ML22119A221
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/29/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.2.01.11a.iv, ND-22-0320
Download: ML22119A221 (8)


Text

~ Southern Nuclear Jamie M. Coleman 7825 River Road Regu latory Affairs Director Way nesboro, GA 30830 Vogtle 3 & 4 706-848-6926 tel APR 2 9 2022 Docket No.: 52-025 ND-22-0320 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 Resubmittal of ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv [Index Number 117)

Ladies and Gentlemen:

In accordance with 10 CFR 52 .99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Comm ission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.2.01 .11 a.iv [Index Number 117). This ITAAC confirms that check valves with active safety-related functions change position under preoperational test pressure, temperature , and fluid flow conditions. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01 , "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52 ," which was endorsed by the NRC in Regulatory Guide 1.215.

Southern Nuclear Operating Company (SNC) previously submitted ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv [Index Number 117), Letter Number ND-22-0173 dated Apr 15, 2022 [ML22105A580] . This resubmittal addresses changes made to a Principal Closure Document (Reference 3 in the enclosure) which supports the completion of the subject ITAAC and supersedes ND-22-0173 in its entirety.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publ ication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991 .

Respectfully submitted ,

Gti~

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.01 .11 a.iv [Index Number 117]

JMC/ DCH/sfr

U.S. Nuclear Regulatory Commission ND-22-0320 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01 .02.06 Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. 8. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S . Nuclear Regulatory Commission ND-22-0320 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W. Kline , Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D. , GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0320 Enclosure Page 1 of 5 Southern Nuclear Operating Company ND-22-0320 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.01 .11 a.iv [Index Number 117]

U.S. Nuclear Regulatory Commission ND-22-0320 Enclosure Page 2 of 5 ITAAC Statement Design Commitment 11.a) The motor-operated and check valves identified in Table 2.2.1-1 perform an active safety-related function to change position as indicated in the table.

Inspections/Tests/Analyses iv) Exercise testing of the check valves with active safety functions identified in Table 2.2.1-1 will be performed under preoperational test pressure, temperature and fluid flow conditions.

Acceptance Criteria iv) Each check valve changes position as indicated in Table 2.2.1 -1.

ITAAC Determination Basis Multiple ITAAC were performed with inspections and tests to verify the motor-operated and check valves identified in VEGP Combined License (COL) Appendix C Table 2.2.1-1 perform an active safety-related function to change position as indicated in the table under preoperational test pressure, temperature, and flow conditions. This ITAAC performed testing that verified the check valves change position as indicated in Attachment A.

Testing was performed in accordance with Unit 3 test work packages listed in References 1-7. This testing verified that each check valve changes position as indicated in Attachment A.

The work packages associated with Reference 1 established the initial conditions of Compressed and Instrument Air System (CAS) pressurizing the instrument and service air piping and installed temporary pressure indications upstream and downstream of CAS-PL-V015 . This section of the system piping is depicted in Piping and Instrument Drawing (P&ID) CAS-M6-005 and 012.

Pressurizing the CAS piping downstream of the containment isolation check valve demonstrated the containment isolation check valve opened. The instrument air line was manually isolated and a test connection upstream of check valve CAS-PL-V015 was opened. The differential pressure created closed CAS-PL-V015, which was locally verified to transfer closed by differential pressure indication.

This same methodology was utilized to test the service air supply inside containment isolation check valve, CAS-PL-V205.

The work packages in Reference 2 initial conditions had the Component Cooling Water System (CCS) in service supplying containment loads which demonstrated the containment isolation check valve was open. The testing then directed performance of the CCS Check Valve Exercise, which closed a manual valve upstream and downstream of CCS-PL-V201. Demineralized water was connected to a test connection downstream of CCS-PL-V201 thereby pressurizing the piping downstream of CCS-PL-V201 . A test connection upstream of CCS-PL-V201 was opened , creating a differential pressure across the valve , and flow rate was monitored at this test connection. When flow rate stabilized, the reading was recorded and verified to be< 1 gpm. This value confirmed that CCS-PL-V201 transferred closed. This section of the system piping is depicted in P&ID CCS-M6-002. References 3 and 4 used this same methodology for valves FPS-PL-V052 (depicted in P&ID FPS-M6-004), and VWS-PL-V062 (depicted in P&ID VWS-M6-003). Prior to initiating the check valve exercise test, the Fire Protection System (FPS) and Central Chilled Water System (VWS) were aligned to demonstrate that the containment isolation check valves for FPS and VWS were opened.

U.S. Nuclear Regulatory Commission ND-22-0320 Enclosure Page 3 of 5 The work packages in Reference 5 initial conditions aligned and placed a portion of the Demineralized Water Transfer and Storage System (DWS) in service which demonstrated the containment isolation check valve was open. The testing then directed performance of the DWS Check Valve Exercise which closed upstream and downstream isolation valves and drained the isolated demineralized water piping. A test connection upstream of DWS-PL-V245 was opened and a metered air supply was connected to a test connection downstream of DWS-PL-V245. When pressure stabilized, the flow reading was taken and verified to be less than the local leak rate limit which confirmed that the valve transfers closed. This section of the system piping is depicted in P&ID DWS-M6-007.

The work packages in Reference 6 established the initial conditions for Spent Fuel Pool Cooling System (SFS) flow to containment which demonstrated the containment isolation check valve opened. The test then directed the closure of SFS Discharge line Containment Isolation Motor-Operated Valve-Outside Reactor Containment, SFS-PL-V038, which is upstream of SFS-PL-037.

Then a test connection was opened between SFS-PL-V038 and SFS-PL-037. This created a differential pressure across SFS-PL-V037, with the higher pressure being downstream of SFS-PL-V037. The flow from the test connection to a measuring container was timed. After more than one minute, the test connection valve was closed, and the volume of water documented. The leakage rate on the upstream side of SFS-PL-V037 was calculated and verified to be< 1 gpm. This section of the system piping is depicted in P&ID SFS-M6-001. This value confirmed that SFS-PL-V037 transfers closed.

The work packages in Reference 7 performed the Containment Air Filtration System (VFS) Vacuum Relief Valve Test and Check Valve Exercise to verify Vacuum Relief Containment Isolation Check Valves, VFS-PL-V803A/B, changed positions as shown in Attachment A. A temporary air supply was hooked up and aligned to the containment air purge ducting outside containment, a blank flange was installed to block flow through VFS-PL-V803B, and system alignment was performed to direct air to VFS-PL-V803A. VFS-PL-803A was initially verified to be closed, the air supply was initiated and VFS-PL-803A was locally verified to fully open. The air supply was isolated and VFS-PL-V803A was locally verified to close. The blank flange was removed from VFS-PL-V803B and installed on VFS-PL-V803A and the testing was repeated for VFS-PL-V803B. This section of the system piping is depicted in P&ID VFS-M6-001. This testing verified that VFS-PL-V803A/B transfer opened and closed .

The combination of the test results confirmed that each check valve changes position as indicated in Table 2.2.1-1.

References 1 through 7 are available for NRC inspection as part of Unit 3 ITAAC Completion Package (Reference 8).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion , Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.2.01 .11 a.iv Completion Package (Reference 8) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-22-0320 Enclosure Page 4 of 5 ITAAC Completion Statement Based on the above information , SNC hereby notifies the NRC that ITAAC 2.2.01 .11 a.iv was performed for VEGP Unit 3 and that the associated acceptance criteria was met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-CNS-ITR-802117, Rev 0, "Unit 3 Recorded Results of CAS Check Valves Position:

ITAAC 2.2.01 .11a.iv, NRC Index Number: 117"

2. SV3-CNS-ITR-801117, Rev 0, "Unit 3 Recorded Results of CCS Check Valves Position:

ITAAC 2.2.01 .11a.iv, NRC Index Number: 117"

3. SV3-CNS-ITR-804117, Rev 1, "Unit 3 Recorded Results of FPS Check Valve Position:

ITAAC 2.2.01 .11 a.iv, NRC Index Number: 117"

4. SV3-CNS-ITR-806117, Rev 0, "Unit 3 Recorded Results of VWS Check Valve Position:

ITAAC 2.2.01 .11 a.iv, NRC Index Number: 117"

5. SV3-CNS-ITR-803117, Rev 0, "Unit 3 Recorded Results of DWS Check Valve Position:

ITAAC 2.2.01 .11 a.iv, NRC Index Number: 117"

6. SV3-CNS-ITR-800117, Rev 1, "Unit 3 Recorded Results of SFS Check Valves Position:

ITAAC 2.2.01 .11 a.iv, NRC Index Number: 117"

7. SV3-CNS-ITR-805117, Rev 0, "Unit 3 Recorded Results of VFS Check Valve Position:

ITAAC 2.2.01 .11 a.iv, NRC Index Number: 117"

8. 2.2.01 .11 a.iv-U3-CP-Rev 0, ITAAC Completion Package

U.S . Nuclear Regulatory Commission ND-22-0320 Enclosure Page 5 of 5 Attachment A Excerpt from COL Appendix C Table 2.2.1-1 Equipment Name Taci No. Active Function Service Air Supply CAS-PL-V205 Transfer Closed Inside Containment Isolation Check Valve Instrument Air Supply CAS-PL-V015 Transfer Closed Inside Containment Isolation Check Valve CCS Containment Isolation Check Valve -

CCS-PL-V201 Transfer Closed Inlet Line Inside Reactor Containment (IRC)

Demineralized Water Supply DWS-PL-V245 Transfer Closed Containment Isolation Check Valve IRC Fire Water FPS-PL-V052 Transfer Closed Containment Isolation Supply Check Valve Inside Spent Fuel Pool Cooling System (SFS) Discharge Line SFS-PL-V037 Transfer Closed Containment Isolation Check Valve IRC Vacuum Relief Transfer Closed /

VFS-PL-V803A Containment Isolation Check Valve A IRC Transfer Open Vacuum Relief Transfer Closed /

VFS-PL-V803B Containment Isolation Check Valve B IRC Transfer Open Fan Coolers Supply VWS-PL-V062 Transfer Closed Containment Isolation Check Valve IRC