UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 194061415 August 28, 2025 Bob Coffey Executive Vice President, Nuclear Division and Chief Nuclear Officer NextEra Energy, Inc.

700 Universe Blvd.

Mail Stop: EX/JB Juno Beach, FL 33408

SUBJECT:

UPDATED INSPECTION PLAN FOR SEABROOK STATION (REPORT 05000443/2025005)

Dear Bob Coffey:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Seabrook Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY 0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

B. Coffey 2

Please contact me at (610) 337-5205 with any questions you have regarding this letter.

Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety Docket No. 05000443 License No. NPF-86

Enclosure:

Seabrook Station Inspection Plan cc w/encl: Distribution via ListServ MATTHEW YOUNG Digitally signed by MATTHEW YOUNG Date: 2025.08.28 08:16:48 -04'00'

ML25238A089 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS NAME NMentzer MYoung DATE 8/26/2025 8/26/2025

Site Inspection Activity Plan 07200063 - NEXTERA Energy (ISFSI) 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Sec - ISFSI Inspection - SBK 1

7/20/2026 7/24/2026 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 8/19/2025 9:56:26 AM 1 of 3

Site Inspection Activity Plan Seabrook 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count RP - 71124.08 - Waste & Transportation - Seabrook 1

1 6/9/2025 7/11/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls EP Program Inspection - Seabrook 1

1 8/18/2025 8/22/2025 IP 71114.02 000717 Alert and Notification System Testing 1

8/18/2025 8/22/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1

8/18/2025 8/22/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1

8/18/2025 8/22/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1

8/18/2025 8/22/2025 IP 71151 001397 Performance Indicator Verification Commercial Grade Dedication - Seabrook 3

1 9/15/2025 9/19/2025 IP 71111.21N.03 001808 Commercial Grade Dedication 1

9/29/2025 10/3/2025 IP 71111.21N.03 001808 Commercial Grade Dedication RP - 71124.06 - RETS - Seabrook 1

1 9/15/2025 9/19/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 2025 Seabrook Initial Operator Licensing Exam 4

1 9/22/2025 9/26/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 1 10/19/2025 10/25/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP - 71124.05 - Instrumentation - Seabrook 1

1 10/20/2025 10/24/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation SB Requal Inspection with P/F Results 2

1 12/1/2025 12/5/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1

12/1/2025 12/5/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP - 71151 - PIV - Seabrook 1

1 12/1/2025 12/5/2025 IP 71151 000746 Performance Indicator Verification Inservice Inspection - Seabrook 1

1 4/6/2026 4/17/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP - 71124.03 & 71124.04 - Airborne & Occupational - Seabrook 1

1 4/13/2026 4/17/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1

4/13/2026 4/17/2026 IP 71124.04 000728 Occupational Dose Assessment RP - 71124.07 - REMP - Seabrook 1

1 6/8/2026 6/12/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program RP - 71124.01 - Rad Hazards - Seabrook 1

1 7/13/2026 7/17/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Prepared on 8/19/2025 9:56:26 AM 2 of 3

Site Inspection Activity Plan Sec - Access Control, Equipment Testing & Maintenance, Training, SPR, PI Verification, ISFSI - SB 3

1 7/20/2026 7/24/2026 IP 71130.02 000734 Access Control 1

7/20/2026 7/24/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1

7/20/2026 7/24/2026 IP 71130.07 000739 Security Training 1

7/20/2026 7/24/2026 IP 71130.09 001656 Security Plan Changes 1

7/20/2026 7/24/2026 IP 71151 001338 Performance Indicator Verification 1

7/20/2026 7/24/2026 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations PI&R Biennial Team Inspection - Seabrook 4

1 8/10/2026 8/14/2026 IP 71152B 000747 Problem Identification and Resolution 1

8/24/2026 8/28/2026 IP 71152B 000747 Problem Identification and Resolution FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - SB 4

1 8/31/2026 9/4/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1

9/28/2026 10/2/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EP Exercise Inspection - Seabrook 5

1 9/21/2026 9/25/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1

9/21/2026 9/25/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1

9/21/2026 9/25/2026 IP 71151 001397 Performance Indicator Verification Comprehensive Engineering Team Inspection - Seabrook 7

1 11/2/2026 11/6/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1

11/16/2026 11/20/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection RP - 71151 - PIV - Seabrook 1

1 11/16/2026 11/20/2026 IP 71151 000746 Performance Indicator Verification RP - 71124.08 - Rad Waste - Seabrook 1

1 3/22/2027 3/26/2027 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Material Control and Accounting 1

1 4/19/2027 4/23/2027 IP 71130.11 000742 Material Control and Accounting (MC&A)

Prepared on 8/19/2025 9:56:26 AM 3 of 3