Letter Sequence Response to RAI |
---|
EPID:L-2022-LLA-0140, Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML22046A0742022-02-14014 February 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure Project stage: Request PMNS20220709, Meeting Between NRC Staff and Constellation Energy Generation, LLC on the Review of the Defense-in-Depth and Diversity Coping Analysis Supporting the Digital Upgrade of Instrumentation and Controls at Limerick Generating Station, Units2022-07-22022 July 2022 Meeting Between NRC Staff and Constellation Energy Generation, LLC on the Review of the Defense-in-Depth and Diversity Coping Analysis Supporting the Digital Upgrade of Instrumentation and Controls at Limerick Generating Station, Units 1 an Project stage: Request ML22224A1492022-08-15015 August 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital Project stage: Request ML23009A5622022-11-0707 November 2022, 14 November 2022, 11 January 2023 Summary of December 15, 2022 Public Meeting on Limeric Digital I&C LAR Acceptance Project stage: Request PMNS20221157, Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request2022-11-0707 November 2022 Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML22340A2172022-11-10010 November 2022, 21 November 2022, 6 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Request ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staffs Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, LLCs Presentation for November 10, 2022 Public Meeting with NRC Project stage: Request ML22320A1132022-11-21021 November 2022 Generation Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests Project stage: Acceptance Review ML22333A8172022-11-29029 November 2022 Response to Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests for the Limerick Generating Station Project stage: Supplement ML22327A0192022-12-0606 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Acceptance Review ML22339A0642022-12-0909 December 2022 Generation Station, Unit Nos. 1 and 2 – Acceptance of Requested Licensing Action Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Acceptance Review ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request Project stage: Meeting ML23003A1702022-12-15015 December 2022 Official Transcript of the 12/15/22 Meeting with Constellation Energy to Discuss the Exceptions Described for the Independence and Operating Bypass with IEEE 603 of the Proposed Plant Protection System in the Limerick Station, Units 1 and 2 Project stage: Meeting ML23009A5872023-01-11011 January 2023 Summary of December 15, 2022, Meeting with Constellation Energy Generation, LLC on Potential Compliance with Certain Clauses of IEEE Standard 603-1991 in Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Meeting ML22353A6322023-01-17017 January 2023 Supplement to Regulatory Audit Plan in Support of Review of Digital I&C Upgrade to Protection Systems (EPID L-2022-LLA-0140) - Non-Proprietary Project stage: Other PMNS20230026, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-01-20020 January 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A1062023-01-20020 January 2023, 12 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23032A2442023-02-0606 February 2023 Regulatory Audit Plan for Review of Human Factors Engineering Portion of Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Other ML23039A1412023-02-0808 February 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)-Human Factors Engineering Project stage: Supplement ML23046A2662023-02-15015 February 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Supplement PMNS20230032, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-02-23023 February 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20230033, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-03-0606 March 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23121A0042023-03-0606 March 2023, 12 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23118A3792023-03-17017 March 2023, 9 June 2023 April 12, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request PMNS20230254, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-03-17017 March 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23089A3242023-03-30030 March 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Human Factors Engine Project stage: Supplement ML23095A2232023-04-0505 April 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Human Factors Project stage: Supplement PMNS20230423, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-04-17017 April 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23132A3092023-04-17017 April 2023, 18 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23076A1042023-05-12012 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A0132023-05-12012 May 2023 March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23121A0022023-05-12012 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23145A0672023-05-15015 May 2023, 31 May 2023 May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request PMNS20230627, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-05-15015 May 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20230606, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-05-16016 May 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23156A4172023-05-16016 May 2023, 9 June 2023 Summary of May 24, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23132A3082023-05-18018 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23143A3422023-05-23023 May 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Supplement ML23145A0352023-05-31031 May 2023 Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23118A3752023-06-0909 June 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . Project stage: Supplement PMNS20230846, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-07-18018 July 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Other 2023-02-23
[Table View] |
|
---|
Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with ML24078A2752024-03-18018 March 2024 Response to Requests for Additional Information (RAIs 5, 6, 7, and 8) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog ML24067A2942024-03-0707 March 2024 Response to Requests for Additional Information (RAI 4, RAI 1.c Revision) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related. ML24057A4272024-02-26026 February 2024 Response to Requests for Additional Information (RAIs 1, 2, and 3) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control LG-23-106, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML22182A4002022-06-30030 June 2022 Response to RAI, Application to Implement Alternate Defense-in-Depth Categorization Process, Alternate Pressure Boundary Categorization Process & Alternate Seismic Categorization Process RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments NMP2L2773, Company - Response to Request for Additional Information2021-06-30030 June 2021 Company - Response to Request for Additional Information JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting ML21091A0142021-04-0101 April 2021 Response to Request for Additional Information - Relief Request I4R-24 Associated with Residual Heat Removal Heat Exchanger Category C-A and C-B Examinations RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20178A5142020-06-26026 June 2020 TS Change and Relief Requests Related to Safety Relief Valve Testing - Response to Request for Additional Information ML20008D2032020-01-0707 January 2020 Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed ... NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 ML19239A0042019-08-27027 August 2019 Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF ML19224B7052019-08-12012 August 2019 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended... ML19224A0522019-08-0808 August 2019 (Lgs), Units 1 and 2 - Response to Requested Supplemental Information for a One Time Alternative Request Pertaining to Dry Shield Canisters Equipped with Boral Neutron Absorber Plates JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 ML19004A3742019-01-0404 January 2019 Relief Request I4R-18 Associated with Inaccessible Emergency Service Water and Residual Heat Removal Service Water Pump Supports RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements2018-11-29029 November 2018 Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements ML18305B2702018-11-0101 November 2018 Response to Request for Additional Information - License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML18113A8702018-04-23023 April 2018 Response to Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Plants ML18019A0912018-01-19019 January 2018 Response to Request for Additional Information, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Plants ML18017A3762018-01-17017 January 2018 End of Interval Relief Request Associated with the Third Ten-Year Lnservice Inspection (ISI) Interval ML17340A1972017-12-0606 December 2017 Response to Request for Additional Information: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML17226A3362017-08-14014 August 2017 Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML16263A2182016-09-19019 September 2016 Response to Request for Additional Information Regarding Proposed Relief Request I4R-01 ML16250A5492016-09-0606 September 2016 Snubber Program Document - 4th Interval - Basis for Snubber Program ML16250A5462016-09-0606 September 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Snubber Technical Specification Requirements ML16194A2302016-07-12012 July 2016 Response to Request for Additional Information Regarding Proposed Relief Request 14R-10 RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure ML16126A0172016-05-0404 May 2016 ACE Letter Requesting Responses Prior to Limerick Mtg 5-23-16 ML16110A3922016-04-19019 April 2016 Response to Draft Request for Additional Information Regarding Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 2024-09-12
[Table view] |
Text
200 Exelon Way Kennett Square, PA 19348 Constellation www.ConstellationEnergy.com
10 CFR 50.90
March 7, 2024
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Document Control Desk
Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Response to Requests for Additional Information (RAI 4, RAI 1.c Revision) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)
References:
- 1. Constellation Energy Generation, LLC (CEG) letter to the U.S. Nuclear Regulatory Commission (NRC), "License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)," dated September 26, 2022 (NRC Agencywide Documents Access and Management S ystem (ADAMS) Accession No. ML22269A5690).
- 2. Constellation Energy Generation, LLC (CEG) letter to the U.S. Nuclear Regulatory Commission (NRC), "License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)," dated September 12, 2023 (ADAMS Accession No. ML23255A095)
- 3. Email from Michael Marshall, U.S. Nuclear Regulatory Commission to Francis Mascitelli, Constellation Energy Generation, LLC, Limerick Generating Station, Units 1 and 2 - Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140), dated January 26, 2024, (ADAMS Accession No. ML24026A292)
- 4. Constellation Energy Generation, LLC (CEG) letter to the U.S. Nuclear Regulatory Commission (NRC), Response to Requests for Additional Information (RAIs 1, 2, and 3) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS), dated February 26, 2024 (ADAMS Accession No. ML24057A427)
Limerick DMP LAR RAI 4 and RAI 1.c Revision Response Docket Nos. 50-352 and 50-353 March 7, 2024 Page 2
In accordance with 10 CFR 50.90, Constellation Energy Generation, LLC (CEG) requested a License Amendment Request (LAR) to replace the Limerick Generating Station, Units 1 and 2 existing safety-related analog control systems with a single digital Plant Protection System (PPS) (Reference 1).
In Reference 2, CEG submitted a LAR supplement that replaced in its entirety the original license amendment request, dated September 26, 2022. CEG replaced the original submittal to address issues associated with proprietary/non-proprietary information.
In Reference 3, the NRC notified CEG that additional information is needed to complete its review of the Reference 2 submittal.
In Reference 4, CEG provided a response for RAIs 1, 2, and 3.
to this letter provides the response to request for additional information for RAI 4.
In addition, Attachment 2 contains a revision to the response to RAI 1.c provided in Reference 4. An additional terminology difference was discovered subsequent to the Reference 4 submittal regarding the Ovation Remote Node Controller (RNC). The equivalent term in Limerick-specific documents is "Ovation Remote Node Interface (RNI).
CEG has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, which was previously provided to the NRC in the Reference 2 letter. CEG has concluded that the information provided in this RAI response does not affect the bases for concluding that the proposed license amendments do not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92. In addition, CEG has concluded that the information in this RAI response letter does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendments.
This RAI response letter contains no regulatory commitments.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"
paragraph (b), CEG is notifying the Commonwealth of Pennsylvania of this supplemental letter by transmitting a copy of this letter to the designated State Official.
If you have any questions regarding this submittal, then please contact Frank Mascitelli at 267-533-5677 or Ashley Rickey at 267-533-1427.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 7 th day of March 2024.
Limerick DMP LAR RAI 4 and RAI 1.c Revision Response Docket Nos. 50-352 and 50-353 March 7, 2024 Page 3
Respectfully,
David P. Helker Sr. Manager - Licensing Constellation Energy Generation, LLC
Attachments: 1. Response to Requests for Additional Information (RAI 4, RAI 1.c Revision) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)
- 2. Revision to RAI 1.c Response
cc: USNRC Region I, Regional Administrator w/ attachments USNRC Project Manager, LGS "
USNRC Senior Resident Inspector, LGS "
Director, Bureau of Radiation Protection - Pennsylvania Department "
of Environmental Protection Attachment 1
License Amendment Request Supplement
Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353
Response to Requests for Additional Information (RAI 4, RAI 1.c Revision) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)
Limerick DMP LAR RAIs 4 and 1.c Revision Response Attachment 1 Docket Nos. 50-352 and 50-353 Page 1 of 3 March 7, 2024
By letter dated September 26, 2022 (Agencywide Documents Access and Management System Accession No. ML22269A569; non-public ), as supplemented by letters dated August 12, 2022 (ML22224A149), November 29, 2022 (ML22333A817), February 8, 2023 (ML23039A141), February 15, 2023 (ML23046A266), March 30, 2023 (ML23089A324), April 5, 2023 (ML23095A223), June 26, 2023 (ML23177A224), July 31, 2023 (ML23212B236),
September 12, 2023 (ML23255A095), October 30, 2023 (ML23303A223), and November 21, 2023 (ML23325A206), Constellation Energy Generation, LLC (CEG) submitted a License Amendment Request to revise the Licensing and Design Basis to incorporate the replacement of existing Safety-Related Analog Control Systems with a single Digital Plant Protection System (PPS).
The supplement dated September 12, 2023 replaces in its entirety the original license amendment request dated September 26, 2022. The Licensee replaced the original submittal, because it had mistakenly included proprietary information in the non-proprietary parts of the request. The original submittal was made non-public by the U.S. Nuclear Regulatory Commission (NRC) staff, because of the mistaken inclusion of proprietary information by the Licensee. With the exceptions noted by the Licensee in the letter dated September 12, 2023, the content of the replacement and the original are the same.
The NRC staff has reviewed the information provided in the license amendment request and has determined that additional information is needed to complete its review. This request for additional information was discussed with CEG on January 19 and 26, 2024, and it was agreed that a response would be provided within 30 days of the date of the NRC's January 26, 2024 email for requests for additional information (RAIs) 1, 2, and 3 and within 45 days of the date of the email for RAI 4.
Below is the Constellation Energy Generation (CEG) response to address NRC staff RAI 4.
RAI 4
In the letters dated September 26, 2022, February 8, 2023, March 30, 2023, April 5, 2023, June 26, 2023, and September 12, 2023, Constellation included documents concerning human factors engineering (e.g., human factors plan, results summary reports) that contain both export-controlled and proprietary information. In its letters, Constellation requested that information in these documents be withheld from public disclosure per Section 2.390, Public inspections, exemptions, requests for withholding, of 10 CFR. Section 2.390(b)(1)(i)(A) of 10 CFR states, in part, the first and successive pages containing information sought to be withheld must be readily visible mark at the top or other suitable marking with language substantially similar to "confidential information submitted under 10 CFR 2.390," "withhold from public disclosure under 10 CFR 2.390,"or "proprietary," to indicate the information contains information to be withheld. The marking of Official Use Only used in the human factors engineering documents do not indicate that the document contains export-control or proprietary information that Constellation is requesting to be withheld.
Section 2.390(b)(1)(i)(B) of 10 CFR states, in part, that on each page containing information sought to be withheld from public disclosure, the basis for proposing the information be withheld specified adjacent (i.e., portion markings) to the information.
The documents lack portion markings indicating the basis for withholding the Limerick DMP LAR RAIs 4 and 1.c Revision Response Attachment 1 Docket Nos. 50-352 and 50-353 Page 2 of 3 March 7, 2024
information from public release. Constellation did not provide portion markings to distinguishing between the export-controlled and proprietary information. The human factors engineering documents lack the markings required by 10 CFR 2.390(b)(i).
Additionally, proper identification of different types of information is necessary to ensure proper handling and storage of each type of information.
For each of the human factors engineering documents that contain both export-controlled and proprietary information, identify the export-controlled information.
CEG Response:
The following three DOE INL documents are identified as having both proprietary and export-controlled information (ECI):
INL/RPT-22-68995, "Human Factors Engineering Combined Functional Requirements Analysis, Function Allocation, and Task Analysis for the Limerick Control Room Upgrade: Results Summary Report," July 2022 (proprietary) submitted as Attachment 8.2 of CEG proprietary submittal ML23255A096 on September 12, 2023.
INL/RPT-23-71063, Revision 0, Limerick Safety-Related Instrumentation and Controls Upgrade, Human Factors Engineering Conceptual Verification Report, dated February 2023 (proprietary) submitted as Attachment 1 of CEG proprietary submittal ML23095A224 on April 5, 2023.
INL/RPT-23-710903, Revision 0, Limerick Safety-Related Instrumentation and Controls Upgrade, Human Factors Engineering Preliminary Validation Verification Report, dated March 2023 (proprietary) submitted as Attachment 1 of CEG proprietary submittal ML23177A225 on June 26, 2023.
The pages listed in below documents have been identified as containing ECI:
INL/RPT-22-68995
Page 40-41 HFE Graded Checklist - Assessment and Discussion Page 43-45 Table 4, Table 5 UFSAR & D3 Credited tasks Page 57 Paragraph 5.2.3 Page 58 Paragraph 5.2.5.iii Page 59-60 Paragraph 8 PPS VDUs Page 70-104 Appendix A Scenario 1-9 Functional Requirements and Function Allocation Detailed Results Page 105-156 Appendix B Scenario 1-9 Task Analysis Detailed Results Page 157-181 Appendix C Detailed Task Screening Results Page 195-212 Appendix D Conceptual Displays
INL/RPT-23-71063
Page 27 Removed Time Available and Perform Table 3 at 4.3.2.1 Limerick DMP LAR RAIs 4 and 1.c Revision Response Attachment 1 Docket Nos. 50-352 and 50-353 Page 3 of 3 March 7, 2024
Page 27 Removed time from Note 1 and 2 below Table 3 at 4.3.2.1 Page 28 Removed times from Table 4 at 4.3.2.2 Page 39 Removed times from Table 5 at 5.3.1 Page 39 Removed times from Table 5 Notes 1 and 2 Page 40,41 Removed times from Table 6 at 5.3.2 Page 47-58 Appendix A HSI Design Review Guide (Style Guide)
Page 60-129 Appendix B Displays Page 132-302 Appendix C Simulator Exercise Guide Page 304 Scenario 1 Performance Timeline Page 306 Scenario 2 Performance Timeline Page 309 Scenario 5 Performance Timeline Page 311 Scenario 6 Performance timeline Page 312 Scenario 7 performance timeline Page 314 Scenario 9 Performance Timeline Page 316-331 Appendix E Comments on Displays & Procedures Page 334-335 Appendix F - Plant Protection System Navigation Click Structure
INL/RPT-23-710903
Page 14,15 Removed time available and to perform in Table 1 at 4.3.2.1 Page 16 Removed time available and time to perform in Table 2 at 4.3.2.2 Page 29-31 Removed time details for implement and criterion Table 3 at 5.3.1. &
Note 1; 5.3.2 Table 4 Page 34 Removed Sr. Mgr Observations 5.3.3.1.2 Page 36 Removed Sr. Mgr Observations 5.3.3.2.2 Page 41 Removed Sr. Mgr Observations 5.3.3.5.2 Page 43 Removed Sr. Mgr Observations 5.3.3.6.2 Page 47 Removed Sr. Mgr Observations 5.3.3.9.2 Page 47,48 Table 5 at 5.5 Removed details of Procedures and problems identified during PV Page 53-154 Appendix B, HSI Displays Page 156-320 Appendix C, Removed Simulator Exercise Guide Page 321,322 Appendix D, Scenario 1 Removed timeline for PV team performance Page 322 Scenario 1 Removed Summary Results Page 325 Scenario 2 Removed Summary Results Page 328 Scenario 3 Removed Summary Results Page 330 Scenario 4 Removed Summary Results Page 331 Scenario 5, Removed Performance Timeline Page 332 Scenario 5, Removed Summary Results Page 333 Scenario 6 Performance Timeline Page 334 Scenario 6 Removed Summary Results Page 335 Scenario 7 Removed Performance Timeline Page 336 Scenario 7 Removed Summary Results Page 337 Scenario 8 Removed Summary Results Page 339 Scenario 9 Removed Summary Results Page 342-358 Appendix E Comments to Displays & Procedures developed for CV & PV Attachment 2
License Amendment Request Supplement
Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353
Revision to RAI 1.c Response
Limerick DMP LAR RAIs 4 and 1.c Revision Response Attachment 2 Docket Nos. 50-352 and 50-353 Page 1 of 1 March 7, 2024
Revision to RAI 1.c Response
An additional terminology difference was discovered subsequent to the Reference 4 submittal for the RAI 1.c response regarding the Ovation Remote Node Controller (RNC).
The equivalent term in Limerick-specific do cuments is "Ovation Remote Node Interface (RNI). The following four documents previously provided in the RAI 1.c CEG response are revised to include the above terminology difference as indicated by the revision bar:
6105-60019, CIM-SRNC Software Hazard Analysis Report, Rev. 4:
- The Safety System is the PPS. The Control System is the DCS. The Computer independent control system is the DPS.
- Ovation Remote Node Controller (RNC) is now Ovation Remote Node Interface (RNI).
6105-10004, SRNC FPGA Software Requirements Specification, Rev. 13:
- Ovation RNC is now Ovation RNI.
6105-20004, CIM FPGA Software Requirements Specification, Rev. 17:
- The Safety System is the PPS. The Non-safety System is the DCS. The Computer independent control system is the DPS.
- Ovation RNC is now Ovation RNI.
6105-20014, CIM FPGA Software Design Description, Rev. 5
- The Safety System is the PPS. The Non-safety System is the DCS. The Computer independent control system is the DPS.
- Ovation RNC is now Ovation RNI.