Letter Sequence Other |
|---|
CAC:000955, (Open) EPID:000955, NIST Center for Neutron Research Test Reactor - Request for Changes to Technical Specifications to Allow Low Power Testing (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement
Results
Other: ML17292A062, ML22028A002, ML22039A226, ML22040A338, ML22089A166, ML22143B016, ML22286A167, ML23093A027, ML23290A030, ML23353A069, ML24284A171
|
MONTHYEARML17068A1632017-03-0202 March 2017 NIST Center for Neutron Research Test Reactor - Request for Changes to Technical Specifications to Allow Low Power Testing Project stage: Request ML17068A1642017-03-0202 March 2017 NIST Center for Neutron Research - Statement of No Significant Hazard Resulting from License Amendment Request Dated 03/02/2017 Project stage: Request ML17097A2432017-03-29029 March 2017 Marked-up Version of the License Amendment Request of the Nbsr Technical Specifications Project stage: Request ML17153A1722017-05-25025 May 2017 NIST - Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17277B2612017-10-24024 October 2017 Aerotest Radiography and Research Reactor, Request for Additional Information Regarding the Renewal of Facility Operating License No. R-98 Project stage: RAI ML17318A6952017-11-16016 November 2017 National Institute of Standards and Technology, Request for Additional Information of License Amendment Request for the Renewed Facility License No. TR-5 for the National Bureau of Standards Test Reactor (CAC No. 000955) Project stage: RAI ML17324A4412017-11-17017 November 2017 Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17328A5042017-11-20020 November 2017 Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17335A3692017-12-0101 December 2017 Supplemental Information National Institute of Standards and Technology Request for Additional Information of License Amendment Request for the Renewed Facility License No. R-5 for the National Bureau of Standards Test Reactor Project stage: Supplement ML17292A0622017-12-15015 December 2017 National Institute of Standards and Technology, Amendment No. 11 to the Renewed Facility License No. TR-5 for the National Bureau of Standards Reactor (CAC No. 000955) Project stage: Other ML17363A3032017-12-20020 December 2017 Submittal of Response to Request to Supplement the License Renewal Application Project stage: Supplement ML18010A5622018-02-0202 February 2018 Aerotest Radiography and Research Reactor - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18054A2022018-02-21021 February 2018 Response to Request for Holding Information from Public Disclosure Project stage: Request ML18066A0752018-02-28028 February 2018 Submittal of Response to Request for Holding Information from Public Disclosure Project stage: Request ML18066A0802018-02-28028 February 2018 Submittal of Response to Request for Holding Information from Public Disclosure Project stage: Request ML18093A3852018-03-29029 March 2018 Clarification of TS 6.6 Project stage: Request ML18088A7532018-03-29029 March 2018 Draft Request for Additional Information for License Renewal of the Aerotest Radiography and Research Reactor Project stage: Request ML18074A1112018-04-0202 April 2018 Request for Withholding Information from Public Disclosure Response to Request to Aerotest Operations, Inc. to Supplement the License Renewal Application Project stage: Withholding Request Acceptance ML18088A7012018-04-24024 April 2018 Request for Additional Information Regarding the Renewal of Facility Operating License No. R-98 Project stage: RAI ML18127A0752018-04-30030 April 2018 Elimination of Technical Specification 6.6 Project stage: Request ML18127B7032018-06-0808 June 2018 Review of the Restart Plan for the Aerotest Radiography and Research Reactor Project stage: Approval ML18201A1972018-07-17017 July 2018 Request for Additional Time Project stage: Request ML18198A4512018-07-23023 July 2018 Response to Request for Extension of Time to Respond to Request for Additional Information Regarding the Renewal of Facility Operating License No. R-98 Project stage: RAI ML18257A0752018-09-11011 September 2018 Request for Additional Time Beyond the Deadline to Answer Questions Project stage: Request ML18260A0452018-09-18018 September 2018 Response to Second Request for Extension of Time to Respond to Request for Additional Information Regarding the Renewal of Facility Operating License No. R-98 Project stage: RAI ML18277A2962018-10-15015 October 2018 Request for Additional Information Regarding the Operator Requalification Program for the Aerotest Radiography and Research Reactor Project stage: RAI ML18303A2912018-10-24024 October 2018 Aerotest Radiography and Research Reactor Response to RAI-ORP-7 Project stage: Request ML19015A3322019-01-25025 January 2019 Requests for Renewal of Facility Operating License No. R-98, Review of the Restart Plan, and Amendment to Technical Specification 6.6 for the Aerotest Radiography and Research Reactor Project stage: Approval ML21272A3762021-09-29029 September 2021 Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes) Project stage: Request ML21306A1322021-10-31031 October 2021 Kairos Power LLC Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes) Project stage: Request ML21319A3542021-11-29029 November 2021 Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC Project stage: Acceptance Review ML22024A4922022-01-10010 January 2022 Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 Project stage: Request ML22028A0022022-02-0202 February 2022 Kairos Hermes Environmental Audit Plan Project stage: Other ML22041A3372022-02-0303 February 2022 Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report Project stage: Request ML21364A0132022-02-0808 February 2022 Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor Project stage: Other ML22040A3382022-02-0909 February 2022 Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Other ML22040A3362022-02-0909 February 2022 Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Request ML21204A0392022-02-15015 February 2022 Federal Register Notice of Intent to Conduct Scoping and Prepare an EIS - Kairos Hermes CP Review Project stage: Request ML22039A2262022-02-17017 February 2022 Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 Project stage: Other ML21326A0592022-02-18018 February 2022 Kairos Hermes CP Review - Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement Project stage: Other ML22031A2892022-03-10010 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review Project stage: Request ML22091A0002022-03-23023 March 2022 Kairos Hermes Scoping Meeting Transcript Project stage: Request ML22089A1662022-04-0808 April 2022 Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) Project stage: Other ML22110A0182022-05-0505 May 2022 Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments Project stage: Request ML22143B0162022-05-27027 May 2022 Audit Plan for Hermes Site Characteristics PSAR Chapter 2 Project stage: Other ML22286A1672022-10-17017 October 2022 Atomic Alchemy Inc Preliminary Safety Analysis Report Pre-Submittal Audit Plan Project stage: Other ML22329A0112022-11-16016 November 2022 Deis Public Meeting Transcript for Kairos Hermes Construction Permit Application Project stage: Meeting ML22311A5532022-11-16016 November 2022 Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor Project stage: Request ML23031A1602023-03-21021 March 2023 Summary of Public Meeting for the Draft Environmental Impact Statement for the Kairos Hermes Test Reactor Construction Permit Application ML23031A1652023-03-21021 March 2023 Kairos Attendance List Project stage: Request 2018-07-23
[Table View] |
Text
1 General Information (Non-Proprietary)
Consistent with 10 CFR 50.33(a)-(e), (h), and (j); 10 CFR 50.34(a)(9); and 10 CFR 50.55(a), the following general application information is provided.
Name of Applicant This construction permit application for a test reactor is submitted by Kairos Power LLC. All references herein to "Kairos Power" or "Kairos," as an entity, refer to Kairos Power LLC.
Address of Applicant The headquarters for Kairos Power LLC is located at 707 W. Tower Ave., Suite A, Alameda, CA 94501.
Description of Business Kairos Power is a mission-driven engineering company focused on the delivery of clean, affordable, and safe energy solutions through the integrated design, licensing, and demonstration of advanced reactor technology. Kairos Power LLC is developing and marketing nuclear power plant designs based on the Kairos Power fluoride salt-cooled, high temperature reactor (KP-FHR) technology. The KP-FHR is a novel advanced reactor technology that leverages TRISO fuel in pebble form combined with a low-pressure fluoride-lithium-beryllium (Flibe) salt coolant.
Company Description Kairos Power LLC is the applicant for the construction permit and subsequent operating license for a two-unit test reactor and will own and operate the facility to be located in Oak Ridge, Tennessee in the East Tennessee Technology Park (ETTP).
Additional information regarding Kairos Power LLC is provided in Enclosure 4 to this letter and in Chapter 15 of the Safety Analysis Report.
License Type This application is for a construction permit for a utilization facility under 10 CFR 50. Kairos Power expects to apply for a future Class 104c operating license pursuant to 10 CFR 50.21(c) (for testing, research, and development activities), as well as future licenses for receipt, possession, and use of source material under 10 CFR 40, byproduct material under 10 CFR 30, and special nuclear material under 10 CFR 70. Kairos Power projects a 11-year operating period for each of the two test reactors.
Construction Schedule Kairos Power LLC is requesting NRC review and approval of the construction permit application by April 2025 to support construction of safety-related structures, systems, and components.
The earliest start date for construction is expected to be July 2025; the earliest projected date for completion of construction for the first unit is July 2027, and the latest projected date for completion of the first unit is December 2027. The completion of construction for the second unit is expected to be one year after the first unit.
NRC Staff Exhibit NRC-002B
2 General Information (continued)
Restricted Data or Other Defense Information This construction permit application does not include any Restricted Data or other defense information requiring separation from the remainder of the application in accordance with 10 CFR 50.33(j). Kairos Power will not permit any individual to have access to any facility to possess Restricted Data or classified National Security Information until the individual and/or facility has been approved for access under the provisions of 10 CFR Parts 25 and/or 95.
Technical Qualifications Kairos Power LLC was formed in 2016. At the time of submittal of the Hermes 2 Preliminary Safety Analysis Report, Kairos Power has approximately 350 employees withthe majority having scientific and engineering backgrounds including disciplines such as nuclear, mechanical, electrical, chemical, industrial, materials, and thermal hydraulics. These scientists and engineers have backgrounds in engineering, operations, maintenance, licensing, and testing, with many having experience at national laboratories, utility nuclear plants, nuclear development vendors, and academia. Kairos Power has also drawn resources from other industries outside of nuclear power to provide diversity of ideas and approaches. Of the employees with scientific or engineering backgrounds, more than half have advanced degrees.
Kairos Power has a developed a robust testing program and is implementing a design-test-build approach to enhance the design process and confirm aspects of the design. This is an iterative process that provides learning at each stage of the design evolution and enhances the quality of the final design.
Kairos Power is also developing fabrication and construction experience as part of the design-test-build approach. This includes experience from several laboratory facilities as well as the Kairos Power Engineering Testing Unit, a non-nuclear facility that demonstrates the capability to design, fabricate, and construct an operational facility using molten fluoride coolant.
Kairos Power has also requested a construction permit for a separate non-power test reactor (Hermes).
That application has been recommended for approval by the Advisory Committee on Reactor Safeguards and NRC staff have completed and issued their final safety evaluation report. Kairos Power has engaged in pre-application interactions with the NRC staff for several years on the fluoride salt-cooled, high temperature reactor (KP-FHR) technology. These interactions have included numerous technical and topical reports, and all topical report submittals have resulted in NRC approved safety evaluations. Pre-application engagement and review of the Hermes application have also included numerous audits and discussions focusing on detailed technical topics supporting both the Hermes design and the future KP-FHR commercial design, including several interactions with the Advisory Committee on Reactor Safeguards.
This information demonstrates Kairos Powers technical qualifications to engage in the activities discussed in this application in accordance with NRC regulations, pursuant to 10 CFR 50.34(a)(9).