Vogtle, Units 1 and 2 - Enclosure 3, Typed Pages for Technical Specification
ML081820208
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/27/2008
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML081820193 List:
References
NL-08-0869
Download: ML081820208 (7)


Text

Vogtle Electric Generating Plant Units 1 and License Amendment Request to Revise Technical Specification Sections 5.5.9, "Steam Generator (SG) Program" and TS "Steam Generator Tube Inspection Report" for Interim Alternate Repair Enclosure Typed Pages for Technical 5.5.9 Programs and Manuals 5.5 5.5 Programs and Manuals Steam Generator (SG) Program (continued) Accident induced leakage performance criterion:

The primary to secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG. Leakage is not to exceed 1 gpm per SG. The operational LEAKAGE performance criterion is specified in LCO 3.4.13, "RCS Operational LEAKAGE." Provisions for SG tube repair criteria.

Tubes found by in service inspection to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged. The following alternate tube repair criteria shall be applied as an alternative to the 40% depth based criteria: For Unit 2 during Refueling Outage 11 and the subsequent operating cycle, degradation found in the portion of the tube below 17 inches from the top of the hot leg tubesheet does not require plugging.

For Unit 2 during Refueling Outage 11 and the subsequent operating cycle, degradation identified in the portion of the tube from the top of the hot leg tubesheet to 17 inches below the top of the tubesheet shall be plugged upon detection. For Unit 1 during Refueling Outage 13 and the subsequent operating cycle, and for Unit 2 during Refueling Outage 12 and the subsequent operating cycle, degradation identified in the portion of the tube below 17 inches from the top of the hot leg tubesheet does not require plugging.

For Unit 1 during Refueling Outage 13 and the subsequent operating cycle, and for Unit 2 during Refueling Outage 12 and the subsequent operating cycle, degradation identified in the portion of the tube from the top of the hot leg tubesheet to 17 inches below the top of the hot leg tubesheet shall be plugged upon detection. For Unit 1 during Refueling Outage 14 and the subsequent operating cycle and for Unit 2 during Refueling Outage 13 and the subsequent operating cycle, tubes with flaws having a circumferential component less than or equal to 203 degrees found in the portion of the tube below 17 inches from the top of the tubesheet and above 1 inch from the (continued)

Vogtle Units 1 and 2 Amendment No. (Unit 1) Amendment No. (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Program (continued) bottom of the tubesheet do not require plugging.

Tubes with flaws having a circumferential component greater than 203 degrees found in the portion of the tube below 17 inches from the top of the tubesheet and above 1 inch from the bottom of the tubesheet shall be removed from service. Tubes with service-induced flaws located within the region from the top of the tubesheet to 17 inches below the top of the tubesheet shall be removed from service. Tubes with service-induced axial cracks found in the portion of the tube below 17 inches from the top of the tubesheet do not require plugging.

When more than one flaw with circumferential components is found in the portion of the tUbe below 17 inches from the top of the tubesheet and above 1 inch from the bottom of the tubesheet with the total of the circumferential components greater than 203 degrees and an axial separation distance of less than 1 inch, then the tube shall be removed from service. When the circumferential components of each of the flaws are added, it is acceptable to count the overlapped portions only once in the total of circumferential components. When one or more flaws with circumferential components are found in the portion of the tube within 1 inch from the bottom of the tubesheet, and the total of the circumferential components found in the tube exceeds 94 degrees, then the tube shall be removed from service. When one or more flaws with circumferential components are found in the portion of the tube within 1 inch from the bottom of the tubesheet, and within 1 inch axial separation distance of a flaw above 1 inch from the bottom of the tubesheet, and the total of the circumferential components found in the tube exceeds 94 degrees, then the tube shall be removed from service. When the circumferential components of each of the flaws are added, it is acceptable to count the overlapped portions only once in the total of circumferential components. Provisions for SG tube inspections.

Periodic SG tube inspections shall be performed.

The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria.

For Unit 2 during Refueling Outage 11 and the subsequent operating cycle, the portion of the tube (continued)

Vogtle Units 1 and 5.5-9 Amendment No. (Unit 1) I Amendment No. (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Program (continued) below 17 inches from the top of the hot leg tubesheet is For Unit 1 during Refueling Outage 13 and the sUbsequent operating cycle, and for Unit 2 during Refueling Outage 12 and the subsequent operating cycle, the portion of the tube below 17 inches from the top of the hot leg tubesheet is excluded.

The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of d.1, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection.

An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations. Inspect 100% of the tUbes in each SG during the first refueling outage following SG replacement. Inspect 100% of the tubes at sequential periods of 120, 90, and, thereafter, 60 effective full power months. The first sequential period shall be considered to begin after the first inservice inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50% by the refueling outage nearest the end of the period. No SG shall operate for more than 48 effective full power months or two refueling outages (whichever is less) without being inspected. If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic nondestructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack. e. Provisions for monitoring operational primary to secondary LEAKAGE. 5.5.10 Secondary Water Chemistry Program This program provides controls for monitoring secondary water chemistry to inhibit SG tube degradation.

The program shall include: (continued)

Vogtle Units 1 and 2 Amendment No. (Unit 1) Amendment No. (Unit 2)

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.10 Secondary Water Chemistry Program (continued) Identification of a sampling schedule for the critical variables and control points for these variables; Identification of the procedures used to measure the values of the critical variables; Identification of process sampling points; Procedures for the recording and management of data; Procedures defining corrective actions for all off control point chemistry conditions; and A procedure identifying the authority responsible for the interpretation of the data and the sequence and timing of administrative events, which is required to initiate corrective action. 5.5.11 Ventilation Filter Testing Program (VFTP) A program shall be established to implement the following required testing of Engineered Safety Feature (ESF) filter ventilation systems at the frequencies specified in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980: Demonstrate for each of the ESF systems that an inplace test of the high efficiency particulate air (HEPA) filters shows a penetration and system bypass S 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980 at the system flow rate specified below +/- 10%. ESF Ventilation Flow Rate Control Room Emergency Filtration System (CREFS) 19,000 CFM Piping Penetration Area Filtration and Exhaust (PPAFES) 15,500 CFM Demonstrate for each of the ESF systems that an inplace test of the charcoal adsorber shows a penetration and system bypass :S 0.05% when tested in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980 at the system flow rate specified below +/- 10%. (continued)

Vogtle Units 1 and 5.5-11 Amendment No. (Unit 1) Amendment No. (Unit 2)

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.9 Deleted. 5.6.10 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.9, Steam Generator (SG) Program. The report shall include: a. The scope of inspections performed on each SG, b. Active degradation mechanisms found, c. Nondestructive examination techniques utilized for each degradation mechanism, d. Location, orientation (if linear), and measured sizes (if available) of service induced indications, Number of tubes plugged during the inspection outage for each active degradation mechanism, Total number and percentage of tubes plugged to date, The results of condition monitoring, including the results of tube pulls and in-situ testing, Following completion of a Unit 1 inspection performed in Refueling Outage 14 (and any inspections performed in the subsequent operating cycle) and following completion of a Unit 2 inspection performed in Refueling Outage 13 (and any inspections performed in the subsequent operating cycle), the number of indications and location, size, orientation, whether initiated on primary or secondary side for each service-induced flaw within the thickness of the tubesheet, and the total of the circumferential components and any circumferential overlap below 17 inches from the top of the tubesheet as determined in accordance with TS 5.5.9.c.3; Following completion of a Unit 1 inspection performed in Refueling Outage 14 (and any inspections performed in the subsequent operating cycle) and following completion of a Unit 2 inspection performed in Refueling Outage 13 (and any inspections performed in the subsequent operating cycle), the primary to secondary LEAKAGE rate observed in each SG (if it is not practical to assign leakage to an individual SG, the entire primary to secondary LEAKAGE should be conservatively assumed to be from one SG) during the cycle preceding the inspection which is the subject of the report; and Following completion of a Unit 1 inspection performed in Refueling Outage 14 (and any inspections performed in the subsequent operating cycle) and follOWing completion of a (continued)

Vogtle Units 1 and 2 Amendment No. (Unit 1) Amendment No. (Unit 2) 5.6 Reporting Requirements 5.6 Reporting Requirements 5.6.10 Steam Generator Tube Inspection Report (continued)

Unit 2 inspection performed in Refueling Outage 13 (and any inspections performed in the subsequent operating cycle), the calculated accident leakage rate from the portion of the tube below 17 inches from the top of the tubesheet for the most limiting accident in the most limiting SG. Vogtle Units 1 and 2 5.6-7 Amendment No. (Unit 1) Amendment No. (Unit 2)