Cybersecurity Inspection Report 05000443/2025402 (Cover Letter Only)
ML25197A539
Person / Time
Site: Seabrook 
Issue date: 07/16/2025
From: Glenn Dentel
Division of Operating Reactors
To: Coffey B
NextEra Energy
References
IR 2025402
Download: ML25197A539 (1)


Text

July 16, 2025

SUBJECT:

SEABROOK STATION - CYBERSECURITY INSPECTION REPORT 05000443/2025402

Dear Bob Coffey:

On June 13, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Seabrook Station and discussed the results of this inspection with Chris Robinson, Operations Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Seabrook Station.

The following cross-cutting aspect was assigned to a finding using Inspection Manual Chapter 0310, Aspects Within Cross Cutting Areas: [P.3] - Resolution.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Seabrook Station. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Docket No. 05000443 License No. NPF-86

Enclosure:

As stated

cc w/o encl: Distribution via ListServ

cc w/ encl:

D. Bryant, Assistant Director for Planning and Preparedness, MEMA D. Vaillancourt, Chief, Field Services, NH Department of Safety B. Fielding, Manager Site Security J. Griffin, Security Operations Supervisor

GLENN DENTEL Digitally signed by GLENN DENTEL Date: 2025.07.16 13:55:33 -04'00'

ML25197A545 (Cover letter w/ enclosure(s))

ADAMS ACCESSION NUMBER: ML25197A539 (Cover letter)

Entire Report:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS

NAME LDumont GDentel

DATE 7/15/2025 7/16/2025