November 26, 2025

SUBJECT:

SEABROOK STATION - COMMERCIAL GRADE DEDICATION INSPECTION REPORT 05000443/2025010

Dear Bob Coffey:

On November 20, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Seabrook Station and discussed the results of this inspection with Christina Sheridan, Organizational Effectiveness Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000443 License No. NPF-86

Enclosure:

As stated

Inspection Report

Docket Number:

05000443

License Number:

NPF-86

Report Number:

05000443/2025010

Enterprise Identifier: I-2025-010-0025

Licensee:

NextEra Energy Seabrook, LLC

Facility:

Seabrook Station

Location:

Seabrook, New Hampshire

Inspection Dates:

September 15, 2025 to November 20, 2025

Inspectors:

L. Cline, Senior Resident Inspector

P. Cataldo, Senior Reactor Inspector

D. McHugh, Reactor Inspector

Approved By:

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a commercial grade dedication inspection at Seabrook Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication

(1) Thermal overload heater element for safety-related motor-operated valves (Purchase Order (PO)# 02399390, Catalogue identification (CID)# 7749-2, Commercial Grade (CG))
(2) Fuse, 2-amp for safety-related motor control center breakers (PO# 02414447, CID#

34069-2, CG)

(3) Aluminum electrolytic capacitor, 7400 µF, 200 Vdc for class 1E battery chargers (PO#

02419685, CID# 14370-2, CG)

(4) Undervoltage relay, 27N, 125 Vdc input, 70 to 120 Vac range for 4.16 kV degraded voltage protection (PO# 02422657, CID# 38553-2, CG)
(5) Breaker, 3-pole, 30-amp, 600 Vac, 250 Vdc for 480 Vac safety-related uninterruptible power supply (PO# 02416646, CID# 1745283-2, CG)
(6) Check valve, 0.25-inch, ball for diesel generator starting air (PO# 02454275, CID#

71047-2, CG)

(7) Power pill for diesel generator lube oil temperature control valve (PO# 02441705, CID# 286098-2, CG)
(8) Bearing, C-4, heat stabilized, 90 mm inner diameter and 190 mm outer diameter for service water cooling tower fans (PO# 02285681, CID# 420743-2, CG)
(9) Coupling shaft for service water cooling tower fans (PO# 02431880, CID# 1841789-2, CG)
(10) Pump discharge head modified by addition of AL6XN flange for cooling tower service water pump (PO# 02125770, CID# 422662, Safety Related Procurement)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 20, 2025, the inspectors presented the commercial grade dedication inspection results to Christina Sheridan, Organizational Effectiveness Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.03 Corrective Action

Documents

AR 02520027

Seabrook Unit 2 Material Process

09/18/2025

MPM 6.10

Obtaining Unit 2 Materials: Retags, Transfers and Issues

05/03/2008

NCR 07-010

Unit #2 Building storage and ASME NQA-1 1994 Sub art

2.2 Section 6 (Storage) requirements

05/29/2008

Corrective Action

Documents

Resulting from

Inspection

AR 2523677 AR 2523844 AR 2523793 AR 2523761 AR

23930 AR 2524572 AR 2528732 AR 2528733

Procedures

NSC-PP-025

Integrated Supply Chain-Technical Services Technical

Evaluation Process for Commercial Grade Dedication

5A

QI-04-NSC-1

Procurement Control

QI-04-NSC-9

Procurement Engineering Control

2A

QI-07-NSC-1

Warehouse Receipt, Storage, Issuance, and Maintenance

QI-07-NSC-2

Receipt Inspection of Safety Related and Quality Related

Material

QI-07-NSC-3

Integrated Supply Chain-Technical Services Facility

9A

QI-4-NSC-11

Obtaining Seabrook Unit 2 Materials

QI-4-NSC-11

Immediate Procedure ChangeQI-4-NSC-11 Obtaining

Seabrook Unit 2 Materials

10/01/2025

Self-

Assessments

AR 2520029

Level 1 Core Business Assessment Report - Seabrook

Unit 2 Retag Process

June and

July 2025