ND-22-0310, ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113)

From kanterella
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 2.2.01.10c (Index Number 113)
ML22115A248
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/25/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0310
Download: ML22115A248 (7)


Text

>-,, Southern Nuclear Jamie M. Coleman Reg ulatory Affairs Director Vogtl e 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6926 tel APR 2 5 2022 Docket No.: 52-025 ND-22-0310 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.2.01 .10c (Index Number 1131 Ladies and Gentlemen :

In accordance with 10 CFR 52 .99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses , and Acceptance Criteria (ITAAC) Item 2.2.01 .10c (Index Number 1131. This ITAAC confirms that the remotely operated valves, identified in Combined License (COL)

Appendix C Table 2 .2 .1-1 as having Diverse Actuation System (DAS) control , perform the active function identified in Table 2.2.1-1 after receiving a signal from DAS. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NE!) 08-01 , "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52 ," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52 .99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted ,

~~

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.01 .10c (Index Number 1131 JMC/ RLB/sfr

U.S. Nuclear Regulatory Commission ND-22-0310 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. A. S. Parton Ms. K. A. Robe rts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND .LI .L06 File AR.01 .02.06 cc:

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khou ri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0 . Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0310 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S. L. Zwack Other Mr. S. W. Kline , Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-031 O Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0310 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.01 .1 0c [Index Number 113]

U.S. Nuclear Regulatory Commission ND-22-031 0 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 10.c) The valves identified in Table 2.2.1-1 as having DAS control perform an active safety function after receiving a signal from DAS.

Inspections/Tests/ Analyses Testing will be performed on remotely operated valves listed in Table 2.2.1-1 using real or simulated signals into the DAS.

Acceptance Criteria The remotely operated valves identified in Table 2.2.1-1 as having DAS control perform the active function identified in the table after receiving a signal from DAS.

ITAAC Determination Basis Testing was performed as described in ITAAC Technical Report SV3-CNS-ITR-800113 (Reference 1) to verify that the remotely operated valves identified in Combined License (COL)

Appendix C Table 2.2.1-1 (Attachment A) as having Diverse Actuation System (DAS) control perform an active safety function after receiving a signal from DAS. Testing was performed on the remotely operated valves identified in Attachment A using real signals into the DAS to verify they perform the active function identified in Attachment A after receiving a signal from DAS.

Refe rence 1 confirmed that the containment isolation valves with DAS control received a signal from DAS and performed the active function required. The valves were verified to be open, tested by manually actuating a Containment Isolation signal at the DAS panel in the Main Control Room (MCR) , and verified to perform their active function (transfer closed) by MCR indication and locally at each component. Reference 1 confi rmed that the remotely operated valves identified in Attachment A as having DAS control perform the active function identified in Attachment A after receiving a signal from DAS.

Reference 1 is available for NRC inspection as part of the ITAAC 2.2.01 .1 0c Completion Package (Reference 2) .

ITAAC Finding Review In accordance with plant procedures for ITAAC completion , Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant ITAAC findings associated with this ITAAC . The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.2.01 .10c (Reference 2) and is available for NRC review.

IT AAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.2.01 .10c was performed for VEGP Unit 3 and that the prescribed acceptance criteria was met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-22-0310 Enclosure Page 3 of 4 References (available for NRC inspection)

1. SV3-CNS-ITR-800113, Unit 3 Diverse Actuation System Control of Remotely Operated Containment System Isolation Valves: ITAAC 2.2.01 .10c, Rev O
2. 2.2.01 .10c-U3-CP-Rev0 , ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-22-031 O Enclosure Page 4 of 4 Attachment A

  • Excerpt from COL Appendix C Table 2.2.1-1
  • Tag No. *Equipment Name *Active Function Containment Purge Inlet VFS-PL-V003 Transfer Closed Containment Isolation Valve - ORC Containment Purge Inlet VFS-PL-V004 Transfer Closed Containment Isolation Valve - IRC Containment Purge Discharge VFS-PL-V009 Transfer Closed Containment Isolation Valve - IRC Containment Purge Discharge VFS-PL-V01 O Transfer Closed Containment Isolation Valve - ORC Sump Discharge WLS-PL-V055 Transfer Closed Containment Isolation Valve - IRC Sump Discharge WLS-PL-V057 Transfer Closed Containment Isolation Valve - ORC