ND-22-0164, ITAAC Closure Notification on Completion of ITAAC 2.3.09.02a (Index Number 421)

From kanterella
(Redirected from ND-22-0164)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 2.3.09.02a (Index Number 421)
ML22066B011
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/07/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0164
Download: ML22066B011 (7)


Text

Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesbo ro, GA 30830

._ Southern Nuclear Vogtle 3 & 4 706-848-6459 tel MAR 0*7 2022 Docket No.: 52-025 ND-22-0164 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.3.09.02a (Index Number 4211 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.09.02a (Index Number 4211. This ITAAC confirms that the hydrogen monitors identified in Table 2.3.9-1 are powered by the non-Class 1Ede and UPS System .

The closure process for this ITAAC is based on the guidance described in NEl-08-01 , "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52" which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991 .

Respectfully submitted ,

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.09.02a (Index Number 4211 MJY/MSV/sfr

U.S. Nuclear Regulatory Commission ND-22-0164 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. M. D. Meier Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE : VND.LI.L06 File AR.01.02 .06 Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0 . Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0164 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Mr. J. L. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr. , Ph .D. , GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton , Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0164 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0164 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.3.09.02a [Index Number 421]

U.S. Nuclear Regulatory Com mission ND-22-0164 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 2.a) The hydrogen monitors identified in Table 2.3.9-1 are powe red by the non-Class 1E de and UPS system .

Inspections, Tests, Analyses Testing will be performed by providing a simulated test signal in each power group of the non-Class 1Ede and UPS system.

Acceptance Criteria A simulated test signal exists at the hydrogen monitors identified in Table 2.3.9-1 when the non-Class 1E de and UPS system is provided the test signal.

ITAAC Determinati on Basis Testing is performed on the hydrogen monitors identified in the VEGP Unit 3 COL Appendix C Table 2.3.9-1 (Attachment A) to demonstrate they are powe red from the non-Class 1Ede and Uninterruptible Powe r Supply (UPS) system (EDS). This ITAAC performs testing on the hydrogen monitors identified in Attachment A by providing a simulated test signal in the EDS supplying power to the hydrogen monitors.

The Unit 3 component test work orders identified in Reference 1 document completion of power verification ar:tivi ties fr0r.-, thP. !=:OS uninterruptihle power supply (U PS) distrib ution p;:inel to the hydrogen monitors identified in Attachment A. Reference 1 first verifies that power supply cables/wiring are installed and terminated from the applicable EDS UPS power distribution panels to the hydrogen monitors identified in Attachment A using approved construction drawings and cable/wiring termination documentation. Reference 1 then confirms , via cable/wi ring termination inspection documentation, that continuity testing was performed on each of the installed cables/wiring to confirm current flow within the installed cable/wiring. The combination of cable/wiring instal lation and termination verification , with the installed cable/wiring continuity testing , confirms that the hydrogen monitors identified in Attachment A are powered by their respective EDS power supply.

The Unit 3 component test package work orders documented in Reference 1 confirm that a simulated test signal exists at the hydrogen monitors identified in Table 2.3.9-1 when the EDS is provided the test signal.

Reference 1 is availabl e for NRC inspection, as well as the Unit 3 ITAAC 2.3.09.02a Completion Package (Reference 2) .

ITAAC Findi ng Review In accordance with plant proced ures for ITAAC completion , Southern Nuclear Operating Company (SNC) pe rformed a review of all lTAAC findings and associated corrective actions.

This review found no relevant ITAAC findings associated with this ITAAC.

U.S. Nuclear Regulatory Commission ND-22-0164 Enclosure Page 3 of 4 ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3 .09.02a was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-VLS-ITR-800421 Rev 0, "Unit 3 VLS Hydrogen Monitors Signaled from each Power Group"
2. 2.3.09.02a-U3-CP-Rev0 , ITAAC Completion Package"

U.S. Nuclear Regulatory Commission ND-22-0164 Enclosure Page 4 of 4 Attachment A COL Appendix C Table 2.3.9-1 Table 2.3.9-1 I I Equipment Tag No. Display I I Containment Hydrogen Monitor YLS-001 Yes Containment 1--lydrngcn Monitor VLS-00~ Yes Containment Hydrogen Monitor YLS-003 Yes