ND-22-0187, ITAAC Closure Notification on Completion of ITAAC 2.2.02.07f.i (Index Number 145)

From kanterella
(Redirected from ND-22-0187)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 2.2.02.07f.i (Index Number 145)
ML22073A218
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/14/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0187
Download: ML22073A218 (7)


Text

3/4. Southern Nuclear Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tel Docket No.: 52-025 MAR* 1 4 2022 ND-22-0187 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.2.02.0?f.i (Index Number 1451 Ladies and Gentlemen :

In accordance with 10 CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.2.02.0?f.i (Index Number 1451. This ITAAC verified that the Passive Containment Cooling Water Storage Tank (PCCWST) provided water to the Spent Fuel Pool (SFP) and the Passive Containment Cooling Ancillary Water Storage Tank (PCCAWST) provided water to the SFP and the PCCWST. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52", which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted, fJJ/~~

Michael J. Yax Regulatory Affairs Dj ector Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.02.0?f.i (Index Number 1451 MJY/DLW/sfr

U.S. Nuclear Regulatory Commission ND-22-0187 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND .LI.L06 File AR.01 .02.06 Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0187 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Mr. J. L. Coward Other Mr. S. W . Kline , Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0187 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0187 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.02.07f.i [Index Number 145]

U.S. Nuclear Regulatory Commission ND-22-0187 Enclosure Page 2 of 4 IT AAC Statement Design Commitment 7.f) The PCS provides a flow path for long-term water makeup from the PCCWST to the spent fuel pool.

8.b) The PCS delivers water from the PCCAWST to the PCCWST and spent fuel pool simultaneously.

Inspections/Tests/Analyses i) Testing will be performed to measure the delivery rate from the PCCWST to the spent fuel pool.

Testing will be performed to measure the delivery rate from the PCCAWST to the PCCWST and spent fuel pool simultaneously.

Acceptance Criteria i) With the PCCWST water level at 27.4 ft+ 0.2, - 0.0 ft above the bottom of the tank, the flow path from the PCCWST to the spent fuel pool delivers greater than or equal to 118 gpm.

With PCCAWST aligned to the suction of the recirculation pumps, each pump delivers greater than or equal to 100 gpm to the PCCWST and 35 gpm to the spent fuel pool simultaneously when each pump is tested separately.

IT AAC Determination Basis Multiple ITAAC are performed to verify that the Passive Containment Cooling System (PCS) provides a flow path for long-term water makeup from the Passive Containment Cooling Water Storage Tank (PCCWST) to the spent fuel pool (SFP) and that the PCS delivers water from the Passive Containment Cooling Ancillary Water Storage Tank (PCCAWST) to the PCCWST and spent fuel pool simultaneously. Testing is performed to measure the delivery rate from the PCCWST to the spent fuel pool and the delivery rate from the PCCAWST, aligned to the recirculation pumps, to the PCCWST and spent fuel pool simultaneously.

i) With the PCCWST water level at 27.4 ft+ 0.2, - 0.0 ft above the bottom of the tank, the flow path from the PCCWST to the spent fuel pool delivers greater than or equal to 118 gpm.

Testing was performed as documented in Reference 1 to verify that the flow path from the PCCWST to the spent fuel pool delivered greater than or equal to 118 gpm with the PCCWST water level at 27.4 ft+ 0.2, - 0.0 ft above the bottom of the tank. The delivery rate from the PCCWST to the spent fuel pool was measured with the PCCWST aligned to the SFP emergency makeup line. The Unit 3 PCCWST provided 194 gpm which demonstrated with the PCCWST water level at 27.4 ft+ 0.2, - 0.0 ft above the bottom of the tank, the flow path from the PCCWST to the spent fuel pool delivers greater than or equal to 118 gpm.

U.S . Nuclear Regulatory Commission ND-22-0187 Enclosure Page 3 of 4 With PCCAWST aligned to the suction of the recirculation pumps, each pump delivers greater than or equal to 100 gpm to the PCCWST and 35 gpm to the spent fuel pool simultaneously when each pump is tested separately.

Testing was performed as documented in Reference 1 to verify that with PCCAWST aligned to the suction of the recirculation pumps, each pump delivered greater than or equal to 100 gpm to the PCCWST and 35 gpm to the spent fuel pool simultaneously when each pump was tested separately. The delivery rate from the PCCAWST to the PCCWST and SFP was measured simultaneously with the B recirculation pump aligned to provide flow to the PCCWST and the SFP emergency makeup line. The flow to the PCCWST and to the SFP was measured, and the testing was repeated again with the PCCAWST aligned to the suction of the A recirculation pump. Each pump was tested separately, and measurements verify that Unit 3 pump A delivered 103 gpm to the PCCWST flow path while simultaneously delivering 35.7 gpm to the SFP. The Unit 3 pump B delivered 102 gpm to the PCCWST flow path while simultaneously delivering 36 gpm to the SFP flow path . The results of the testing confirmed that with the PCCAWST aligned to the suction of the recirculation pumps, each pump delivered greater than or equal to 100 gpm to the PCCWST flow path while simultaneously delivering 35 gpm to the SFP when each pump was tested separately, which meets the acceptance criteria .

The completed test results documented in Reference 1, confirm that with the PCCWST water level at 27.4 ft+ 0.2, - 0.0 ft above the bottom of the tank, the flow path from the PCCWST to the spent fuel pool delivered greater than or equal to 118 gpm and that with the PCCAWST aligned to the suction of the recirculation pumps, each pump delivered greater than or equal to 100 gpm to the PCCWST and 35 gpm to the spent fuel pool simultaneously when each pump was tested separately.

Reference 1 is available for NRC inspection as well as Unit 3 ITAAC Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.2.02.07f.i (Reference 2) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.2.02.07f.i was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-22-0187 Enclosure Page 4 of 4 References (available for NRC inspection)

1. SV3-SFS-ITR-800145, Rev. 0, "Unit 3 Passive Containment Cooling System (PCS) Makeup Flow to SFP: ITAAC 2.2.02.0?f.i , Item 7.f.i) and 8.b) NRC Number: 145"
2. 2.2.02.07f.i-U3-CP-Rev0, ITAAC Completion Package