ND-22-0245, ITAAC Closure Notification on Completion of 2.5.04.03 (Index Number 560)

From kanterella
(Redirected from ND-22-0245)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of 2.5.04.03 (Index Number 560)
ML22091A300
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/01/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0245
Download: ML22091A300 (6)


Text

Michael J. Yox 7825 River Road tk. Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtie 3 & 4 706-848-6459 tel APR 0 1 2022

Docket No.: 52-025 ND-22-0245 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.5.04.03 [Index Number 5601

Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtie Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.5.04.03 [Index Number 560].

This ITAAC confirms the as-built Data Display and Processing System (DDS) does display the bypassed and operable status of the Protection and Safety Monitoring System (PMS). The closure process for this ITAAC is based on guidance in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) request NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli A. Roberts at 706-848-6991.

Respectfully submitted,

Michael J. Yox Regulatory Affairs Director Vogtie 3 & 4

Enclosure:

Vogtie Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.5.04.03 [Index Number 560]

MJY/DLW/sfr U.S. Nuclear Regulatory Commission ND-22-0245 Enclosure Page 2 of 3

To:

Southern Nuclear Operating Company/Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. McCurry Mr. J. Parent Mr. B. Griman Mr. V. Hall U.S. Nuclear Regulatory Commission ND-22-0245 Enclosure Page 3 of 3

Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

Dalton Utilities Mr. T. Bundros

Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Ms. S.L. ZwackMr. Z. S. Harper

Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham U.S. Nuclear Regulatory Commission ND-22-0245 Enclosure Page 1 of 3

Southern Nuclear Operating Company ND-22-0245 Enclosure

Vogtie Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.5.04.03 [Index Number 560]

U.S. Nuclear Regulatory Commission ND-22-0245 Enclosure Page 2 of 3

ITAAC Statement Design Commitment:

3. The DDS provides information pertinent to the status of the protection and safety monitoring system.

Inspections, Tests. Analyses:

Tests of the as-built system will be performed.

Acceptance Criteria:

The as-built system provides displays of the bypassed and operable status of the protection and safety monitoring system.

ITAAC Determination Basis

Testing of the as-built Data Display and Processing System (DDS) was performed to verify the DDS provides information pertinent to the status of the protection and safety monitoring system (PMS). SV3-DDS-ITR-800560 (Reference 1) confirmed that the as-built DDS provides display of the bypassed and operable status of the PMS.

The test of the as-built system was performed and the results documented in Reference 1. This test navigates to the DDS bypassed and inoperable status nuclear application and visually confirmed that the as-built DDS provides PMS bypassed and operable status of Reactor Trip, Engineered Safety Feature Actuation System, and Post-Accident Monitoring System instrumentation indication from the Main Control Room.

Results of the test is documented in Reference 1 and confirmed that the as-built DDS provides displays of the bypassed and operable status of the PMS.

Reference 1 is available for NRC inspection as part of Unit 3 ITAAC 2.5.04.03 Completion Packages (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant findings associated with this ITAAC. The review is documented in the ITAAC Completion Package (Reference 2) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-22-0245 Enclosure Page 3 of 3

ITAAC Completion Statement Based on the above Information, SNC hereby notifies the NRC that ITAAC 2.5.04.03 was performed for VEGP Unit 3 and the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition, in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-DDS-ITR-800560, Rev 0, Unit 3 Test Results of DDS displays Bypass/Operable Status of PMS: ITAAC 2.5.04.03 NRC Index Number: 560
2. 2.5.04.03-U3-CP-Rev0, ITAAC Completion Package