Semantic search
Jump to navigation
Jump to search
- NL-15-169, ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues.
- NL-15-169, Browns Ferry Unit 3 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology
- NL-15-169, Browns Ferry Units 1, 2 and 3, Flow Induced Vibration Analysis and Monitoring Program
- NL-15-169, Browns Ferry, Units 1, 2 and 3 - License Amendment Request TS-505 Extended Power Uprate, Evaluation of Proposed Changes
- NL-15-169, Browns Ferry, Units 1, 2 and 3 - List of Regulatory Commitments
- NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Bases Markups, Attachment 4
- NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 1 of 2
- NL-15-169, Browns Ferry, Units 1, 2 and 3 - Proposed Technical Specification Markups, Part 2 of 2
- NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Proposed Technical Specifications Changes, Attachment 3
- NL-15-169, Browns Ferry, Units 1, 2 and 3 - Retyped Technical Specifications Bases Changes, Attachment 5
- NL-15-169, Browns Ferry, Units 1, 2 and 3 - Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate
- NL-15-169, Browns Ferry, Units 1, 2 and 3, ANP-3327NP, Revision 1, Evaluation of Areva Fuel Thermal-Hydraulic Performance for Browns Ferry at EPU
- NL-15-169, Browns Ferry, Units 1, 2 and 3, Probabilistic Risk Assessment
- NL-15-169, Browns Ferry, Units 1, 2 and 3, RHR Heat Exchange K-values Utilities in EPU Containment Analyses
- NL-15-169, Browns Ferry, Units 1, 2 and 3, Supplemental Environmental Report
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Areva Affidavits
- NL-15-169, Browns Ferry, Units 1, 2, and 3, General Electric Hitachi Affidavits
- NL-15-169, Browns Ferry, Units 1, 2, and 3, List and Status of Plant Modifications
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Template of NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (Retyped)
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Template of NRC Review Standard for Extended Power Uprates, RS-001 Safety Evaluation Template GDC Markup (with Redline/Strike Out)
- NL-15-169, NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis.
- NL-15-169, Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7