ML25223A265
| ML25223A265 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/11/2025 |
| From: | Greg Warnick NRC/RGN-IV/DORS/EB2 |
| To: | Sullivan J Entergy Operations |
| References | |
| IR 2025401 | |
| Download: ML25223A265 (1) | |
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION August 08, 2025 Joseph Sullivan, Site Vice President Entergy Operations, Inc 17265 River Rd Killona, LA 70057
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - CYBERSECURITY INSPECTION REPORT 05000382/2025401
Dear Joseph Sullivan:
On July 10, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed a cybersecurity inspection at Waterford Steam Electric Station, Unit 3 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
Two findings of very low security significance (Green) are documented in this report. Two of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations consistent with Section 2.3.2 of the Enforcement Policy.
Licensee-identified violations that are determined to be of very low security significance are documented in this report. We are treating these violations as non-cited violations consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Waterford Steam Electric Station, Unit 3.
The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.8] - Procedure Adherence.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director,
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION J. Sullivan 2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Waterford Steam Electric Station, Unit 3.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Gregory G. Warnick, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000382 License No. NPF-38
Enclosure:
As stated cc w/o encl: Distribution via LISTSERV Signed by Warnick, Gregory on 08/08/25
ML25213A018 (Cover letter w/ enclosure(s))
ADAMS ACCESSION NUMBER: ML25223A265 (Cover letter)
Entire Report:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only:
SUNSI Review: GAP Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE SRI:DORS/EB2 RI:DORS/EB2 BC:DORS/EB2 NAME GPick ASaunders GWarnick SIGNATURE
/RA/
/RA/
/RA/
DATE 08/01/25 08/04/25 08/08/25