment is requested within one year of completion of the NRCs acceptance review. Once approved, the amendment shall be implemented within 60 days.
In accordance with 10 CFR 50.91, a copy of this application is being provided to the designated Alabama and Georgia Officials.
This letter contains no regulatory commitments. If you have any questions, please contact Ryan Joyce at 205.992.6468.
861XFOHDU5HJXODWRU\&RPPLVVLRQ
1/
3DJH
,GHFODUHXQGHUSHQDOW\RISHUMXU\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFW([HFXWHGRQWKH
QGGD\RI'HFHPEHU
5HVSHFWIXOO\VXEPLWWHG
&$*D\KHDUW
'LUHFWRU5HJXODWRU\$IIDLUV
6RXWKHUQ1XFOHDU2SHUDWLQJ&RPSDQ\
&$*DJTFEJ
(QFORVXUH (YDOXDWLRQRIWKH3URSRVHG&KDQJHV
$WWDFKPHQWV D )DUOH\3URSRVHG7HFKQLFDO6SHFLILFDWLRQ&KDQJHV 0DUNHGXS3DJHV
E 9RJWOH3URSRVHG7HFKQLFDO6SHFLILFDWLRQ&KDQJHV 0DUNHGXS3DJHV
D )DUOH\5HYLVHG7HFKQLFDO6SHFLILFDWLRQ3DJHV
E 9RJWOH5HYLVHG7HFKQLFDO6SHFLILFDWLRQ3DJHV
D )DUOH\3URSRVHG7HFKQLFDO6SHFLILFDWLRQ%DVHV&KDQJHV 0DUNHGXS
3DJHV IRU,QIRUPDWLRQ2QO\
E 9RJWOH3URSRVHG7HFKQLFDO6SHFLILFDWLRQ%DVHV&KDQJHV 0DUNHGXS
3DJHV IRU,QIRUPDWLRQ2QO\
FF 5HJLRQDO$GPLQLVWUDWRU5HJLRQOO
1553URMHFW0DQDJHU+/-)DUOH\ 9RJWOH
6HQLRU5HVLGHQW,QVSHFWRU+/-)DUOH\ 9RJWOH
'LUHFWRU$ODEDPD2IILFHRI5DGLDWLRQ&RQWURO
6WDWHRI*HRUJLD(QYLURQPHQWDO3URWHFWLRQ'LYLVLRQ
57\SH&*$
ENCLOSURE Farley Nuclear Plant - Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves Evaluation of the Proposed Changes
Enclosure to NL-21-0925 Evaluation of the Proposed Changes 1
SUMMARY
DESCRIPTION Southern Nuclear Operating Company (SNC) hereby requests a license amendment to the Joseph M. Farley Nuclear Plant (FNP) Unit 1 Renewed Facility Operating License (RFOL)
NPF-2 and Unit 2 RFOL NPF-8, and the Vogtle Electric Generating Plant (VEGP) Unit 1 RFOL NPF-68 and Unit 2 RFOL NPF-81. The proposed amendment is consistent with NRC-approved Technical Specification Task Force (TSTF) Traveler 269-A, Revision 2, "Allow Administrative Means of Position Verification for Locked or Sealed Valves (Reference 1).
The proposed changes modify Technical Specification (TS) 3.6.3, Containment Isolation Valves. Consistent with TSTF-269-A, Notes would be added to allow isolation devices that are locked, sealed or otherwise secured be verified by use of administrative means.
2 DETAILED DESCRIPTION 2.1 Description of the Proposed Change The proposed change modifies TS 3.6.3, Containment Isolation Valves. This specification requires penetration flow paths with inoperable isolation devices be isolated and periodically verified to be isolated. Consistent with TSTF-269-A, Revision 2, notes are proposed to be added to FNP TS 3.6.3, Required Actions A.2, C.2 and D.2, and VEGP TS 3.6.3, Required Actions A.2 and C.2, to allow isolation devices that are locked, sealed, or otherwise secured to be verified using administrative means.
SNC is proposing the following variations from the TS changes described in TSTF-269-A. There are two differences in the Required Action identifiers between TSTF-269-A and the FNP TS and the VEGP TS. TSTF-269-A identifies a change to TS 3.6.3 Required Action E.2. The equivalent action in the FNP TS is Required Action D.2. The equivalent Required Action in the VEGP TS is C.2. These Required Actions are equivalent, and the identifier differences do not affect the applicability of TSTF-269-A to FNP or VEGP. In addition, the VEGP TS do not contain a Condition equivalent to Condition C in TSTF-269-A. Therefore, that change is not applicable to VEGP.
3 TECHNICAL EVALUATION 3.1 Summary of the Approved Traveler Justification The purpose of the periodic verification that a penetration with an inoperable isolation valve continues to be isolated is to detect and correct inadvertent repositioning of the isolation device.
However, the function of locking, sealing, or securing an isolation device is to ensure that the device is not inadvertently repositioned. Therefore, it is sufficient to assume that the initial establishment of component status (e.g., isolation valves closed) was performed correctly and subsequent periodic re-verification need only be a verification of the administrative control that ensures that the component remains in the required state. It is unnecessary and undesirable to remove the lock, seal, or other means of securing the component solely to perform an active verification of the required state as it would increase the chance of mispositioning due to the frequent manipulation.
The justification presented in approved Traveler TSTF-269-A is applicable to FNP and VEGP.
The Traveler is being adopted by FNP and VEGP with no changes beyond that described above in Section 2.1.
E-1
Enclosure to NL-21-0925 Evaluation of the Proposed Changes The NRC implemented the approved Traveler, and its contents are reflected in NUREG-1431, Revision 5.
4 REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria The proposed change has been evaluated to determine whether applicable regulations and requirements continue to be met.
The regulations of Title 10 of the Code of Federal Regulations (10 CFR) 50.36, Technical Specifications, establish the requirements related to the content of the Technical Specifications.
Section 50.36(c)(2) states: When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met. There is no regulatory requirement that specifies what remedial actions are to be taken when a limiting condition for operation is not met. The proposed changes remove an operational restriction not needed for safety. The proposed changes are consistent with the Standard Westinghouse Technical Specifications (i.e., NUREG-1431).
4.2 Precedent Precedent for a plant-specific NRC approval of the changes in TSTF-269-A includes:
Brunswick Steam Electric Plant (Reference 2) 4.3 No Significant Hazard Consideration Determination Analysis Southern Nuclear Operating Company (SNC) has evaluated the proposed changes to the Technical Specifications using the criteria in 10 CFR 50.92 and has determined that the proposed changes do not involve a significant hazards consideration.
The proposed amendment is consistent with NRC-approved Technical Specification Task Force (TSTF) Traveler 269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves. The proposed changes modify Farley Nuclear Plant (FNP) and Vogtle Electric Generating Plant (VEGP) Technical Specification (TS) 3.6.3, Containment Isolation Valves by adding Notes to allow isolation devices that are locked, sealed or otherwise secured be verified by use of administrative means.
As required by 10 CFR 50.91(a), the SNC analysis of the issue of no significant hazards consideration is presented below:
- 1) Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change modifies TS 3.6.3, Containment Isolation Valves. This specification requires penetration flow paths with inoperable isolation devices be isolated and periodically verified to be isolated. Consistent with TSTF-269-A, Revision 2, Notes are proposed to be added to FNP TS 3.6.3, Required Actions A.2, C.2 and D.2, and VEGP TS 3.6.3, Required Actions A.2 and C.2, to allow isolation devices that are locked, sealed, or otherwise secured to be verified using administrative means. The proposed change does not affect any plant equipment, test methods, or plant operation, and is not an initiator of any analyzed accident E-2
Enclosure to NL-21-0925 Evaluation of the Proposed Changes sequence. The inoperable containment penetrations will continue to be isolated, and hence perform their isolation function. Operation in accordance with the proposed Technical Specifications will ensure that all analyzed accidents will continue to be mitigated as previously analyzed.
Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2) Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed changes do not involve a physical alteration to the plant (i.e., no new or different type of equipment will be installed) or a change to the methods governing normal plant operation. The changes do not alter the assumptions made in the safety analysis.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3) Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed change will not affect operation of plant equipment or the function of any equipment assumed in the accident analysis. Affected containment penetrations will continue to be isolated as required by the existing Technical Specifications.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
4.4 Conclusion In conclusion, based on the considerations discussed above, SNC concludes: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or the health and safety of the public.
5 ENVIRONMENTAL CONSIDERATION The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR Part 20, and would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change. Accordingly, the E-3
Enclosure to NL-21-0925 Evaluation of the Proposed Changes amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6 REFERENCES
- 1. Technical Specification Task Force (TSTF)-269-A, Rev 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves, approved July 26, 1999.
- 2. Letter from Nuclear Regulatory Commission to Brunswick Steam Electric Plant, "Issuance Of Amendment Nos. 296 And 324 To Adopt Technical Specification Task Force Traveler TSTF-269-A, Revision 2, "Allow Administrative Means Of Position Verification For Locked Or Sealed Valves," dated November 21, 2019
[ML19281A330].
E-4
Southern Nuclear Operating Company Farley Nuclear Plant - Units 1 and 2 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves Attachment 1a Proposed Technical Specification Changes (Marked-up Pages)
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. ------------NOTE------------- A.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Only applicable to penetration flow path by penetration flow paths use of at least one closed OR with two containment and de-activated isolation valves. automatic valve, closed In accordance with
manual valve, blind the Risk Informed flange, or check valve Completion Time One or more penetration with flow through the Program flow paths with one valve secured.
containment isolation valve inoperable except AND for purge valve penetration leakage not A.2 -------------NOTES-----------
within limit. 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment Farley Units 1 and 2 3.6.3-2 Amendment No. 225 (Unit 1)
Amendment No. 222 (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. ------------NOTE------------ C.1 Isolate the affected 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Only applicable to penetration flow path by penetration flow paths use of at least one closed OR with only one and de-activated containment isolation automatic valve, closed In accordance with valve and a closed manual valve, or blind the Risk Informed system. flange. Completion Time
Program AND One or more penetration flow paths with one C.2 -------------NOTES-----------
containment isolation 1. Isolation devices in valve inoperable. high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days penetration flow path is isolated.
Farley Units 1 and 2 3.6.3-4 Amendment No. 225 (Unit 1)
Amendment No. 222 (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. One or more penetration D.1 Isolate the affected 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> flow paths containing penetration flow path by containment purge use of at least one valves, with penetration closed and de-activated leakage such that the automatic valve, closed sum of the leakage for all manual valve, or blind Type B and C tests is not flange.
within limits.
AND D.2 ------------NOTES-----------
- 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment AND (continued)
Farley Units 1 and 2 3.6.3-5 Amendment No. 225 (Unit 1)
Amendment No. 222 (Unit 2)
Southern Nuclear Operating Company Vogtle Electric Generating Plant - Units 1 and 2 Adoption of TSTF-269-A, Revision 2, "Allow Administrative Means of Position Verification for Locked or Sealed Valves Attachment 1b Proposed Technical Specification Changes (Marked-up Pages)
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 -----------NOTES-------------
- 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment (continued)
Vogtle Units 1 and 2 3.6.3-2 Amendment No. 188 (Unit 1)
Amendment No. 171 (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. ----------NOTES----------- C.1 Isolate the affected 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- 1. Not applicable when penetration flow path by the second use of at least one closed OR containment purge and de-activated valve is intentionally automatic valve, closed In accordance with made inoperable. manual valve, or blind the Risk Informed
- 2. The following Section flange. Completion Time 5.5.22 constraints are Program applicable: parts b, AND c.2, c.3, d, e, f, g, and
- h. C.2 -------------NOTES-----------
1. Isolation devices in high radiation areas One or more penetration may be verified by use flow paths with one or of administrative more containment purge means.
valves not within purge 2. Isolation devices that valve leakage limits. are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment (continued)
Vogtle Units 1 and 2 3.6.3-4 Amendment No. 188 (Unit 1)
Amendment No. 171 (Unit 2)
Southern Nuclear Operating Company Farley Nuclear Plant - Units 1 and 2 Adoption of TSTF-269-A, Revision 2, "Allow Administrative Means of Position Verification for Locked or Sealed Valves Attachment 2a Revised Technical Specification Changes
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. ------------NOTE------------- A.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Only applicable to penetration flow path by penetration flow paths use of at least one closed OR with two containment and de-activated isolation valves. automatic valve, closed In accordance with
manual valve, blind the Risk Informed flange, or check valve Completion Time One or more penetration with flow through the Program flow paths with one valve secured.
containment isolation valve inoperable except AND for purge valve penetration leakage not A.2 -------------NOTES-----------
within limit. 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment Farley Units 1 and 2 3.6.3-2 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. ------------NOTE------------ C.1 Isolate the affected 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Only applicable to penetration flow path by penetration flow paths use of at least one closed OR with only one and de-activated containment isolation automatic valve, closed In accordance with valve and a closed manual valve, or blind the Risk Informed system. flange. Completion Time
Program AND One or more penetration flow paths with one C.2 -------------NOTES-----------
containment isolation 1. Isolation devices in valve inoperable. high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days penetration flow path is isolated.
Farley Units 1 and 2 3.6.3-4 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. One or more penetration D.1 Isolate the affected 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> flow paths containing penetration flow path by containment purge use of at least one valves, with penetration closed and de-activated leakage such that the automatic valve, closed sum of the leakage for all manual valve, or blind Type B and C tests is not flange.
within limits.
AND D.2 ------------NOTES-----------
- 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment AND (continued)
Farley Units 1 and 2 3.6.3-5 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. (continued) D.3 Perform SR 3.6.3.5 for Once per 92 days the penetrations containing resilient seal purge valves closed to comply with Required Action D.1.
E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, B, AND C, or D not met.
E.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. One or more penetration F.1 Reduce leakage to within Prior to entering flow paths containing limit. MODE 4 from MODE containment purge 5 if the exiting leakage valves, with penetration is determined during leakage not within the quarterly testing per penetration limits. SR 3.6.3.5.
OR Prior to entering MODE 4 if excess leakage is determined during MODE 5 per SR 3.6.3.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.1 Verify each 48 inch purge valve is sealed closed, In accordance with except for one purge valve in a penetration flow path the Surveillance while in Condition D of this LCO. Frequency Control Program Farley Units 1 and 2 3.6.3-6 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.2 -----------------------------NOTE--------------------------------
Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
Verify each containment isolation manual valve and In accordance with blind flange that is located outside containment and the Surveillance not locked, sealed, or otherwise secured and required Frequency Control to be closed during accident conditions is closed, Program except for containment isolation valves that are open under administrative controls.
SR 3.6.3.3 -----------------------------NOTES-------------------------------
- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
- 2. The blind flange on the fuel transfer canal flange is only required to be verified closed after each draining of the canal.
Verify each containment isolation manual valve and Prior to entering blind flange that is located inside containment and MODE 4 from not locked, sealed, or otherwise secured and MODE 5 if not required to be closed during accident conditions is performed within closed, except for containment isolation valves that the previous are open under administrative controls. 92 days SR 3.6.3.4 Verify the isolation time of each automatic power In accordance with operated containment isolation valve in the the INSERVICE INSERVICE TESTING PROGRAM is within limits. TESTING PROGRAM Farley Units 1 and 2 3.6.3-7 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.5 Perform leakage rate testing for containment In accordance with penetrations containing containment purge valves the Surveillance with resilient seals. Frequency Control Program AND Within 92 days after opening the valve SR 3.6.3.6 Verify each automatic containment isolation valve In accordance with that is not locked, sealed or otherwise secured in the Surveillance position, actuates to the isolation position on an Frequency Control actual or simulated actuation signal. Program Farley Units 1 and 2 3.6.3-8 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Southern Nuclear Operating Company Vogtle Electric Generating Plant - Units 1 and 2 Adoption of TSTF-269-A, Revision 2, "Allow Administrative Means of Position Verification for Locked or Sealed Valves Attachment 2b Revised Technical Specification Changes
Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 -----------NOTES-------------
- 1. Isolation devices in high radiation areas may be verified by use of administrative means.
- 2. Isolation devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment (continued)
Vogtle Units 1 and 2 3.6.3-2 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. ----------NOTES----------- B.1 Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
- 1. Not applicable when penetration flow path by the second use of at least one closed OR containment isolation and de-activated valve is intentionally automatic valve, closed In accordance with made inoperable. manual valve, or blind the Risk Informed
- 2. The following Section flange. Completion Time 5.5.22 constraints are Program applicable: parts b, c.2, c.3, d, e, f, g, and h.
One or more penetration flow paths with two containment isolation valves inoperable except for purge valve leakage not within limit.
(continued)
Vogtle Units 1 and 2 3.6.3-3 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. ----------NOTES----------- C.1 Isolate the affected 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- 1. Not applicable when penetration flow path by the second use of at least one closed OR containment purge and de-activated valve is intentionally automatic valve, closed In accordance with made inoperable. manual valve, or blind the Risk Informed
- 2. The following Section flange. Completion Time 5.5.22 constraints are Program applicable: parts b, AND c.2, c.3, d, e, f, g, and
- h. C.2 -------------NOTES-----------
1. Isolation devices in high radiation areas One or more penetration may be verified by use flow paths with one or of administrative more containment purge means.
valves not within purge 2. Isolation devices that valve leakage limits. are locked, sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected Once per 31 days for penetration flow path is isolation devices isolated. outside containment AND Prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days for isolation devices inside containment (continued)
Vogtle Units 1 and 2 3.6.3-4 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND D.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.1 Verify each 24 inch purge valve is sealed closed, In accordance with except for one purge valve in a penetration flow path the Surveillance while in Condition D of this LCO. Frequency Control Program SR 3.6.3.2 Verify each 14 inch purge valve is closed, except In accordance with when the associated penetration(s) is (are) the Surveillance permitted to be open for purge or venting Frequency Control operations and purge system surveillance and Program maintenance testing under administrative control.
SR 3.6.3.3 -----------------------------NOTE--------------------------------
Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
Verify each containment isolation manual valve In accordance with and blind flange that is located outside the Surveillance containment and not locked, sealed, or otherwise Frequency Control secured and required to be closed during accident Program conditions is closed, except for containment isolation valves that are open under administrative controls.
(continued)
Vogtle Units 1 and 2 3.6.3-5 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.3.4 -----------------------------NOTES-------------------------------
- 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
- 2. The fuel transfer tube blind flange is only required to be verified closed once after refueling prior to entering MODE 4 from MODE 5.
Verify each containment isolation manual valve Prior to entering and blind flange that is located inside containment MODE 4 from and not locked, sealed, or otherwise secured and MODE 5 if not required to be closed during accident conditions is performed within the closed, except for containment isolation valves previous 92 days that are open under administrative controls.
SR 3.6.3.5 Verify the isolation time of each automatic power In accordance operated containment isolation valve is within with the INSERVICE limits. TESTING PROGRAM SR 3.6.3.6 Perform leakage rate testing for containment In accordance with purge valves with resilient seals. the Surveillance Frequency Control Program SR 3.6.3.7 Verify each automatic containment isolation valve In accordance with that is not locked, sealed, or otherwise secured in the Surveillance position, actuates to the isolation position on an Frequency Control actual or simulated actuation signal. Program Vogtle Units 1 and 2 3.6.3-6 Amendment No. (Unit 1)
Amendment No. (Unit 2)
Southern Nuclear Operating Company Farley Nuclear Plant - Units 1 and 2 Adoption of TSTF-269-A, Revision 2, "Allow Administrative Means of Position Verification for Locked or Sealed Valves Attachment 3a Proposed Technical Specification Bases Changes (Marked-up Pages)
For Information Only
Containment Isolation Valves B 3.6.3 BASES ACTIONS A.1 and A.2 (continued)
Required Action A.2 is modified by atwo Notes. Note 1 that applies to isolation devices located in high radiation areas and allows these devices to be verified closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted. Note 2 applies to isolation devices that are locked, sealed, or otherwise secured in position and allows these devices to be verified closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since the function of locking, sealing, or securing components is to ensure that these devices are not inadvertently repositioned. Therefore, the probability of misalignment of these devices, once they have been verified to be in the proper position, is small.
B.1 With two containment isolation valves in one or more penetration flow paths inoperable, the affected penetration flow path must be isolated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The method of isolation must include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic valve, a closed manual valve, and a blind flange. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is consistent with the ACTIONS of LCO 3.6.1. Alternatively, a Completion Time can be determined using the Risk Informed Completion Time Program (Ref. 6). In the event the affected penetration is isolated in accordance with Required Action B.1, the affected penetration must be verified to be isolated on a periodic basis per Required Action A.2, which remains in effect. This periodic verification is necessary to assure leak tightness of containment and that penetrations requiring isolation following an accident are isolated. The Completion Time of once per 31 days for verifying each affected penetration flow path is isolated is appropriate considering the fact that the valves are operated under administrative control and the probability of their misalignment is low.
Condition B is modified by two Notes. The first Note states the Condition is only applicable to penetrations with two containment isolation valves. The second Note states RICT entry is not permitted for this loss of function Condition when the second containment isolation valve is intentionally made inoperable. The RICT program cannot be used for the voluntary removal of systems or components which would result in a loss of safety function. RICT entry is only permitted for situations where a second containment isolation valve is found inoperable or when both isolation valves are simultaneously (continued)
Farley Units 1 and 2 B 3.6.3-7 Revision 96
Containment Isolation Valves B 3.6.3 BASES ACTIONS C.1 and C.2 (continued)
Required Action C.2 is modified by atwo Notes. Note 1 that applies to valves and blind flanges located in high radiation areas and allows these devices to be verified closed by use of administrative means.
Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted. Note 2 applies to isolation devices that are locked, sealed, or otherwise secured in position and allows these devices to be verified closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since the function of locking, sealing, or securing components is to ensure that these devices are not inadvertently repositioned. Therefore, the probability of misalignment of these valves, once they have been verified to be in the proper position, is small.
D.1, D.2, and D.3 In the event one or more penetration flow paths containing containment purge valves, have penetration leakage such that the sum of the leakage for all Type B and C tests is not within limits, purge valve penetration leakage must be restored such that the overall Type B and C testing limit is not exceeded, or the affected penetration flow path must be isolated. The method of isolation must be by the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic valve, closed manual valve, or blind flange. A purge valve with resilient seals utilized to satisfy Required Action D.1 must have been demonstrated to support the penetration meeting the leakage requirements of SR 3.6.3.5. The specified Completion Time is reasonable, considering that one containment purge valve remains closed so that a gross breach of containment does not exist.
In accordance with Required Action D.2, this penetration flow path must be verified to be isolated on a periodic basis. The periodic verification is necessary to ensure that containment penetrations required to be isolated following an accident, which are no longer capable of being automatically isolated, will be in the isolation position should an event occur. This Required Action does not require any testing or valve manipulation. Rather, it involves verification, through a system walkdown, that those isolation devices outside containment capable of being mispositioned are in the correct position. For the isolation devices inside containment, the time period specified as "prior to entering MODE 4 from MODE 5 if not performed within the previous (continued)
Farley Units 1 and 2 B 3.6.3-9 Revision 96
Containment Isolation Valves B 3.6.3 BASES ACTIONS D.1, D.2, and D.3 (continued)
For the containment penetration containing a containment purge valve with resilient seal that is isolated in accordance with Required Action D.1, SR 3.6.3.5 must be performed at least once every 92 days. This assures that degradation of the resilient seal is detected and confirms that the leakage rate of the containment purge valve penetration does not increase during the time the penetration is isolated. Since more reliance is placed on a single valve while in this Condition, it is prudent to perform the SR more often. Therefore, a Frequency of once per 92 days was chosen and has been shown to be acceptable based on operating experience.
Required Action D.2 is modified by two Notes. Note 1 applies to isolation devices located in high radiation areas and allows these devices to be verified closed by use of administrative means.
Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted. Note 2 applies to isolation devices that are locked, sealed, or otherwise secured in position and allows these devices to be verified closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since the function of locking, sealing, or securing components is to ensure that these devices are not inadvertently repositioned.
E.1 and E.2 If the Required Actions and associated Completion Times of Condition A, B, C, or D are not met, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
F.1 In the event one or more penetration flow paths containing containment purge valves have penetration leakage which exceeds the individual purge valve penetration leakage limit, purge valve penetration leakage must be reduced to within the limit prior to the next time that the unit transitions from MODE 5 to MODE 4. Provided that the penetration flow path leakage does not cause the total leakage (continued)
Farley Units 1 and 2 B 3.6.3-10 Revision 52
Southern Nuclear Operating Company Vogtle Electric Generating Plant - Units 1 and 2 Adoption of TSTF-269-A, Revision 2, "Allow Administrative Means of Position Verification for Locked or Sealed Valves Attachment 3b Proposed Technical Specification Bases Changes (Marked-up Pages)
For Information Only
Containment Isolation Valves B 3.6.3 BASES ACTIONS A.1 and A.2 (continued)
Required Action A.2 is modified by atwo Notes. Note 1 that applies to isolation devices located in high radiation areas and allows these valves to be verified closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted. Note 2 applies to isolation devices that are locked, sealed, or otherwise secured in position and allows these devices to be verified closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since the function of locking, sealing, or securing components is to ensure that these devices are not inadvertently repositioned. Therefore, the probability of misalignment, once they have been verified to be in the proper position, is small.
B.1 With two containment isolation valves in one or more penetration flow paths inoperable, the affected penetration flow path must be isolated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The method of isolation must include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic valve, a closed manual valve, and a blind flange. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is consistent with the ACTIONS of LCO 3.6.1. Alternatively, a Completion Time can be determined in accordance with the Risk Informed Completion Time Program. In the event the affected penetration is isolated in accordance with Required Action B.1, the affected penetration must be verified to be isolated on a periodic basis per Required Action A.2, which remains in effect.
This periodic verification is necessary to assure that penetrations requiring isolation following an accident are isolated. The Completion Time of once per 31 days for verifying each affected penetration flow path is isolated is appropriate considering the fact that the valves are operated under administrative control and the probability of their misalignment is low.
CONDITION B is modified by two Notes. The first Note states it is not applicable when the second containment isolation valve is intentionally made inoperable. This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action for two containment isolation valves inoperable is only intended when the second containment isolation valve is found inoperable and the first valve in the line is already (continued)
Vogtle Units 1 and 2 B 3.6.3-7 REVISION 48
Containment Isolation Valves B 3.6.3 BASES ACTIONS B.1 (continued) inoperable, or when both valves are found inoperable at the same time. The second Note indicates the parts of Section 5.5.22, Risk Informed Completion Time Program, which are applicable to this LCO Condition. The Risk Informed Completion Time for this LCO Condition can be no longer than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (Ref. 4).
C.1, C.2, and C.3 In the event one or more containment purge valves in one or more penetration flow paths are not within the purge valve leakage limits, purge valve leakage must be restored to within limits, or the affected penetration flow path must be isolated. The method of isolation must be by the use of at least one isolation barrier that cannot be adversely affected by a single active failure. Isolation barriers that meet this criterion are a closed and de-activated automatic valve, closed manual valve, or blind flange. The specified Completion Time is reasonable, considering that one containment purge valve remains closed so that a gross breach of containment does not exist.
In accordance with Required Action C.2, this penetration flow path must be verified to be isolated on a periodic basis. The periodic verification is necessary to ensure that containment penetrations required to be isolated following an accident, which are no longer capable of being automatically isolated, will be in the isolation position should an event occur. This Required Action does not require any testing or valve manipulation. Rather, it involves verification, through a system walkdown, that those isolation devices outside containment capable of being mispositioned are in the correct position. For the isolation devices inside containment, the time period specified as "prior to entering MODE 4 from MODE 5 if not performed within the previous 92 days" is based on engineering judgment and is considered reasonable in view of the inaccessibility of the isolation devices and other administrative controls that will ensure that isolation device misalignment is an unlikely possibility.
Required Action C.2 is modified by two Notes. Note 1 applies to isolation devices located in high radiation areas and allows these devices to be verified closed by use of administrative means.
Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted. Note 2 (continued)
Vogtle Units 1 and 2 B 3.6.3-8 REVISION 48
Containment Isolation Valves B 3.6.3 BASES ACTIONS C.1, C.2, and C.3 (continued) applies to isolation devices that are locked, sealed, or otherwise secured in position and allows these devices to be verified closed by use of administrative means. Allowing verification by administrative means is considered acceptable, since the function of locking, sealing, or securing components is to ensure that these devices are not inadvertently repositioned.
Condition C is modified by two Notes. The first Note states it is not applicable when the second containment purge valve is intentionally made inoperable. The Required Action for two containment purge valves inoperable is not intended for voluntary removal of redundant systems or components from service. The Required Action is only intended if the second containment purge valve is found inoperable and the first purge valve in the line is already inoperable or if both containment purge valves were found inoperable at the same time.
The second Note indicates the parts of Section 5.5.22, Risk Informed Completion Time Program, which are applicable to this LCO Condition. The Risk Informed Completion Time for this LCO Condition can be no longer than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (Ref. 4).
D.1, and D.2 If the Required Actions and associated Completion Times are not met, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.6.3.1 REQUIREMENTS (HV-2626A, HV-2627A, HV-2628A, HV-2629A)
Each 24 inch containment purge valve is required to be verified sealed closed. This Surveillance is designed to ensure that a gross breach of containment is not caused by an inadvertent or spurious opening of a containment purge valve. Detailed analysis of the purge valves failed to conclusively demonstrate their ability to close during (continued)
Vogtle Units 1 and 2 B 3.6.3-9 REVISION 48