ND-22-0348, ITAAC Closure Notification on Completion of ITAAC 2.1.02.13c (Index Number 65)

From kanterella
(Redirected from ND-22-0348)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 2.1.02.13c (Index Number 65)
ML22133A212
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/13/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0348
Download: ML22133A212 (5)


Text

Jamie M. Coleman 7825 Rive r Road

._ Southern Nuclear Reg ul atory Affairs Director Way nesbo ro , GA 3083 0 Vog tle 3 & 4 706-848-6926 tel May 13, 2022 Docket No. : 52-025 ND-22-0348 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.1.02.13c [Index Number 65)

Lad ies and Gentlemen :

In accordance with 10 CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests , Analyses , and Acceptance Criteria (ITAAC) Item 2.1.02.13c [Index Number 65) .

This ITAAC confirms that the reactor coolant pumps trip after receiving a signal from the Diverse Actuation System (DAS) . The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01 , "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52 ," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter conta ins no new NRC regulatory commitments . Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52 .99.

If there are any questions , please contact Kelli Roberts at 706-848-6991 .

Respectfully submitted ,

Jam ie M. Coleman Regulatory Affa irs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.1.02 .13c [Index Number 651 JMC/RLB/sfr

U.S. Nuclear Regulatory Commission ND-22-0348 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. A. S. Parton Ms . K. A. Roberts Ms . J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms . A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE : VND .LI.L06 File AR.01 .02.06 cc:

Nuclear Regulatory Commission Ms . M. Bailey Mr. M. King Mr. G. Bowman Ms . A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0 . Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S . Nuclear Regulatory Commission ND-22-0348 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S. L. Zwack Other Mr. S. W . Kline , Bechtel Power Corporation Ms . L. Matis , Tetra Tech NUS, Inc.

Dr. W. R. Jacobs , Jr., Ph .D. , GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey , Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton , Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0348 Enclosure Page 1 of 2 Southern Nuclear Operating Company ND-22-0348 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.1.02.13c (Index Number 65]

U.S. Nuclear Regulatory Commission ND-22-0348 Enclosure Page 2 of 2 ITAAC Statement Design Commitment 13.c) The RCPs trip after receiving a signal from the DAS .

Inspections/Tests/Analyses Testing will be performed using real or simulated signals into the DAS .

Acceptance Criteria The RCPs trip after receiving a signal from the DAS .

ITAAC Determination Basis Testing was performed as described in ITAAC Technical Report SV3-RCS-ITR-800065 (Reference 1) to verify that the Reactor Coolant Pumps (RCPs) trip after receiving a signal from the Diverse Actuation System (DAS). Real signals were provided into the DAS and the RCPs were confirmed to trip after a signal is received from the DAS .

Each RCP Variable Frequency Drive (VFD) feeder breaker was placed in the closed position and a manual Core Makeup Tank (CMT) actuation was initiated. The CMT actuation signal from the DAS caused the RCPs to trip when the RCP VFD feeder breakers opened. The RCP VFD feeder breakers were verified locally to be open . The Unit 3 test results documented in Reference 1 confirm that each RCP trips after receiving a signal from the DAS .

Reference 1 is available for NRC inspection as part of the ITAAC 2.1.02.13c Completion Package (Reference 2) .

ITAAC Finding Review In accordance with plant procedures for ITAAC completion , Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.1.02 .13c (Reference 2) and is ava ilable for NRC review.

ITAAC Completion Statement Based on the above information , SNC hereby notifies the NRC that ITAAC 2.1.02 .13c was performed for VEGP Unit 3 and that the prescribed acceptance criteria was met.

Systems , structures, and components verified as part of this ITAAC are being maintained in their as-designed , ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-RCS-ITR-800065 , Unit 3 Testing Results for Reactor Coolant Pump Trip From DAS:

ITAAC 2.1.02.13c, Rev 0 2 . 2.1.02.13c-U3-CP-Rev0, ITAAC Completion Package