ML22202A068
Jump to navigation
Jump to search
| ML22202A068 | |
| Person / Time | |
|---|---|
| Site: | 07000754, Vallecitos Nuclear Center |
| Issue date: | 07/21/2022 |
| From: | Heckman D GE-Hitachi Nuclear Energy Americas |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| EA-14-144, M220100 | |
| Download: ML22202A068 (1) | |
Text
M220100 July 21, 2022 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001
Subject:
Implementation of Vallecitos Nuclear Center (VNC) Site Physical Security Plan
References:
- 1) VNC NRC License R-33, GEH Nuclear Test Reactor, Docket 050-00073
- 2) NRC License SNM960, Docket 07000754
- 3) NRC Confirmatory Order EA-14-144, 4/22/2015
- 4) Letter, M. Feyrer (GEH) to D. Hardesty (NRC), Nuclear Test Reactor License Renewal (R-33), dated 11/19/2020 (ML20325A194, ML20325A195, ML20325A196, ML20325A197, ML20325A201, ML20325A202, ML20325A205, ML20325A206, ML20325A207)
- 6) Letter D. Hardesty (NRC) to Carlos Martinez (GEH), GE-Hitachi Nuclear Energy Americas LLC - Approval of the Revised Physical Security Plan for the Vallecitos Nuclear Center, 5/26/2022 GE-Hitachi (GEH) Nuclear Energy Americas LLC is giving notice to the NRC that the Physical Security Plan submitted by GEH on 4/4/2022 (Ref. 5) and approved by the NRC on 5/26/2022 (Ref. 6) as a component of the Nuclear Test Reactor license renewal (Ref. 4) has been fully implemented and is now in effect at the Vallecitos Nuclear Center.
If you have any questions concerning this letter, please contact me at (925) 918-6116.
Sincerely, David Heckman, VNC Licensing Lead Vallecitos Nuclear Center cc:
NRC Region IV Administrator D. A. Hardesty, NRR/DANU/UNPL DJH 22-010 GEHitachiNuclearEnergy
David J. Heckman Regulatory Affairs and Licensing Lead 6705 Vallecitos Road Sunol, CA 94586 USA T (925) 918-6116 David.Heckman1@ge.com
David Heckman Digitally signed by David Heckman Date: 2022.07.20 16:32:34
-07'00'