Category:Letter type:NL
MONTHYEARNL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARNL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-22-0799, License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52022-12-20020 December 2022 License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-22-0897, Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A,2022-12-0909 December 2022 Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value NL-21-0989, License Amendment Request to Relocate Augmented Piping Inspection Program Details2021-12-22022 December 2021 License Amendment Request to Relocate Augmented Piping Inspection Program Details NL-21-0925, Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2021-12-22022 December 2021 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-21-1017, License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure2021-12-13013 December 2021 License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure NL-21-0930, Joseph F. Farley Nuclear Plant, Units 1 & 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2021-10-21021 October 2021 Joseph F. Farley Nuclear Plant, Units 1 & 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements NL-21-0658, Joseph Farley, Units 1 and 2, Vogtle, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for for Steam Generator Tube Inspections2021-09-17017 September 2021 Joseph Farley, Units 1 and 2, Vogtle, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for for Steam Generator Tube Inspections NL-21-0613, Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, .2021-06-30030 June 2021 Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, . NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications2021-06-22022 June 2021 License Amendment Request to Remove Table of Contents from Technical Specifications NL-21-0042, Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System2021-06-0909 June 2021 Units 1 and 2, Vogtle Electric Generating Plant - Units 1 and 2, Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System NL-21-0065, License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls2021-03-25025 March 2021 License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls NL-20-0949, License Amendment Request to Revise, Technical Specifications to Adopt TSTF-541, Revision 22020-10-30030 October 2020 License Amendment Request to Revise, Technical Specifications to Adopt TSTF-541, Revision 2 ML20224A4642020-08-11011 August 2020 Southern Nuclear Operating Co, Inc - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML20192A1402020-06-30030 June 2020 Southern Nuclear Operating Co., Inc. - License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions NL-20-0275, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2020-05-29029 May 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues NL-19-0331, License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors2019-12-12012 December 2019 License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors NL-19-0963, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process2019-12-11011 December 2019 Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process NL-19-1063, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition2019-12-10010 December 2019 Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition NL-19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-07-15015 July 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NL-19-0771, Risk Informed Technical Specification Information Only Bases Changes2019-06-27027 June 2019 Risk Informed Technical Specification Information Only Bases Changes NL-18-0668, Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2018-12-14014 December 2018 Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material NL-18-1189, Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations- TSTF-51 and TSTF-4712018-11-29029 November 2018 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations- TSTF-51 and TSTF-471 ML18226A0942018-08-0909 August 2018 Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables NL-18-0039, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ...2018-07-27027 July 2018 License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b, Risk Managed Technical Specifications (Rmts) ... NL-18-0733, Supplement to License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow and Response to Request for Additional Information2018-06-0707 June 2018 Supplement to License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow and Response to Request for Additional Information ML18065A0222018-03-0606 March 2018 March 12, 2018, Public Meeting - Draft 4b Application ML18065A0252018-03-0606 March 2018 Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures NL-17-0190, Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process2017-12-21021 December 2017 Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process NL-17-0611, Units 1 and 2, License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow2017-12-21021 December 2017 Units 1 and 2, License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow NL-17-1088, Submittal of License Amendment Request, Relocation of the Emergency Operations Facility2017-08-30030 August 2017 Submittal of License Amendment Request, Relocation of the Emergency Operations Facility NL-16-2384, Non-Voluntary License Amendment Request to Correct Non-Conservative Technical Specification 3.7.12017-03-22022 March 2017 Non-Voluntary License Amendment Request to Correct Non-Conservative Technical Specification 3.7.1 ML15329A0322017-01-23023 January 2017 Issuance of Amendment Related to Renewed Facility Operating License Condition 2.C.(23) Required Completion Date ML16340A0052016-12-0101 December 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Rev 4, Clarify Use and Application Rules. NL-16-1026, Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2016-11-21021 November 2016 Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements 2024-09-04
[Table view] Category:Technical Specification
MONTHYEARNL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency ML23318A0702023-10-31031 October 2023 Technical Specifications Bases ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-21-0925, Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2021-12-22022 December 2021 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-21-1017, License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure2021-12-13013 December 2021 License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure NL-21-0984, Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls2021-11-10010 November 2021 Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls ML21313A3272021-10-28028 October 2021 0, Technical Specification Bases ML21313A3262021-10-28028 October 2021 0 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications NL-21-0613, Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, .2021-06-30030 June 2021 Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, . NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications2021-06-22022 June 2021 License Amendment Request to Remove Table of Contents from Technical Specifications ML20125A2122020-04-28028 April 2020 Revisions to Technical Specification Bases Changes NL-19-0331, License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors2019-12-12012 December 2019 License Amendment Request: Revise Measurement Units Associated with Reactor Trip System Nuclear Instrument Comparison Surveillance and Trip Setpoint for Control Room Air Intake Radiation Monitors NL-19-1063, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition2019-12-10010 December 2019 Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition NL-19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-07-15015 July 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NL-19-0771, Risk Informed Technical Specification Information Only Bases Changes2019-06-27027 June 2019 Risk Informed Technical Specification Information Only Bases Changes NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI)2019-05-0303 May 2019 Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI) ML18312A0772018-10-30030 October 2018 Technical Specifications Bases ML18226A0942018-08-0909 August 2018 Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables NL-17-2095, Supplement Submittal of Corrected Technical Specification Definition of Iodine 1-131 for the Ast. TSTF-448 and TSTF-312 Amendment Package2017-12-18018 December 2017 Supplement Submittal of Corrected Technical Specification Definition of Iodine 1-131 for the Ast. TSTF-448 and TSTF-312 Amendment Package NL-17-0534, Joseph M. Farley Nuclear Plant, Technical Specifications Bases2017-04-20020 April 2017 Joseph M. Farley Nuclear Plant, Technical Specifications Bases ML17117A3742017-04-20020 April 2017 Technical Specifications Bases NL-16-1026, Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2016-11-21021 November 2016 Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements NL-16-0091, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application.2016-07-28028 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application. NL-15-1761, Response to Request for Additional Information Regarding Adoption of TSTF-432-A, Rev. 1, Change in Technical Specifications End States (WCAP-16294)2015-09-17017 September 2015 Response to Request for Additional Information Regarding Adoption of TSTF-432-A, Rev. 1, Change in Technical Specifications End States (WCAP-16294) NL-15-0421, J. M. Farley, Units 1 and 2 - License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item Improvement P2015-05-12012 May 2015 J. M. Farley, Units 1 and 2 - License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item Improvement Pro NL-14-1531, License Amendment Request for Adoption of TSTF-432-A, Rev. 1, Change in Technical Specifications End States (WCAP-16294), Using the Consolidated Line Item Improvement Process2015-04-13013 April 2015 License Amendment Request for Adoption of TSTF-432-A, Rev. 1, Change in Technical Specifications End States (WCAP-16294), Using the Consolidated Line Item Improvement Process ML14335A6292014-11-24024 November 2014 Basis for Proposed Changes. Part 2 of 2 NL-14-1385, Basis for Proposed Changes. Part 1 of 22014-11-24024 November 2014 Basis for Proposed Changes. Part 1 of 2 NL-14-0635, License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation2014-06-0303 June 2014 License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation NL-13-0081, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement...2013-01-23023 January 2013 Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,Using the Consolidated Line Item Improvement... NL-12-0403, Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2012-02-28028 February 2012 Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST) NL-12-0346, Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2012-02-20020 February 2012 Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST) NL-11-0299, Application to Amend Surveillance Requirement 3.4.11.1 and 3.4.11.42012-01-18018 January 2012 Application to Amend Surveillance Requirement 3.4.11.1 and 3.4.11.4 NL-11-1057, License Amendment Request for Technical Specification Table 3.3.1-12011-09-0909 September 2011 License Amendment Request for Technical Specification Table 3.3.1-1 NL-10-0272, License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated..2010-10-29029 October 2010 License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated.. NL-09-1644, Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (SWS)2009-10-0808 October 2009 Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (SWS) NL-09-0154, Request to Revise Technical Specifications to Delete Reactor Trip System, Function 11, Reactor Coolant Pump Breaker Position2009-03-30030 March 2009 Request to Revise Technical Specifications to Delete Reactor Trip System, Function 11, Reactor Coolant Pump Breaker Position NL-08-0535, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using Consolidated Line Item Improvement Process2008-10-0808 October 2008 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using Consolidated Line Item Improvement Process NL-08-1519, Response to Request for Information Regarding Revision to Technical Specifications 3.3.1, 3.3.2, 3.3.6, 3.3.7, and 3.3.82008-10-0808 October 2008 Response to Request for Information Regarding Revision to Technical Specifications 3.3.1, 3.3.2, 3.3.6, 3.3.7, and 3.3.8 ML0611504462006-04-14014 April 2006 Technical Specifications, Revise TS Section 5.5.6, Pre-Stressed Concrete Containment Tendon Surveillance Program, for Consistency with the Requirements of 10 CFR 50.55a(g)(4) for Components Classified as Code Class CC NL-05-0856, Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2005-11-0202 November 2005 Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process NL-05-0068, Technical Specification Amendment Request to Incorporate Best Estimate LOCA Analysis Using Astrum2005-10-0606 October 2005 Technical Specification Amendment Request to Incorporate Best Estimate LOCA Analysis Using Astrum NL-05-0740, Submittal of Joseph M. Farley Nuclear Plant, Technical Specifications Revision Spent Fuel Cask Loading Requirements2005-05-17017 May 2005 Submittal of Joseph M. Farley Nuclear Plant, Technical Specifications Revision Spent Fuel Cask Loading Requirements ML0512300672005-04-22022 April 2005 Enclosure, Correction Ltr. on Amendment Nos. 167 & 159 for Elimination of Hydrogen Recombiners and Monitors (Tac No. MC3224, MC3225) ML0507303042005-03-0808 March 2005 Enclosure, Amendment 168 & 160, TS Revision on 5.6 Reporting Requirements 2024-08-16
[Table view] Category:Amendment
MONTHYEARNL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-21-0925, Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2021-12-22022 December 2021 Adoption of TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-21-1017, License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure2021-12-13013 December 2021 License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure NL-21-0984, Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls2021-11-10010 November 2021 Southern Nuclear Operating Company - Second Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls NL-21-0613, Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, .2021-06-30030 June 2021 Supplement to License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, . NL-21-0160, License Amendment Request to Remove Table of Contents from Technical Specifications2021-06-22022 June 2021 License Amendment Request to Remove Table of Contents from Technical Specifications NL-19-1063, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition2019-12-10010 December 2019 Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition NL-19-0221, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI)2019-05-0303 May 2019 Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications, SNC Response to NRC Request for Additional Information (RAI) ML18226A0942018-08-0909 August 2018 Edwin I. Hatch, Units 1 and 2; and Vogtle, Units 1 and 2 - License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-shift Staff Tables NL-17-2095, Supplement Submittal of Corrected Technical Specification Definition of Iodine 1-131 for the Ast. TSTF-448 and TSTF-312 Amendment Package2017-12-18018 December 2017 Supplement Submittal of Corrected Technical Specification Definition of Iodine 1-131 for the Ast. TSTF-448 and TSTF-312 Amendment Package NL-16-1026, Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2016-11-21021 November 2016 Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements NL-15-0421, J. M. Farley, Units 1 and 2 - License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item Improvement P2015-05-12012 May 2015 J. M. Farley, Units 1 and 2 - License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item Improvement Pro NL-14-0635, License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation2014-06-0303 June 2014 License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation NL-12-0346, Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2012-02-20020 February 2012 Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST) NL-11-1057, License Amendment Request for Technical Specification Table 3.3.1-12011-09-0909 September 2011 License Amendment Request for Technical Specification Table 3.3.1-1 NL-09-1644, Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (SWS)2009-10-0808 October 2009 Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (SWS) NL-09-0154, Request to Revise Technical Specifications to Delete Reactor Trip System, Function 11, Reactor Coolant Pump Breaker Position2009-03-30030 March 2009 Request to Revise Technical Specifications to Delete Reactor Trip System, Function 11, Reactor Coolant Pump Breaker Position NL-08-0535, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using Consolidated Line Item Improvement Process2008-10-0808 October 2008 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using Consolidated Line Item Improvement Process NL-08-1519, Response to Request for Information Regarding Revision to Technical Specifications 3.3.1, 3.3.2, 3.3.6, 3.3.7, and 3.3.82008-10-0808 October 2008 Response to Request for Information Regarding Revision to Technical Specifications 3.3.1, 3.3.2, 3.3.6, 3.3.7, and 3.3.8 ML0611504462006-04-14014 April 2006 Technical Specifications, Revise TS Section 5.5.6, Pre-Stressed Concrete Containment Tendon Surveillance Program, for Consistency with the Requirements of 10 CFR 50.55a(g)(4) for Components Classified as Code Class CC NL-05-0856, Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2005-11-0202 November 2005 Request to Revise Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process NL-05-0740, Submittal of Joseph M. Farley Nuclear Plant, Technical Specifications Revision Spent Fuel Cask Loading Requirements2005-05-17017 May 2005 Submittal of Joseph M. Farley Nuclear Plant, Technical Specifications Revision Spent Fuel Cask Loading Requirements ML0512300672005-04-22022 April 2005 Enclosure, Correction Ltr. on Amendment Nos. 167 & 159 for Elimination of Hydrogen Recombiners and Monitors (Tac No. MC3224, MC3225) ML0507303042005-03-0808 March 2005 Enclosure, Amendment 168 & 160, TS Revision on 5.6 Reporting Requirements NL-03-2454, Exigent Technical Specification Revision Request Regarding Electrical Power Systems AC Sources - Operating2003-12-0303 December 2003 Exigent Technical Specification Revision Request Regarding Electrical Power Systems AC Sources - Operating NL-03-1914, Request for Technical Specification Changes Regarding DC Sources - Operating2003-09-19019 September 2003 Request for Technical Specification Changes Regarding DC Sources - Operating NL-03-1470, Withdrawal of Request for Technical Specification Changes Deletion of LCO 3.6.1, Condition a and Addition of LCO 3.0.8, Inoperability of Non-Technical Specification Support Systems2003-08-18018 August 2003 Withdrawal of Request for Technical Specification Changes Deletion of LCO 3.6.1, Condition a and Addition of LCO 3.0.8, Inoperability of Non-Technical Specification Support Systems NL-03-0779, Request for Revise TS Control Room Emergency Filtration/Pressurization System & Penetration Room Filtration System - Revision 12003-05-20020 May 2003 Request for Revise TS Control Room Emergency Filtration/Pressurization System & Penetration Room Filtration System - Revision 1 ML0202402792002-01-0404 January 2002 Units 1 & 2, Technical Specifications 2024-05-03
[Table view] |
Text
Charles R. Pierce Southern Nuclear Regulatory Affa1rs Director Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alallarna 35201 Tel 205.992.7872 Fax 205.992.7601 SOUTHERN << \
COMPANY JUN 0 3 2014 Docket Nos.: 50-348 NL-14-0635 50-364 U. S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation Ladies and Gentlemen:
In accordance with the requirements of 10 CFR 50.90, Southern Nuclear Operating Company (SNC) proposes to revise the Joseph M. Farley Nuclear Plant (FNP) Unit 1 and Unit 2 Technical Specifications (TS). The proposed amendment would modify Technical Specification (TS) Limiting Condition for Operation (LCO) 3.3.1 and Surveillance Requirements (SR) 3.2.4.2 in order to avoid confusion as to when a flux map for quadrant power tilt ratio (QPTR) monitoring is required. Appropriate TS Bases changes would be made consistent with the TS changes.
Enclosures 1 through 3 provide the Basis for Proposed Change, Markup of Proposed Technical Specifications and Bases pages, and Clean Type Technical Specifications pages in support of the amendment request.
It has been determined that this amendment application does not involve a significant hazard consideration as determined per 10 CFR 50.92. Pursuant to 10 CFR 51 .22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of this amendment.
SNC requests approval of the proposed license amendments by 5/31/2015. The proposed changes would be implemented within 120 days of issuance of the amendment.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
U.S. Nuclear Regulatory Commission NL-14-0635 Page2 Mr. C. R. Pierce states he is Regulatory Affairs Director of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true. ,.
Respectfully submitted, ~ .:
{!({~
/
C. R. Pierce .:.. ........ **
Regulatory Affairs Director
- gg_=bscrib'1Jbefore me this 3 dayof k 1 2014, ONL.UL£~~
Notary Public My ccmmlssion expires: /0 J"iltw 1 I
CRP/RMJ
Enclosures:
- 1. Basis for Proposed Change
- 2. Markup of Proposed Technical Specifications and Bases Pages
- 3. Clean Typed Technical Specifications Pages cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Ms. C. A. Gayheart, Vice President- Farley Mr. B. L. lvey, Vice President- Regulatory Affairs Mr. D. R. Madison, Vice President - Fleet Operations Mr. B. J. Adams, Vice President- Engineering RTYPE: CFA04.054 U.S. Nuclear Regulatorv Commission Mr. V. M. McCree, Regional Administrator Mr. S. A. Williams, NRR Project Manager- Farley Mr. P. K. Niebaum, Senior Resident Inspector- Farley Mr. J. R. Sowa, Resident Inspector- Farley Alabama Department of Public Health Dr. D. E. Williamson, State Health Officer
Joseph M. Farley Nuclear Plant License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation Enclosure 1 Basis for Proposed Change
Enclosure 1 Basis for Proposed Change Table of Contents
- 1. Summary Description
- 2. Detailed Description
- 3. Technical Evaluation
- 4. Regulatory Evaluation 4.1 Significant Hazards Consideration 4.2 Applicable Regulatory Requirements I Criteria 4.3 Conclusion
- 5. Environmental Considerations
- 6. References to NL-14-0635 Basis for Proposed Change
- 1. Summary Description Southern Nuclear Operating Company (SNC) proposes to revise the Joseph M.
Farley Nuclear Plant (FNP) Unit 1 and Unit 2 Technical Specifications (TS). The proposed amendment would modify Technical Specification (TS) Umiting Condition for Operation (LCO) 3.3.1 and Surveillance Requirements (SR) 3.2.4.2 in order to avoid confusion as to when a flux map for quadrant power tilt ratio (QPTR) monitoring is required. The following is a detailed description of the proposed changes:
- SR 3.2.4.2, "Quadrant Power Tilt Ratio," the Note is revised to be consistent with the changes to LCO 3.3.1. The frequency is revised to be consistent with the intent of the previous Note.
- LCO 3.3.1, "Reactor Trip System (RTS) Instrumentation," a Note is added to refer to LCO 3.2.4 for one Power Range Neutron Flux channel inoperable (Condition D). The existing Note becomes Note 1 and the new Note is Note 2.
- LCO 3.3.1, "Reactor Trip System (RTS) Instrumentation," Required Actions D.1.2, D.2.1 and D.2.2 are deleted. The remaining Required Actions are renumbered accordingly.
Appropriate TS Bases changes would be made consistent with the TS changes.
- 2. Background Amendment No. 180/173 approved the incorporation of WCAP-14333. In this application, LCO 3.3. 1, Condition D was revised to allow 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to place a channel in trip as opposed to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, but the requirement to perform SR 3.2.4.2 in Required Action D.2.2 remained once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. As a result, there is a potential for confusion with the layout of the current TS 3.3.1, Condition D. TS LCO 3.3.1, Condition D could incorrectly lead an operator to believe that he could pursue the option of Required Actions D.1.1 and D.1.2, potentially overlooking the requirement to do a flux map for QPTR within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. In addition, Required Actions with shorter Completion Times (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) should appear before Required Actions with longer Completion Times (72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) in the D.2.1 and 0.2.2 option.
Deleting Required Action D.1.2, D.2.1 and D.2.2 from LCO 3.3.1, Condition D eliminates requirements that are duplicative to LCO 3.2.4, thereby eliminating the potential for confusion. Finally, SR 3.2.4.2 is revised to be consistent with the proposed changes to LCO 3.3.1, Condition D.
- 3. Technical Evaluation Amendment No. 180/173 approved relaxation of allowed bypass test times and Completion Times for Umiting Conditions for Operation (LCO) 3.3.1, "Reactor Trip System (RTS) Instrumentation." These relaxations are those that were generically approved in WCAP-14333-P-A, Revision 1, "Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times." The amendment allowed completion Times of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for inoperable analog instruments, and bypass times of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of analog channels.
E1-2 to NL-14-0635 Basis for Proposed Change Condition 0 applies to the Power Range Neutron Flux channel. If one channel is inoperable, then the channel must be placed in trip within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as stated in Required Action 0.1.1. In addition to placing the inoperable channel in the tripped condition, the Required Action in 0.1.2 requires the thermal power reduced to s 75% RTP within 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br />. An alternate to 0.1.1 and 0.1.2 is to place the inoperable channel in the tripped condition and perform SR 3.2.4.2 once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Alternatively, LCO 3.2.4, SR 3.2.4.2 requires a flux map to be performed whenever input from one or more Power Range Neutron Flux channels is inoperable with power > 75% RTP. This flux map must currently be performed once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter. The requirement for every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter is listed in the Surveillance Frequency Control Program. The existing layout of LCO 3.3.1, Condition 0 could incorrectly lead an operator to believe that they could pursue just the option of 0.1.1 and 0.1.2, potentially overlooking the requirement to do a flux map for QPTR within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The proposed amendment would revise TS 3.3.1 Condition 0 to avoid confusion as to when a flux map for QPTR is required.
Per this amendment request, LCO 3.3.1 Required Actions 0.1.2, 0.2.1 and 0.2.2 are deleted. The LCO 3.3.1 Condition 0 Note is modified to direct the operator to refer to LCO 3.2.4 for an inoperable power range channel. The requirement to perform SR 3.2.4.2 is defined in LCO 3.2.4. The Note to existing SR 3.2.4.2 is revised to state that SR 3.2.4.2 is only required when the Power Range Neutron Flux input to QPTR is inoperable. If the otherwise inoperable power range channel remains capable of providing a valid input to QPTR, there is no need to perform SR 3.2.4.2. This is consistent with the existing requirements of LCO 3.3.1, Condition 0 that are proposed for deletion. This proposed change will help eliminate potential confusion regarding the completion time to perform SR 3.2.4.2.
- 4. Regulatory Evaluation 4.1 Significant Hazards Consideration Southern Nuclear Operating Company (SNC) proposes to revise the Joseph M. Farley Nuclear Plant (FNP) Unit 1 and Unit 2 Technical Specifications (TS). The proposed amendment would modify Technical Specification (TS) Limiting Condition for Operation (LCO) 3.3.1 and Surveillance Requirements (SR) 3.2.4.2. The proposed amendment will better align the requirement to perform a flux map once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with LCO 3.2.4. The following is a detailed description of the proposed changes.
- LCO 3.3.1, "RTS Instrumentation," a Note is added to refer to LCO 3.2.4 for an Inoperable Power Range Channel. The existing Note becomes Note 1 and the new Note is Note 2.
- LCO 3.3.1, "RTS Instrumentation," Required Actions 0.1.2, 0.2.1 and 0.2.2 are deleted. The remaining Required Actions are renumbered accordingly.
E1-3 to NL-14-0635 Basis for Proposed Change
- SA 3.2.4.2, "QPTR," the Note is revised to be consistent with the changes to LCO 3.3.1.
As required by 10 CFR 50.91 {a), SNC has evaluated the proposed changes to the FNP TS using the criteria in 10 CFR 50.92 and has determined that the proposed changes do not involve a significant hazards consideration. An analysis of the issue of no significant hazards consideration is presented below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed changes do not adversely affect accident initiators or precursors nor alter the design assumptions, conditions, or configuration of the facility or the manner in which the plant is operated and maintained. The proposed changes do not alter or prevent the ability of structures, systems, and components {SSCs) from performing their intended function to mitigate the consequences of an initiating event within the assumed acceptance limits. The proposed changes do not affect the source term, containment isolation, or radiological release assumptions used in evaluating the radiological consequences of an accident previously evaluated. Further, the proposed changes do not increase the types or amounts of radioactive effluent that may be released offsite, nor significantly increase individual or cumulative occupational/public radiation exposures. The proposed changes are consistent with safety analysis assumptions and resultant consequences.
Therefore, the proposed changes do not increase the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed changes do not result in a change in the manner in which the ATS and ESFAS provide plant protection. The RTS and ESFAS will continue to have the same setpoints after the proposed changes are implemented. There are no design changes associated with the license amendment.
The changes do not involve a physical alteration of the plant (i.e.,
no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. In addition, the changes do not impose any new or different requirements or eHminate any existing requirements. The changes do not alter E1-4 to NL-14-0635 Basis for Proposed Change assumptions made in the safety analysis. The proposed changes are consistent with the safety analysis assumptions and current plant operating practice.
Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Do the proposed changes involve a significant reduction in a margin of safety?
Response: No The proposed changes do not alter the manner in which safety limits, limiting safety system settings or limiting conditions for operation are determined. The safety analysis acceptance criteria are not impacted by these changes. Redundant RTS and ESFAS trains are maintained, and diversity with regard to the signals that provide reactor trip and engineered safety features actuation is also maintained. All signals credited as primary or secondary, and all operator actions credited in the accident analyses will remain the same. The proposed changes will not result in plant operation in a configuration outside the design basis.
Therefore, the proposed changes do not involve a significant reduction in the margin of safety.
Based upon the above analysis, SNC concludes that the proposed amendment does not involve a significant hazards consideration, under the standards set forth in 10 CFR 50.92(c), "Issuance of Amendment,"
and accordingly, a finding of "no significant hazards consideration" is justified.
4.2 Applicable Regulatory Requirements I Criteria The regulatory bases and guidance documents associated with the system discussed in this amendment applications included:
GDC-2 requires that structures, systems, and components important to safety be designed to withstand the effects of natural phenomena such as earthquakes, tornadoes, hurricanes, floods, tsunami, and seiches without the loss of the capability to perform their safety functions.
GDC-13 requires that instrumentation shall be provided to monitor variables and systems over their anticipated ranges for normal operation, for anticipated operational occurrences, and for accident conditions as appropriate to assure adequate safety, including those variables and systems that can affect the fission process, the integrity of the reactor core, the reactor coolant pressure boundary, and the containment and its associated systems.
E1-5 to NL-14-0635 Basis for Proposed Change GDC-20 requires that the protection system(s) shall be designed (1) to initiate automatically the operation of appropriate systems including the reactivity control systems, to assure that specified acceptable fuel design limits are not exceeded as a result of anticipated operational occurrences and (2) to sense accident conditions and to initiate the operation of systems and components important to safety.
GDC-21 requires that the protection system(s) shall be designed for high functional reliability and testability.
GDC-22 through GDC-25 and GDC-29 require various design attributes for the protection system(s), including independence, safe failure modes, separation from control systems, requirements for reactivity control malfunctions, and protection against anticipated operational occurrences.
Regulatory Guide 1.22 discusses an acceptable method of satisfying GDC-20 and GDC-21 regarding the periodic testing of protection system actuation functions. These periodic tests should duplicate, as closely as practicable, the performance that is required of the actuation devices in the event of an accident.
10 CFR 50.55a(h) requires that the protection systems meet IEEE 279-1971. Section 4.2 of IEEE 279-1971 discusses the general functional requirement for protection systems to assure they satisfy the single failure criterion.
There will be no changes to the RTS instrumentation design such that compliance with any of the regulatory requirements and guidance documents above would come into question. The above evaluations confirm that the plant will continue to comply with all applicable regulatory requirements.
4.3 Precedent The NRC approved a similar TS change for the Vogtle Electric Generating Plant by letter dated August 15, 2006 (Package No. ML061880216).
4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
- 5. Environmental Considerations SNC has evaluated the proposed change and determine that the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or a significant increase in the amounts of any E1-6 to NL-14-0635 Basis for Proposed Change effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
E1-7
Joseph M. Farley Nuclear Plant License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation Enclosure 2 Markup of Proposed Technical Specifications and Bases Pages
QPTR 3.2.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.4.1 - ---NOTES----- --
- 1. With input from one Power Range Neutron Flux channel inoperable and THERMAL POWER s 75% RTP, the remaining three power range channels can be used for calculating QPTR.
- 2. SR 3.2.4.2 may be performed in lieu of this Surveillance.
Verify QPTR is within limit by calculation. In accordance with the Surveillance Frequency Control Program SR 3.2.4.2 ----------------NOTE------------------------
>~~"'1 75.~ R+P.
f-7 Confirm that the normalized symmetric power In accordance with distribution is consistent with QPTR. the Surveillance Frequency Control Program Only required to be performed if input to QPTR from Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> one or more Power Range Neutron Flux channels is inoperable with THERMAL POWER > 75% RTP. AND Farley Units 1 and 2 3.2.4-4 Amendment No. 1"85' (Unit 1)
Amendment No. +Bt1 (Unit 2)
RTS Instrumentation 3.3.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. One channel or train C.1 Restore channel or train 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable. to OPERABLE status.
C.2 Open RTBs. S 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br />
~~,~-------------e~----~---------------
D. One Power Range Neutrohl*J-----------------NOTEg::'_________
Flux channel inoperable. ~The inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing and setpoint
~o:r=~~~o pLo~~r3~:~~!or an ~~~~~~~~e~~~~~~he~~~~~~e~~~---
channel.
D.1(B Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
£M.4 ReE:Il:lse THERMAL 78 t:lol:lrs POWER to 6 75% RTP.
~ Plase st:lannel in trip. 72 I=IOl:IFS (continued)
Farley Units 1 and 2 3.3.1-2 Amendment No. 480 (Unit 1)
Amendment No. 4+3 (Unit 2)
RTS Instrumentation 3.3.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. (continued) ~ NG+e 0Riy FeEJI:Iire£1 te l:le
~eFfeFme£1 wl:leR tl:le PeweF RaR~e Ne~:~tFeR Fl1:1x iR~I:It te QP+R is iRe~eFal:lle.
o:r:
PeFfeFm SR 3.2:.4.2:. GRse ~eF ~2: l:lei:IFS D Be 1n MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> E. One channel inoperable. --------NOTE--------------
The inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels.
E.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR E.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> F. THERMAL POWER > P-6 F.1 Reduce THERMAL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and< P-10, one POWER to < P-6.
Intermediate Range Neutron Flux channel OR inoperable.
F.2 Increase THERMAL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> POWER to> P-10.
Farley Units 1 and 2 3.3.1-3 Amendment No. 400 (Unit 1)
Amendment No. 4+3 (Unit 2)
QPTR B 3.2.4 BASES ACTIONS A.6 (continued) surveillances performed at operating power levels, which can only be accomplished after the excore detectors are normalized to restore QPTR to within limits and the core returned to power.
If Required Actions A.1 through A.6 are not completed within their associated Completion Times, the unit must be brought to a MODE or condition in which the requirements do not apply. To achieve this status, THERMAL POWER must be reduced to < 50% RTP within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable, based on operating experience regarding the amount of time required to reach the reduced power level without challenging plant systems.
SURVEILLANCE SR 3.2.4.1 REQUIREMENTS SR 3.2.4.1 is modified by two Notes. Note 1 allows QPTR to be calculated with three power range channels if THERMAL POWER is s 75% RTP and the input from one Power Range Neutron Flux channel is inoperable. Note 2 allows performance of SR 3.2.4.2 in lieu of SR 3.2.4.1.
This Surveillance verifies that the QPTR, as indicated by the Nuclear Instrumentation System (NIS) excore channels, is within its limits.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. For those causes of QPT that occur quickly (e.g., a dropped rod), there typically are other indications of
=------:-:-:-----=--~:-----,--.,..., abnormality that prompt a verification of core power tilt.
the surveillance is only required t----------------------,
to be performed if input to SR 3.2.4.2 /
QPTR from one or more Power .~ **
Range Neutron Flux channels is This Surveillance is modified by a Note, which states that it is not inoperable with Fequirea until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after the input from one or more Power Range L...-------------' Neutron f'lux sl:lannels are inoperable ana tl:le THERMAL POWER-is
>75% RTP.
(continued)
Farley Units 1 and 2 B 3.2.4-6 Revision-5%-
RTS Instrumentation B 3.3.1 BASES ACTIONS C.1 and C.2 (continued) within the allowed 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Completion Time, the unit must be placed in a MODE in which the requirement does not apply. To achieve this status, the RTBs must be opened within the next hour. The additional hour provides sufficient time to accomplish the action in an orderly manner. With the RTBs open, these Functions are no longer required.
The Completion Time is reasonable considering that in this Condition, the remaining OPERABLE train is adequate to perform the safety function, and given the low probability of an event occurring during this interval.
o.1(1. 0.1.2. 0.2.1. 0.2.2:jand o.m~~
Condition D applies to the Power Range Neutron Flux - High and Power Range Neutron Flux- High Positive Rate Functions.
The NIS has a two-out-of-four trip logic. A known inoperable channel must be placed in the tripped condition. This results in a partial trip condition requiring only one-out-of-three logic for actuation. The 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed to place the inoperable channel in the tripped
~condition is justified in WCAP-14333-P-A (Ref. 11 ).
lA aEIEiitiaA te plasiAg tRe iAapeFat!le 6R8AAel iA tRe tFippeEI OOREiitiaR,
- r:'-!5PPt.IIAI .... ~, *:;~- ._.;*"" __ ..,..,.,.. u. ~ 75% R+P witt:aiA 78 Rai:JFS.
ReEii:JeiRg U:ae pawer le1Jel pFe¥eRts eperatiaR a~ tRe saFe witR FaEiial pewer Eiistrit!I:JtiaRs t!eyaREI tRe EiesigR limits. With aRe eUhe NIS pa1.YeF FaRge Eleteetars iRapeFa91e, 1.'4 a~ the FaEiial pawer Eiistri91:JtiaA maAiteriAg eapa9ility is last.
As aA alterRatiYe te the a9aYe astiaAs, the iRapeFa91e ehaAAel eaR 9e plaeeEi iR the tripped saAEiitieR 'NithiA 7~ Rai:JFS aAEi the QP+R FAaAitaFeel eAse e'Jel11 1~ hai:Jrs as per SR 3.~.4.~. QP+R YerifieatiaA. Galsl::llatiRg QP+R eYe!11 1~ hal::lrs eampeRsates fer the last maAitariRg sapa9ilily EII:Je ta the iAapeFal:lle NIS pe~~~er raAge st:laAAel aREI allaws eaAtiAI:Jeel I:JAit epeFatiaA at pawer le¥els ~ 75% R+P. +he 1~ Rai:Jr PFeEti:JeAsy is saAsisteAt witR LGO 3.~.4. "QUADRANT POWER TIL+ Rl\+10 (QPTR)."
(continued)
Farley Units 1 and 2 B 3.3.1-38 Revision 4i
Insert A The Required Actions have been modified by two Notes. Note 1 allows a channel to be placed in the bypassed condition for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> while performing routine surveillance testing. With one channel inoperable, the Note also allows routine surveillance testing of another channel with a channel in bypass. The Note also allows placing a channel in the bypass condition to allow setpoint adjustments when required to reduce the Power Range Neutron Flux-High setpoint in accordance with other Technical Specifications. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> time limit is justified in Reference 11.
Note 2 refers the user to LCO 3.2.4 for additional requirements that may apply for an inoperable power range channel.
RTS Instrumentation B 3.3.1 beyond the BASES Completion J/,. 2t--------1Time for ACTIONS 0.1(1. 0.1.2. 0.2.1. 0.2.2J and D.(t (continued) 1 Required Action 0.1 As an alternative to the above Actionr;1, the plant must be placed 1n a MODE where this Function is no longer required OPERABLE. Seventy-eight (78) hours are allowed to place the plant in MODE 3. The 78 ho.J.l[.
Completion Time includes ., "'"'""~ * * .J
!ami an additional 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for the MODE reduction IRea~:~irea /\otioe D.3. This is a reasonable time, based on operating experience, to reach MODE 3 from full power in an orderly manner and without challenging plant systems. I If Rea1:1ireEI Aolioes oaReot Be I loomplelea wilhiA their allo~o*Jea Completioe Times, bCO 3.0.3 m1:1st liiel jeAteroc:l.l
+l=le Reetl:liFeEI AoliOAS l:la1.te BOOR moEiifieEI BY a Note ll=lal allows plaoieo tl=le ieoperaBie ol:laeeel iA tl:le Bypass ooeEiitioe fer 1:1p to ~ 2 l=le1:1rs '*\tl=lile perfermieo ro1::1tiee SI::IF¥eillaeoe testieo of oll=ler el=laeeels. +l=le Note also allows plaoieg tl=le ieoperaBie ol=laeeel iA tl:le Bypass eoeEiilioe to allow selpoiet aEij1::1stmeets of other ohaeeels whee reer~:~ireEI to reE11::1se the setpoiet ie aooorEiaese with other +esheieal Speoifieatioes. =l=l=le ~2 ROI::IF limo limit is jYstifieel ie Refereeee ~ ~ .
ReEJI::IireEI.A.etioe 9.2.2 has Beee moEiifieEI BY a Note whish oely reEJI::Iires SR 3.2.4 .2 to Be perfermeEI if the Po1.Yer Raege Nel::llFOA ~II::IM iApYt to QP+R Beoomes ieoperaBie. FaiiYre of a oompoeeet ie tl=le Power Raeoe Ne1::1troe FIYM Ghaeeel whish reeEiers tl:le +rip ~l::leetioe ieoperaBio may eot affeot the eapaBility to moeiler QP+R. ,A,s SI:IGR, Eletermieieg QP+R 1:1sieo tl=le movaBle ieoore Eleteotors ease per ~ 2 he1:1rs may eat Be eeeessa~;t.
E.1 and E.2 Condition E applies to the following reactor trip Functions:
- Power Range Neutron Flux - low;
- Pressurizer Pressure - High; and
- SG Water level - low low (continued)
Farley Units 1 and 2 B 3.3.1-39 Revision 46
Joseph M. Farley Nuclear Plant License Amendment Request to Revise Technical Specifications Reactor Trip System Instrumentation Enclosure3 Clean Typed Technical Specifications Pages
QPTR 3.2.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.4.1 ----------------------------NOTES-----------------------------
- 1. With input from one Power Range Neutron Flux channel inoperable and THERMAL POWER
~ 75% RTP, the remaining three power range channels can be used for calculating QPTR.
- 2. SR 3.2.4.2 may be performed in lieu of this Surveillance.
Verify QPTR is within limit by calculation. In accordance with the Surveillance Frequency Control Program SR 3.2.4.2 *---------NOTE---- ----
Only required to be performed if input to QPTR from one or more Power Range Neutron Flux channels is inoperable with THERMAL POWER > 75% RTP.
Confirm that the normalized symmetric power Once within 12 distribution is consistent with QPTR. hours AND In accordance with the Surveillance Frequency Control Program Farley Units 1 and 2 3.2.4-4 Amendment No. (Unit 1)
Amendment No. (Unit 2)
RTS Instrumentation 3.3.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. One channel or train C.1 Restore channel or train 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable. to OPERABLE status.
OR C.2 Open RTBs. 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> D. One Power Range Neutron -----------------NOTES---------------
Flux channel inoperable. 1. The inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing and setpoint adjustment of other channels.
- 2. Refer to LCO 3.2.4 for an inoperable power range channel.
D.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (continued)
Farley Units 1 and 2 3.3.1-2 Amendment No. (Unit 1)
Amendment No. (Unit 2)
RTS Instrumentation 3.3.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. (continued) OR D.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> E. One channel inoperable. ------------NOTE---------------
The inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels.
E.1 Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OR E.2 Be in MODE 3. 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> F. THERMAL POWER > P-6 F.1 Reduce THERMAL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and< P-10, one POWER to < P-6.
Intermediate Range Neutron Flux channel OR inoperable.
F.2 Increase THERMAL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> POWER to> P-10.
Farley Units 1 and 2 3.3.1-3 Amendment No. (Unit 1)
Amendment No. (Unit 2)