ML22144A196

From kanterella
Jump to navigation Jump to search

GE-Hitachi Nuclear Energy Americas LLC - Approval of the Revised Physical Security Plan for the Vallecitos Nuclear Center
ML22144A196
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 05/26/2022
From: Duane Hardesty
NRC/NRR/DANU/UNPL
To: Martinez C
GE Hitachi Nuclear Energy
Hardesty D
References
5086, EPID L-2020-RNW-0038
Download: ML22144A196 (4)


Text

Mr. Carlos Martinez, Site Manager GE Hitachi Nuclear Energy Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586

SUBJECT:

GE-HITACHI NUCLEAR ENERGY AMERICAS LLC - APPROVAL OF THE REVISED PHYSICAL SECURITY PLAN FOR THE VALLECITOS NUCLEAR CENTER (EPID: L-2020-RNW-0038)

Dear Mr. Martinez:

By letter dated November 19, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21053A071), GE-Hitachi Nuclear Energy Americas LLC submitted a license renewal application for Facility Operating License No. R-33 for its Nuclear Test Reactor. By letter dated April 4, 2022 (ML22132A272, cover letter only), as part of the license renewal, the licensee provided an updated version of the Vallecitos Nuclear Center (VNC) Site physical security plan (PSP).

Based on its review, the U.S. Nuclear Regulatory Commission staff has determined that the VNC Site PSP is in compliance with the applicable regulations contained in Title 10 of the Code of Federal Regulations Part 73, Physical Protection of Plants and Materials, referenced in Regulatory Guide 5.59, Standard Format and Content for a Licensee Physical Security Plan for the Protection of Special Nuclear Material of Moderate or Low Strategic Significance.

We request you implement your approved program within 60 days of the date of this letter.

May 26, 2022

C. Martinez If you have any questions, please contact me at (301) 415-3724 or by electronic mail at Duane.Hardesty@nrc.gov.

Sincerely, Duane A. Hardesty, Senior Project Manager Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No.50-073 License No. R-33 cc: See next page Signed by Hardesty, Duane on 05/26/22

GE-Hitachi Nuclear Energy Americas LLC Docket No.50-073 cc:

Jeffrey Smyly, Manager Regulatory Compliance GE Hitachi Nuclear Energy Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586 Thomas McConnell, Manager Nuclear Test Reactor GE Hitachi Nuclear Energy Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586 Scott Murray, Manager Facility Licensing GE Hitachi Nuclear Energy 3901 Castle Hayne Road Wilmington, NC 28401 David Heckman, Vallecitos Reg Affairs & Licensing Lead GE Hitachi Nuclear Energy Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586 Commissioner California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814 California Department of Health ATTN: Chief Radiologic Health Branch P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research and Training Reactor Newsletter Attention: Ms. Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115

ML22144A196 NRR-106 OFFICE NRR/DANU/UNPL/PM NRR/DANU/UNPL/LA NRR/DANU/UNPL/BC NRR/DANU/UNPL/PM NAME DHardesty NParker LTran for JBorromeo DHardesty DATE 5/24/2022 5/25/2022 5/26/2022 5/26/2022