 Issue dateTitleTopic
LG-23-106, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information10 November 2023Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory InformationTime of Discovery
Fitness for Duty
Contraband
Exemption Request
ML23242A21730 August 2023Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification ChangesSafe Shutdown
Water Inventory Control
Internal Flooding
FLEX
Surveillance Frequency Control Program
Recently irradiated fuel
ML23228A09416 August 2023Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the .Probabilistic Risk Assessment
Surveillance Frequency Control Program
Time Critical Operator Action
Exemption Request
ML23202A21921 July 2023Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the .Probabilistic Risk Assessment
Time Critical Operator Action
Exemption Request
ML22182A40030 June 2022Response to RAI, Application to Implement Alternate Defense-in-Depth Categorization Process, Alternate Pressure Boundary Categorization Process & Alternate Seismic Categorization ProcessUltimate heat sink
Internal Flooding
Probabilistic Risk Assessment
RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated23 February 2022Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PSurveillance Frequency Control Program
NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2 February 2022Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle RepairsNondestructive Examination
VT-2
Foreign Material Exclusion
Through-Wall Leakage
JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments16 September 2021Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments
NMP2L2773, Company - Response to Request for Additional Information30 June 2021Company - Response to Request for Additional InformationBoric Acid
JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments11 June 2021Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments
JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting20 April 2021Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting
ML21091A0141 April 2021Response to Request for Additional Information - Relief Request I4R-24 Associated with Residual Heat Removal Heat Exchanger Category C-A and C-B ExaminationsUltimate heat sink
Non-Destructive Examination
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
VT-2
Finite Element Analysis
Design basis earthquake
Exemption Request
Earthquake
Liquid penetrant
Dissimilar Metal Weld
RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5683 September 2020Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568
ML20188A2646 July 2020Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional InformationIncorporated by reference
ML20178A51426 June 2020TS Change and Relief Requests Related to Safety Relief Valve Testing - Response to Request for Additional InformationSurveillance Frequency Control Program
ML20008D2037 January 2020Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed ...FLEX
Containment Hardened Vent
Offsite Circuit
NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-87916 October 2019Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879Boric Acid
Nondestructive Examination
ML19239A00427 August 2019Response to Request for Additional Information License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTFInternal Flooding
FLEX
Containment Hardened Vent
Offsite Circuit
ML19224B70512 August 2019Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended...Hot Short
Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
Tornado Generated Missile
Tornado Missile Protection
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Fuel cladding
Offsite Circuit
ML19224A0528 August 2019(Lgs), Units 1 and 2 - Response to Requested Supplemental Information for a One Time Alternative Request Pertaining to Dry Shield Canisters Equipped with Boral Neutron Absorber Plates
JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8804 June 2019Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880
NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants1 May 2019Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants
JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8808 January 2019Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880Commercial Grade Dedication
Nondestructive Examination
ML19004A3744 January 2019Relief Request I4R-18 Associated with Inaccessible Emergency Service Water and Residual Heat Removal Service Water Pump SupportsCoatings
Operating Basis Earthquake
RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements29 November 2018Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing RequirementsSafe Shutdown
Fitness for Duty
Health Physics Network
Nuclear Accident Reporting System
Severe Accident Management Guideline
Minimum staff
ML18305B2701 November 2018Response to Request for Additional Information - License Amendment Request for Approval of Changes to Emergency Plan Staffing RequirementsMinimum staff
RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2 May 2018Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
Authorized possession limits
ML18113A87023 April 2018Response to Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power PlantsSafe Shutdown
High winds
Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Tornado Generated Missile
Risk-Informed Steering Committee
ML18019A09119 January 2018Response to Request for Additional Information, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power PlantsSafe Shutdown
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
Fire Protection Program
ML18017A37617 January 2018End of Interval Relief Request Associated with the Third Ten-Year Lnservice Inspection (ISI) Interval
ML17340A1976 December 2017Response to Request for Additional Information: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2Reactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
ML17226A33614 August 2017Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsHot Short
Safe Shutdown
Internal Flooding
Probabilistic Risk Assessment
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography13 March 2017Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of RadiographyHydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML16263A21819 September 2016Response to Request for Additional Information Regarding Proposed Relief Request I4R-01Internal Flooding
Probabilistic Risk Assessment
Scram Discharge Volume
Large early release frequency
Maintenance Rule Program
ML16250A5496 September 2016Snubber Program Document - 4th Interval - Basis for Snubber ProgramSafe Shutdown
ML16250A5466 September 2016Response to Request for Additional Information Regarding Proposed License Amendment Concerning Snubber Technical Specification RequirementsIncorporated by reference
Surveillance Frequency Control Program
ML16194A23012 July 2016Response to Request for Additional Information Regarding Proposed Relief Request 14R-10
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure26 May 2016Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public DisclosureSafe Shutdown
High winds
Loop seal
Ultimate heat sink
Enforcement Discretion
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Design basis earthquake
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Earthquake
Fire Watch
Downpower
ML16126A0174 May 2016ACE Letter Requesting Responses Prior to Limerick Mtg 5-23-16
ML16110A39219 April 2016Response to Draft Request for Additional Information Regarding Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03Reactor Vessel Water Level
Anticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
RS-16-002, Supplemental Response to NRC Audit Review Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report13 January 2016Supplemental Response to NRC Audit Review Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation ReportFukushima Dai-Ichi
ML15236A03324 August 2015Response to Request for Additional Information Regarding Proposed Relief Request to Utilize Code Case OMN-18