MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-018, Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)2023-03-30030 March 2023 Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540) CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)2023-03-29029 March 2023 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524) CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-055, Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543)2022-09-29029 September 2022 Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543) CNL-22-083, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535).2022-09-13013 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535). CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-057, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use2022-05-27027 May 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel Use CNL-22-056, Supplement to License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)2022-04-28028 April 2022 Supplement to License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534) CNL-21-009, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative2022-03-31031 March 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative CNL-21-002, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance.2021-12-0303 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance. CNL-21-090, Application to Adopt TSTF-568-A, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2, Revision 2 (BFN TS-539)2021-11-19019 November 2021 Application to Adopt TSTF-568-A, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2, Revision 2 (BFN TS-539) CNL-21-020, Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518)2021-11-0505 November 2021 Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie Modification to Support System Operability (BFN-TS-518) CNL-21-053, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535)2021-07-23023 July 2021 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2, in Support of Atrium 11 Fuel Use (TS-535) CNL-21-050, License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534)2021-05-29029 May 2021 License Amendment Request Regarding Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel (TS-534) CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-21-008, Application to Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements (BFN TS-532)2021-03-0505 March 2021 Application to Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements (BFN TS-532) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-002, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (TS-BFN-529)2020-07-17017 July 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (TS-BFN-529) CNL-20-044, License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis2020-05-0606 May 2020 License Amendment Request to Incorporate Tornado Missile Risk Evaluation Into the Licensing Basis CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)2020-03-27027 March 2020 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) CNL-19-125, Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition2019-12-19019 December 2019 Proposed Technical Specifications (TS) Change 510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 12, Additional License Condition CNL-19-009, License Amendment Request to Revise Emergency Plan Staff Augmentation Times (TS-515)2019-09-18018 September 2019 License Amendment Request to Revise Emergency Plan Staff Augmentation Times (TS-515) CNL-19-070, TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor2019-07-0303 July 2019 TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor CNL-19-034, to TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3..2019-03-0808 March 2019 to TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3.. CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)2019-01-25025 January 2019 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report2018-11-29029 November 2018 Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-099, Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results2018-07-23023 July 2018 Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus - Supplement 2, Operator Training Results ML18171A3372018-07-10010 July 2018 Issuance of Amendment to Revise License Condition 2.C(18)(a)3 CNL-18-085, License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme2018-06-15015 June 2018 License Amendment Request to Change the Implementation Date for License Amendments to Upgrade Emergency Action Level Scheme CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)32018-03-16016 March 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus NL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste2017-11-17017 November 2017 Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System. CNL-17-056, Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497)2017-08-15015 August 2017 Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) CNL-17-014, Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Pro2017-04-0505 April 2017 Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Proce CNL-16-155, Application to Revise Technical Specifications to Adopt TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, to Request Alternative to the ASME Code, and To..2017-01-17017 January 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, to Request Alternative to the ASME Code, and To.. CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision CNL-16-010, Application to Modify Technical Specification 4.3.1.2, Fuel Storage Criticality (TS-508)2016-08-12012 August 2016 Application to Modify Technical Specification 4.3.1.2, Fuel Storage Criticality (TS-508) CNL-16-016, License Amendment Request (BFN TS-509) to Change the Completion Date of Cyber Security Plan Implementation Milestone 82016-07-14014 July 2016 License Amendment Request (BFN TS-509) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 CNL-16-068, Update to License Amendment Request, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2016-03-28028 March 2016 Update to License Amendment Request, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) CNL-15-056, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506)2015-09-25025 September 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506) CNL-15-073, Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And.2015-09-16016 September 2015 Application to Modify the Technical Specifications by Adding New Specification TS 3.3.8.3, Emergency Core Cooling System Preferred Pump Logic, Common Accident Signal (CAS) Logic, and Unit Priority Re-Trip Logic, And. CNL-15-074, Update to License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants2015-06-19019 June 2015 Update to License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants CNL-15-029, License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TS-502)2015-03-0909 March 2015 License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TS-502) 2023-03-30
[Table view] Category:Technical Specification
MONTHYEARML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML21335A0672021-11-26026 November 2021 Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions ML24019A1192021-04-0808 April 2021 Technical Specification 3.1.6, Rod Pattern Control CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516)2020-03-27027 March 2020 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)2019-01-25025 January 2019 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-062, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 12018-04-19019 April 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 1 CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)32018-03-16016 March 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 12018-03-0707 March 2018 Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus ML18066A1202018-02-20020 February 2018 Summary Report for 10 CFR 50.59 Evaluations, Technical Specifications Bases Changes, Technical Requirements Manual Changes, and NRC Commitment Revisions - Updated CNL-16-165, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change2016-10-31031 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change NL-16-165, Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificat2016-10-31031 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, & 3 - Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specificati CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision CNL-16-109, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates2016-07-13013 July 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 23, Miscellaneous Updates CNL-16-077, for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information CNL-16-073, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information2016-04-22022 April 2016 Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 12, Responses to Requests for Additional Information CNL-15-240, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information2015-11-13013 November 2015 Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information CNL-15-187, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In..2015-09-25025 September 2015 Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In.. NL-15-169, Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 22015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 2 NL-15-169, Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 22015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 2 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 32015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 3 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 42015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 4 ML15282A1692015-09-21021 September 2015 Proposed Technical Specification Markups, Part 2 of 2 ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 52015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 5 ML15282A1802015-09-21021 September 2015 Retyped Technical Specifications Bases Changes, Attachment 5 ML15282A1782015-09-21021 September 2015 Retyped Proposed Technical Specifications Changes, Attachment 3 ML15282A1672015-09-21021 September 2015 License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes ML15282A1792015-09-21021 September 2015 Proposed Technical Specification Bases Markups, Attachment 4 ML15282A1662015-09-21021 September 2015 Proposed Technical Specification Markups, Part 1 of 2 CNL-15-002, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499)2015-03-0606 March 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499) CNL-14-166, Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479)2015-02-17017 February 2015 Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479) CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)2015-01-29029 January 2015 (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485) ML12242A4772012-08-28028 August 2012 License Amendment Request to Change Technical Specifications to Delete References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25 Percent Extension of Surveillance Intervals to Accel ML1106004082011-02-25025 February 2011 Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator Sets ML1032103342010-11-12012 November 2010 Revised Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, & 3D ML1024305282010-08-27027 August 2010 Technical Specifications Change TS-474 - Request to Add TS 3.7.3, Control Room Emergency Ventilation (Crev) System, Action to Address Two Crev Subsystems Inoperable Due to Inoperable Crev System High Efficiency Particulate ML1005507002010-02-18018 February 2010 Technical Specifications Change TS-468 - Request to Extend Completion Time for TS 3.8.1 Required Action B.4 - Emergency Diesel Generators a, B, C, D, 3A, 3B, 3C, and 3D ML0933506552009-11-17017 November 2009 Technical Specification Change TS-467-S - Utilization of Areva Fuel & Associated Analysis Methodologies - Non EPU Supplement ML0930801582009-10-23023 October 2009 Technical Specification Change TS-467 - Utilization of Areva Fuel and Associated Analysis Methodologies ML0929503402009-10-20020 October 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 - Browns Ferry TS Change 469; Sequoyah Change 09-04; and Watts Change 09-19 ML0922904712009-08-11011 August 2009 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to Round 25 - Request for Additional Information - SCVB-82 Through SCVB-86 and Replacement Documentation ML0921101192009-07-27027 July 2009 Technical Specifications Change 465 - Revision of Technical Specifications to Eliminate Unnecessary Water Local Leak Rate Tests 2023-03-10
[Table view] Category:Amendment
MONTHYEARCNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) ML24019A1192021-04-0808 April 2021 Technical Specification 3.1.6, Rod Pattern Control CNL-19-010, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513)2019-01-25025 January 2019 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 (BFN-TS-513) CNL-18-062, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 12018-04-19019 April 2018 Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 1 ML18079B1402018-02-23023 February 2018 Browns Ferry Nuclear Plant, Units 1, 2, and 3: Proposed Technical Specifications (TS) Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus CNL-16-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision2016-10-28028 October 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 35, Consolidated Power Uprate Safety Analysis Report Revision CNL-16-077, for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 for Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information ML15282A1662015-09-21021 September 2015 Proposed Technical Specification Markups, Part 1 of 2 ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate ML15282A1672015-09-21021 September 2015 License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes ML15282A1692015-09-21021 September 2015 Proposed Technical Specification Markups, Part 2 of 2 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 52015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 5 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 42015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 4 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 32015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 3 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 22015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 2 NL-15-169, Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 22015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 2 NL-15-169, Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate2015-09-21021 September 2015 Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate ML15282A1802015-09-21021 September 2015 Retyped Technical Specifications Bases Changes, Attachment 5 ML15282A1792015-09-21021 September 2015 Proposed Technical Specification Bases Markups, Attachment 4 ML15282A1782015-09-21021 September 2015 Retyped Proposed Technical Specifications Changes, Attachment 3 CNL-15-002, Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499)2015-03-0606 March 2015 Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Saftey Limits (TS-499) CNL-14-166, Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479)2015-02-17017 February 2015 Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479) ML12242A4772012-08-28028 August 2012 License Amendment Request to Change Technical Specifications to Delete References to Section XI of the ASME Code and Incorporate References to the ASME OM Code and Allow Application of 25 Percent Extension of Surveillance Intervals to Accel ML0933506552009-11-17017 November 2009 Technical Specification Change TS-467-S - Utilization of Areva Fuel & Associated Analysis Methodologies - Non EPU Supplement ML0930801582009-10-23023 October 2009 Technical Specification Change TS-467 - Utilization of Areva Fuel and Associated Analysis Methodologies ML0929503402009-10-20020 October 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 - Browns Ferry TS Change 469; Sequoyah Change 09-04; and Watts Change 09-19 ML0809103602008-03-27027 March 2008 Technical Specifications (TS) Change 444 - Adoption of Changes to Standard Technical Specifications Under Technical Specification Task Force (TSTF) Change Number - 448, Revision 3, Regarding Control Room Envelope. ML0633900572006-11-28028 November 2006 Tech Spec Pages for Amendment 265 Regarding Removal of License Condition 2.(C)4 (TS-432) ML0626101662006-09-14014 September 2006 Technical Specifications Change TS-453 - Instrument Setpoint Program - Supplement 2 (TAC Nos. MC9518, MC9519, & MC9520) ML0601104742006-01-0909 January 2006 Technical Specification Page for Amendment 295, Revision to Control Room Scram Time Testing Frequency TAC MC8037, TAC MC8038) ML0601104732006-01-0909 January 2006 Technical Specification Page for Amendment 253, Revision to Control Room Scram Time Testing Frequency ML0428701002004-10-12012 October 2004 Technical Specifications Change 438, Revision to Excess Flow Check Valve Surveillance Testing Frequency ML0427303522004-09-27027 September 2004 Technical Spec. Pages, Re. Implementation of Alternative Source Term ML0427303492004-09-27027 September 2004 Technical Spec.Pages Re Implementation of Alternative Source Term ML0427303642004-09-27027 September 2004 Technical Spec.Pages Re Implementation of Alternative Source Term ML0421904312004-08-0202 August 2004 (BFN) Unit 1 - Technical Specification (TS) Change TS 435 - Limiting Condition for Operation (LCO) Time for Containment Atmosphere Dilution (CAD) Subsystem Inoperability ML0421605562004-07-0808 July 2004 Technical Specifications (TS) Change 448 - One Time Frequency Extension for Containment Integrated Leak Rate Test Interval ML0333810122003-12-0101 December 2003 Tech Spec Pages for Amendment No 286 ML0333809912003-12-0101 December 2003 Tech Spec for Unit 3 Amendment No. 244 ML0333809822003-12-0101 December 2003 Tech Spec Pages for Amendment No. 249 ML0304403852003-02-12012 February 2003 Units 1, 2 and 3 - Technical Specifications (TS) Change 405 Supplement 1 - Decay Time ML0224803712002-08-20020 August 2002 (BFN) - Units 2 & 3 - Technical Specifications (TS) Change 417 - Reactor Water Cleanup System - Main Steam Valve Vault (Msvv) Area Temperature - High - Extension of Channel Calibration Surveillance Requirement Frequency ML0210103012002-03-28028 March 2002 Technical Specification Pages for Browns Ferry, Units 2 & 3 ML24019A1341998-09-0303 September 1998 Technical Specification 3.3.2.1, Control Rod Block Instrumentation 2023-01-31
[Table view] |
Text
August 2, 2004 TVA-BFN-TS-435 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket No. 50-259 Tennessee Valley Authority )
BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 1 - TECHNICAL SPECIFICATION (TS) CHANGE TS 435 - LIMITING CONDITION FOR OPERATION (LCO) TIME FOR CONTAINMENT ATMOSPHERE DILUTION (CAD) SUBSYSTEM INOPERABILITY
- 1. TVA letter, T.E. Abney to NRC, Browns Ferry Nuclear Plant (BFN) - Units 2 and 3 - Technical Specifications (TS)
Change 401 - Changes to Limiting Condition for Operation (LCO) Time for Containment Atmosphere Dilution (CAD)
Subsystem Inoperability, March 15, 2000.
- 2. NRC letter, W.O. Long to J.A. Scalice Browns Ferry, Units 2 and 3 - Amendments Re: Containment Air Dilution System Technical Specifications (TAC No. MA8471 AND MA8472),
May 24, 2000.
Pursuant to 10 CFR 50.90, TVA is submitting a request for an TS change (TS 435) to license DPR-33 for BFN Unit 1. The proposed TS change revises LCO 3.6.3.1, CAD System, to provide seven days of continued operation with two inoperable CAD subsystems.
This TS change request is consistent with the provisions for the CAD system in NUREG-1433, Revision 3, Standard Technical Specifications General Electric Plants, BWR/4 Specifications.
Regarding precedent, several other boiling water reactors, including Hatch 1, Duane Arnold, and Peach Bottom, all have TS which provide identical periods of continued operation with inoperable CAD subsystems. This change was previously proposed and approved for BFN Units 2 and 3 in References 1 and 2.
U.S. Nuclear Regulatory Commission Page 2 August 2, 2004 TVA has determined that there are no significant hazards considerations associated with the proposed TS change and that the change qualifies for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9). Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter and attachments to the Alabama State Department of Public Health.
The proposed TS change is necessary to support the restart of Unit 1. The change also ensures consistency with the current Units 2 and 3 TS. Therefore, TVA requests the amendment be approved by August 1, 2005 and that the implementation of the revised TS be within 60 days of NRC approval. provides TVAs evaluation of the proposed TS changes. contains copies of the appropriate marked-up Unit 1 TS pages, showing the proposed changes. Enclosure 3 contains copies of the appropriate updated Unit 1 TS pages, which show the resulting changes.
There are no regulatory commitments associated with this submittal. If you have any questions about this amendment, please contact me at (256)729-2636.
I declare under penalty of perjury that the foregoing is true and correct. Executed on August 2, 2004.
Sincerely, Original signed by T. E. Abney Manager of Licensing and Industry Affairs
Enclosures:
- 1. TVA Evaluation of Proposed Change
- 2. Proposed Technical Specification Changes (mark-up)
- 3. Proposed Technical Specification Changes (clean pages) cc: See Page 3
U.S. Nuclear Regulatory Commission Page 3 August 2, 2004 cc: (Enclosures)
State Health Officer Alabama State Department of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, Alabama 36130-3017
ENCLOSURE 1 BROWNS FERRY NUCLEAR PLANT (BFN)
TECHNICAL SPECIFICATION (TS) CHANGE 435 -
LIMITING CONDITION FOR OPERATION (LCO) TIME FOR CONTAINMENT ATMOSPHERE DILUTION (CAD) SUBSYSTEM INOPERABILITY TVA EVALUATION OF PROPOSED CHANGE INDEX SECTION TOPIC PAGE 1.0 Description ................................... 1 2.0 Proposed Change ............................... 1 3.0 Background .................................... 2 3.1 Objective of Proposed Change ...................... 2 3.2 CAD System Description and Design Basis ........... 3 3.3 BWR Owners Group Evaluation Of Combustible Gas Control ....................................... 4 3.4 Requirements of Standard Technical Specifications . 6 3.5 Risk Assessment of the Proposed Change ............ 7 3.6 Comparison with Previous Technical Specification changes for Unit 2 and 3 .......................... 8 4.0 Technical Analysis ............................ 9 5.0 Regulatory Safety Analysis .................... 9 5.1 No Significant Hazards Consideration .............. 10 5.2 Applicable Regulatory Requirements/Criteria ....... 11 6.0 Environmental Consideration ................... 13 7.0 References .................................... 13 i
1.0 DESCRIPTION
This letter requests an amendment to license DPR-33 for BFN Unit 1. The proposed change to TS LCO 3.6.3.1, CAD System, provides a completion time of seven days of continued reactor operation with two CAD subsystems inoperable. The current TS LCO requires reactor shutdown within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> under LCO 3.0.3 when both CAD subsystems are inoperable.
This change is consistent with the BWR/4 Standard Technical Specifications (STS), NUREG-1433, Revision 3, for the CAD system.
The change also ensures consistency with the current Units 2 and 3 TS. Therefore, TVA requests the amendment be approved by August 1, 2005.
2.0 PROPOSED CHANGE
The proposed change revises LCO 3.6.3.1, CAD System, to provide a completion time of seven days of continued reactor operation with two CAD subsystems inoperable. The specific changes are described below:
Revise Unit 1 TS Page 3.6-40 to insert the following Actions 3.6.3.1.B.1 and 3.6.3.1.B.2 (The existing 3.6.3.1.B.1 will be renumbered to 3.6.3.1.C.1):
CONDITION REQUIRED ACTION COMPLETION TIME B. Two CAD subsystems B.1 Verify by administrative means 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable that the hydrogen control function is maintained.
AND once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Restore one CAD subsystem 7 days to OPERABLE status contains copies of the appropriate marked-up Unit 1 TS pages, showing the proposed changes. Enclosure 3 contains copies of the appropriate updated Unit 1 TS pages, which show the resulting changes.
E1-1
3.0 BACKGROUND
On March 15, 2000, TVA submitted an application to changes to the Units 2 and 3 Technical Specification LCO 3.6.3.1, CAD System, to provide a completion time of seven days of continued reactor operation with two CAD subsystems inoperable (Reference 1). NRC issued the requested amendment on May 24, 2000 (Reference 2).
The overall content of this submittal is based on TVAs original application for Units 2 and 3. Included at the end of this section is a comparison of the proposed change, reason for change, background information, and technical analysis submitted in support of this proposed amendment with the information provided by TVA and approved by NRC for the Units 2 and 3 license amendments. This section also contains a discussion of:
- 1. The reasons for the proposed Unit 1 amendment;
- 2. The CAD System and its design basis;
- 3. The BWR Owners Group evaluation of combustible gas control;
- 4. The requirement contained in STS;
- 5. TVAs risk assessment for the proposed change; 3.1 Objective of Proposed Change BFN Units 1, 2, and 3 share a common CAD system. The system is comprised of two redundant subsystems each of which contains an external liquid nitrogen storage tank and the piping, valving, instrumentation, and controls necessary to inject nitrogen gas to the primary containment of any of the BFN units. The current Unit 1 Technical Specifications provides for a 30-day LCO whenever one of the two redundant CAD subsystems becomes inoperable. No specific LCO is provided for the condition when both CAD subsystems are inoperable. Therefore, should both CAD subsystems become inoperable, the current TS would require that the unit be placed in MODE 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> in accordance with the requirements of LCO 3.0.3.
The current Unit 1 TS requirement for the shutdown of the unit, for a short-term CAD system inoperability, is disproportionate with the overall safety function of the CAD system. Therefore, a relaxation to the CAD system LCO to provide a limited 7-day time period of continued operation is being proposed. This change is consistent with BWR/4 STS which already provide for a 7-day Completion Time when both CAD subsystems are inoperable if an alternate hydrogen control function is maintained. For BFN, the E1-2
containment inerting system provides the alternate means of hydrogen control.
The primary objective of this proposed TS change is to reduce the likelihood of the forced shutdown of the reactor(s) resulting from short-term loss of the CAD subsystems due to unanticipated maintenance problems. This would avoid the inherent risks associated with reactor shutdown activities resulting from maintenance issues that could be corrected in a timely manner.
Although it is not typical for both CAD systems to be inoperable, there is a reasonable probability this situation may occur, particularly during periods when one of the CAD subsystems is out of service for scheduled testing, or corrective or preventive maintenance. For this situation, with the existing TS, the invocation of LCO 3.0.3 for two inoperable CAD systems is very restrictive with regard to being able to return a subsystem to service or to perform unanticipated corrective maintenance within the 13-hour LCO. With the proposed 7-day completion time, it is more likely a subsystem could be returned to service or corrective maintenance be performed to remedy any likely CAD system equipment problem prior to exceeding the LCO.
Therefore, it is prudent to propose adoption of STS provisions for the CAD system to reduce the probability of a forced shutdown and the associated risk factors.
3.2 CAD System Description and Design Basis During normal power operation, the containment inerting system is used to maintain the primary containment atmosphere at less than 4.0 percent oxygen by volume, with the balance in nitrogen.
Following a potential loss-of-coolant accident (LOCA), hydrogen is postulated to evolve within the containment from metal-water reactions, and hydrogen and oxygen are produced by radiolysis of water. These are the only significant sources of hydrogen and oxygen. If the concentrations of hydrogen and oxygen were not controlled, a combustible gas mixture theoretically could be produced. To ensure a combustible gas mixture does not form, the oxygen concentration is kept below 5 percent by volume, and the hydrogen concentration is kept below 4 percent by volume by operation of the CAD system.
Assuming the analytic hydrogen and oxygen generation rates as specified in Safety Guide 7, Control of Combustible Gas Concentrations in Containment Following a Loss-of-Coolant Accident, the concentration of combustible gases in containment following a LOCA is controlled by the CAD system. This is accomplished by injecting nitrogen gas into the containment from one of two redundant CAD liquid nitrogen storage tanks to dilute E1-3
any hydrogen or oxygen generated by the LOCA and by venting the containment atmosphere as necessary through the standby gas treatment system. Refer to Updated Final Safety Analysis Report (UFSAR) Subsection 5.2.3.8 for a discussion of the CAD systems and UFSAR Figures 5.2-7 and 5.2-8 for a flow diagram.
This system is capable of keeping the concentration of oxygen in the containment atmosphere below 5 percent and hydrogen below 4 percent. In the event that post-accident monitoring showed that hydrogen and oxygen generation rates were substantially below those specified in the Safety Guide, the CAD system could be operated as necessary to maintain either the hydrogen concentration below 4 percent or the oxygen concentration below 5 percent. The time required to produce significant amounts of oxygen through radiolysis is lengthy and in the LOCA analysis CAD operation is not required until hours after a LOCA.
The CAD system can also be used to provide a non-safety grade, backup pneumatic supply to the drywell control air system, primarily for the purpose of increasing the availability of long-term main steam relief valve (MSRV) operation for events such as those associated with fire protection. This control air backup capability is not addressed in the TS, and the Fire Protection program allows the use of alternate methods and/or compensatory measures such as nitrogen bottles in instances where normal drywell control air equipment is not available. For design basis considerations, selected MSRVs are equipped with safety grade accumulators which are designed to ensure each MSRV can be opened 5 times as discussed in UFSAR Section 4.4.5 on the Automatic Depressurization System description.
CAD Subsystem A provides a backup pneumatic source for operation of the Hardened Wetwell Vent valves and the torus vacuum breaker isolation valves. The current TS allows for a single CAD subsystem to be inoperable for 30 days, where, in the case of CAD Subsystem A, this backup function is not available. Therefore the requested TS LCO of allowing both CAD subsystems to be inoperable for 7-days does not extend the period that this backup function may be unavailable.
3.3 BWR Owners Group Evaluation Of Combustible Gas Control The BWR Mark I Owners Group undertook a substantial study in response to the addition of the provisions in 10 CFR 50.44(c)(3) requiring recombiner capability for those light water reactors relying upon purge/repressurization systems as a primary means of hydrogen control. This study was published as NEDO-22155, Generation and Mitigation of Combustible Mixtures in Inerted BWR Mark I Containments, June 1982 (Reference 3). This NEDO concluded the oxygen generation rates assumed in Safety Guide 7 E1-4
(subsequently Regulatory Guide 1.7) were overly conservative and maintaining containment inerted during operation was sufficient to provide combustible gas control.
Following review of this study, NRC issued Generic Letter 84-09 (Reference 4), which stated that the BWR Mark I plants affected by the recombiner rule (including BFN) did not need to rely on use of a safety grade purge/repressurization system (CAD) specified by 10 CFR 50.44(f) and (g) as a primary means of hydrogen control provided that three technical criteria were met.
These three criteria from GL 84-09 are summarized below:
- 1. The plant has TS LCOs requiring containment atmosphere oxygen concentration to be maintained less than 4% by volume;
- 2. The plant has only nitrogen or recycled containment atmosphere for use in all pneumatic control systems within containment, and;
- 3. There are no potential sources of oxygen in containment other than radiolysis of the reactor coolant.
BFN is designed and operated in accordance with these criteria as follows:
- 1. The BFN primary containment is maintained below 4 percent oxygen by volume during normal operation in accordance with Technical Specification LCO 3.6.3.2 using nitrogen gas from the containment inerting system;
- 2. For Unit 1 all pneumatic equipment located inside the primary containment utilizes nitrogen from the containment inerting system with a backup from the CAD system as its pneumatic supply. Therefore, station control air is not used to provide the pneumatic supply to containment equipment; and
- 3. Pathways which could introduce oxygen into the primary containment are isolated during normal operation.
NRC issued a Safety Evaluation Report (SER) dated July 6, 1989, which evaluated NEDO-22155 (Reference 5). The SER concluded, in some areas, the NEDO-22155 analysis under-predicts oxygen radiolysis generation rates. However, the SER also stated Regulatory Guide 1.7 (which superseded Safety Guide 7) is conservative in its overall oxygen generation prediction.
Therefore, a technical basis exists that the AEC Safety Guide 7 oxygen generation rates assumed in the BFN LOCA analysis are more E1-5
conservative than necessary. This provides additional justification for a TS allowance for a short period of CAD system inoperability.
3.4 Requirement of Standard Technical Specifications The BWR/4 STS, NUREG-1433, Revision 3, provide a 7-day continued operation allowance with two CAD systems inoperable if an alternate hydrogen control system is verified available. For BFN, the normal containment inerting system provides this hydrogen control function.
The normal containment inerting system is used during the initial purging of the primary containment to establish an inerted containment, and it also provides a supply of make up nitrogen during reactor operation. The system consists of a liquid nitrogen storage tank, a purge vaporizer, a makeup vaporizer, pressure-reducing valves and controllers, and instrumentation, valves, and associated piping. Refer to the UFSAR 5.2-6a series of figures for flow diagrams of the system.
The normal inerting system supplies nitrogen from a common onsite storage tank through a common purge vaporizer or makeup vaporizer where the liquid nitrogen is converted to the gaseous state. The gaseous nitrogen then flows through the purge or make up pressure-reducing valves and flow meters into the torus or drywell.
In the event of a LOCA, the Core Standby Cooling Systems are designed to prevent significant fuel damage and the generation of significant quantities of hydrogen. Should fuel damage be postulated, and hydrogen and oxygen be generated per AEC Safety Guide 7 assumptions, the inerted primary containment atmosphere ensures that the oxygen concentration is too low to react with this hydrogen gas. Hence, any oxygen which can react must be generated from the radiolytic decomposition of water under post-LOCA conditions.
The primary containment inerting system can be used to provide nitrogen dilution in a manner analogous to the CAD system. In fact, the BFN Emergency Operating Instructions (EOIs) preferentially direct the use of the normal primary containment inerting system for purging and venting during emergency conditions. The EOI procedural policy, which is in accordance with industry emergency procedure guidelines, recognizes the inerting system is well suited for use under emergency conditions since it is routinely used for purge and vent operations under normal operations. Under this procedural direction, CAD serves as the backup method rather than the primary means to mitigate any combustible mixture formation. Therefore, the proposed TS E1-6
change is consistent with this EOI usage of the normal inerting system by requiring it to be functional as the alternate hydrogen control function during any period of reactor operation if both CAD subsystems are inoperable. This is consistent with STS provisions for CAD.
3.5 Risk Assessment of the Proposed Change In a qualitative sense, the Browns Ferry Probabilistic Safety Assessment (PSA) baseline Core Damage Frequency (CDF) values for Unit 1 indicate a low probability per reactor year of a core-damaging event. Since CADs formal design function is not needed unless core damage has already occurred, and the core damage probability is low, a low probability of needing CAD for its design use can be observed directly from the baseline CDF value.
Since the baseline CDF value is based on an annual time frame, and the proposed LCO under discussion is only a small part of a year, these low probabilities can be reduced even further during an LCO period.
No planned maintenance or test activities remove both CAD systems from service. Therefore, the proposed TS is requested as a contingency provision for situations when both subsystems become inoperable due to unexpected circumstances. The most likely circumstance for this situation would be an unexpected maintenance problem on a CAD subsystem while the other subsystem was out of service for preventive or corrective maintenance.
The CAD design basis oxygen control function is not required until well after a hydrogen producing LOCA event has occurred because of the time necessary for radiolysis to produce sufficient oxygen inside primary containment. Since the safety-related design function of CAD is not required prior to a core damaging event (the interval evaluated by the BFN Level I PSA),
it follows this CAD function cannot impact CDF values.
BFN design basis calculations indicate the CAD function would not be needed sooner than 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> post-accident under anticipated containment conditions. The BFN Level II PSA evaluation for large early release frequency (LERF) evaluates the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> post-accident. Therefore, the availability of the CAD function does not affect LERF.
Also, as noted earlier, the proposed LCO will also require the containment inerting system be verified available if both CAD subsystems are inoperable. The containment inerting system, although not safety-grade, can provide the analogous combustible gas control function as CAD. In the BFN symptom based EOIs, it is used in several contingencies to provide containment inerting functions. The inerting system tank, as well as the CAD tanks, E1-7
is located external to the reactor building and can be easily accessed. Therefore, it is easy to refill the inerting tank or CAD tanks using nitrogen tank trucks as contingency options.
The CAD system non-safety function of supplying backup pneumatic motive energy for long-term MSRV operation has nominal relevance to PSA CDF calculations, because MSRV operation can affect CDF.
However, the PSA modeling shows there is no significant change to the Unit 1 CDF when the CAD backup pneumatic supply function is assumed to be either 100% available or never available (i.e.,
risk-reduction worth or risk-achievement worth values are not significant).
In summary, the addition of TS provisions for the 7-day CAD LCO has little impact on risk. Anticipated use of the LCO is as a contingency specification for unexpected maintenance problems on the CAD system. The CAD system is monitored under the BFN Maintenance Rule Program, and CAD subsystem unavailability is unlikely to increase as a result of issue of the proposed Technical Specification change. A longer LCO would provide an opportunity to remedy the system problem and return a subsystem to service in an orderly manner. This would avoid the inherent transition risk associated with an expedited shutdown of multiple units. Therefore, the proposed TS change is considered beneficial with regard to risk considerations.
3.6 Comparison with Previous Technical Specification Changes for Unit 2 and 3 TVA has compared the proposed change, reason for change, background information, and technical analysis submitted in support of this proposed amendment with the information provided by TVA and approved by NRC in References 1 and 2 for the revision to the Units 2 and 3 TS. The comparison for each of these areas is provided below:
x The proposed change to the Unit 1 TS is the same change as proposed and approved for Units 2 and 3.
x The underlying reason for the Unit 1 TS change is the same as previously submitted for the Units 2 and 3 TS change (i.e., to reduce the likelihood of the forced shutdown of the reactor due to the short-term loss of the CAD subsystem). In addition, TVA needs to maximize consistency between the Unit 1 and Units 2 and 3 TS, operations and maintenance practices prior to restarting Unit 1.
x The background information provided in support of the Unit 1 TS change incorporates the same elements previously submitted in support of the Units 2 and 3 TS change.
E1-8
x The technical analysis submitted for this Unit 1 TS change incorporates the same elements previously submitted in support of the previous TS changes for Units 2 and 3.
4.0 TECHNICAL ANALYSIS
The BFN Unit 1 TS currently require a shutdown to Mode 3 under the conditions of LCO 3.0.3 if both CAD subsystems become inoperable. The low probability of a fuel-damaging accident occurring during a 7-day period, the fact CAD is not required immediately post-accident, and the availability of oxygen mitigation systems other than CAD which are preferred under the EOIs make the requested TS change acceptable. The proposed change is also consistent with STS. Also, previous regulatory studies (NEDO-22155) concluded the AEC oxygen generation source terms are conservative, and the inerted containment provides the chief protection against the creation of combustible mixtures in the primary containment atmosphere.
A review of STS approved at other BWRs of similar design, such as Peach Bottom Units 2 and 3, and Hatch Unit 1, found 7 days or greater LCO times were typical for conditions where both CAD subsystems were inoperable. The justification provided at these plants is similar to this submittal, i.e., the risk of a LOCA during the LCO interval is small, CAD usage is not immediately required even should a fuel-damaging accident occur, and alternate hydrogen control capability exists within the plant design. As noted previously, 7-days are provided in STS for plants with an alternate hydrogen control function such as Browns Ferry.
The technical analysis demonstrates a completion time of seven days of continued reactor operation with two CAD subsystems inoperable maintains an adequate defense in depth and sufficient safety margins. The resulting increases in core damage frequency and risk are small.
5.0 REGULATORY SAFETY ANALYSIS The Tennessee Valley Authority (TVA) is submitting an amendment request to license DPR-33 for the Browns Ferry Nuclear Plant (BFN) Unit 1. The proposed Technical Specification (TS) change revises Limiting Condition for Operation (LCO) 3.6.3.1 to permit seven days of continued operation with two inoperable Containment Atmospheric Dilution (CAD) subsystems.
E1-9
5.1 No Significant Hazards Consideration TVA has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, Issuance of amendment, as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The safety-related function of the CAD system is to mitigate the effects of a loss-of-coolant-accident (LOCA) by limiting the volumetric concentration of oxygen in the primary containment atmosphere. The CAD System is not an event initiator, therefore, the probability of the occurrence of an accident is not affected by this proposed Technical Specification change. Emergency procedures preferentially use the normal containment inerting system to provide post-accident vent and purge capability, with the CAD system only serving in a backup role to this system. Hence, in the event of the inoperability of both CAD subsystems, the proposed TS require the normal containment inerting system to be verified available as an alternate oxygen control means. Therefore, the proposed TS change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change does not introduce new equipment, which could create a new or different kind of accident. This proposed change does not result in any changes to the CAD equipment design or capabilities or to the operation of the plant. No new external threats, release pathways, or equipment failure modes are created. Therefore, the implementation of the proposed change will not create a possibility for an accident of a new or different type than those previously evaluated.
3.0 Does the proposed change involve a significant reduction in a margin of safety?
E1-10
Response: No As stated in GL 84-09, a Mark I type boiling water reactor (BWR) plant does not rely upon purge/repressurization systems such as CAD as its primary means of hydrogen control when the unit is operated in accordance with certain technical criteria. The BFN units are operated in accordance with these criteria. The BFN Unit 1 containment is inerted with nitrogen during normal operation, nitrogen from the containment inerting system with a backup from the CAD system is used for pneumatically operated components inside containment, and there are no potential sources of oxygen generation inside containment other than the radiolytic decomposition of water. The system preferred by the Emergency Operating Instructions (EOIs) for oxygen control post-accident is the normal primary containment inerting system. Because the probability of an accident involving hydrogen and oxygen production is small, CAD is not the primary system used to mitigate the creation of combustible containment atmosphere mixtures, and because the requested LCO where both CAD subsystems is inoperable is not long, no significant reduction in the margin of safety is associated with this proposed amendment.
Based on the above, TVA concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
5.2 Applicable Regulatory Requirements/Criteria General Design Criterion 41 and Title 10, Code of Federal Regulations (10 CFR), Part 50, Section 44, require that reactor facilities be provided with a means for post-accident control of combustible gases in the containment. To meet these requirements, the BFN facilities are provided with a shared, redundant (i.e., two trains or "subsystems"), safety-grade CAD system as described in Section 5.2.6 of the UFSAR and reported in the staff's December 21, 1972 Safety Evaluation Supplement No. 1.
The CAD system is classified as an engineered safety feature.
During a postulated design basis LOCA, hydrogen, a combustible gas would be generated by metal-water reaction, radiolysis and corrosion. If hydrogen and oxygen are present in the containment at sufficient concentration the containment barrier and equipment within the containment are threatened by the possibility of excessive temperature and pressure due to hydrogen combustion.
The CAD system is designed to provide the capability to prevent a combustible hydrogen/oxygen mixture from forming during a design E1-11
basis LOCA. Assuming the hydrogen and oxygen generation rates as specified in Regulatory Guide 1.7 "Control of Combustible Gas Concentrations in Containment Following a Loss-of-Coolant Accident," the concentration of combustible gases in containment following a LOCA can be controlled by the CAD system. This is accomplished by maintaining an inert containment during normal operation, and, in the event of an accident, using the CAD system to inject nitrogen gas into the containment to dilute any oxygen generated by the LOCA, venting the containment atmosphere as necessary, for pressure control, through the standby gas treatment system.
The CAD system can also be used to provide a non-safety grade, backup pneumatic supply to the drywell pneumatic system, primarily for the purpose of increasing the availability of long-term MSRV operation for beyond design basis events such as those associated with fire protection. This pneumatic backup capability is not addressed in the Technical Specifications, and the Fire Protection program allows the use of alternate methods and/or compensatory measures such as nitrogen bottles in instances where the normal drywell pneumatic supply is not available. Selected MSRVs are equipped with safety grade accumulators which are designed to ensure each MSRV can be opened five times as discussed in UFSAR Section 4.4.5 on the Automatic Depressurization System description.
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or the health and safety of the public.
E1-12
6.0 ENVIRONMENTAL CONSIDERATION
A review has determined the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
7.0 REFERENCES
- 3. TVA letter, T.E. Abney to NRC, Browns Ferry Nuclear Plant (BFN) - Units 2 and 3 - Technical Specifications (TS)
Change 401 - Changes to Limiting Condition for Operation (LCO) Time for Containment Atmosphere Dilution (CAD)
Subsystem Inoperability, March 15, 2000.
- 4. NRC letter, W.O. Long to J.A. Scalice Browns Ferry, Units 2 and 3 - Amendments Re: Containment Air Dilution System Technical Specifications (TAC No. MA8471 AND MA8472),
May 24, 2000.
- 5. General Electric report, NEDO-22155, Generation and Mitigation of Combustible Mixtures in Inerted BWR Mark I Containments, June 1982.
- 6. NRC Generic Letter 84-09, May 8, 1984, Recombiner Capability Requirements of 10 CFR 50.44(c)(3)(ii).
- 7. NRC SER on General Electric Companys Methodology for Determining Rates of Generation of Oxygen by Radiolytic Decomposition (NEDO 22155) - July 6, 1989.
E1-13
ENCLOSURE 2 BROWNS FERRY NUCLEAR PLANT TECHNICAL SPECIFICATION CHANGE 435 -
LIMITING CONDITION FOR OPERATION (LCO) TIME FOR CONTAINMENT ATMOSPHERE DILUTION (CAD) SUBSYSTEM INOPERABILITY PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)
CAD System 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Containment Atmosphere Dilution (CAD) System LCO 3.6.3.1 Two CAD subsystems shall be OPERABLE.
[note: new text below is APPLICABILITY: MODES 1 and 2. shown in bold type in the shaded areas]
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CAD subsystem A.1 Restore CAD subsystem 30 days inoperable. to OPERABLE status.
B. Two CAD subsystems B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable means that the hydrogen control function is maintained. AND once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Restore one CAD 7 days subsystem to OPERABLE status B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion C. Time not met. C.1 BFN-UNIT 1 3.6-40 Amendment No. 234
ENCLOSURE 3 BROWNS FERRY NUCLEAR PLANT TECHNICAL SPECIFICATION CHANGE 435 -
LIMITING CONDITION FOR OPERATION (LCO) TIME FOR CONTAINMENT ATMOSPHERE DILUTION (CAD) SUBSYSTEM INOPERABILITY PROPOSED TECHNICAL SPECIFICATION CHANGES (CLEAN PAGES)
CAD System 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Containment Atmosphere Dilution (CAD) System LCO 3.6.3.1 Two CAD subsystems shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CAD subsystem A.1 --------------NOTE------------
inoperable. LCO 3.0.4 is not applicable.
Restore CAD subsystem 30 days to OPERABLE status.
B. Two CAD subsystems B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable means that the hydrogen control function is AND maintained.
once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Restore one CAD 7 days subsystem to OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
BFN-UNIT 1 3.6-40 Amendment No. 234