ND-22-0002, ITAAC Closure Notification on Completion of 2.3.09.04b (Index Number 428)
| ML22132A266 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/12/2022 |
| From: | Coleman J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ND-22-0002 | |
| Download: ML22132A266 (8) | |
Text
A Southern Nuclear MAY 1 2 2022 Docket No.:
52-025 Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6926 tel ND-22-0002 10 CFR 52.99(c)(1)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.3.09.04b [Index Number 4281 Ladies and Gentlemen:
In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)
Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.09.04b [Index Number 4281 to verify that the Containment Hydrogen Control System (VLS) igniters energize after receiving a signal from the Diverse Actuation System (DAS). The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 1 O CFR Part 52", which is endorsed by the NRC in Regulatory Guide 1.215.
This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 1 O CFR 52.99.
If there are any questions, please contact Kelli Roberts at 706-848-6991.
Respectfully submitted,
~m~
Regulatory Affairs Director Vogtle 3 & 4
Enclosure:
JMC/JTK/sfr Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.09.04b [Index Number 4281
U.S. Nuclear Regulatory Commission ND-22-0002 Page 2 of 3 To:
Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall
U.S. Nuclear Regulatory Commission ND-22-0002 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S. L. Zwack Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham
U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 1 of 5 Southern Nuclear Operating Company ND-22-0002 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.09.04b [Index Number 428]
U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 2 of 5 IT AAC Statement Design Commitment 4.b) The components identified in Table 2.3.9-2 perform the listed function after receiving a manual signal from DAS.
Inspections/Tests/ Analyses Testing will be performed on the igniters using the DAS controls.
Acceptance Criteria The igniters energize after receiving a signal from DAS.
ITAAC Determination Basis Testing was performed in accordance with Unit 3 preoperational test procedures listed in Reference 1, to confirm the components identified in Combined License (COL) Appendix C Table 2.3.9-2 (Attachment A) performed the listed function after receiving a manual signal from the Diverse Actuation System (DAS).
Testing was performed in two parts to verify the igniters energize after receiving a signal from DAS. In the first preoperational test procedure documented in Reference 1, Hydrogen Igniter Control Switches 3-DAS-HS213 and 3-DAS-HS214, at the DAS control panel in the Main Control Room (MCR) were switched to the ON position. A digital multimeter was then used to verify the Containment Hydrogen Igniter control relays in Hydrogen Igniter Control Panels 3-VLS-JC-001 (Group 1 ), and 3-VLS-JC-002 (Group 2), were energized. The Hydrogen Igniter Control Switches were then switched to the OFF position.
In the second part, the other preoperational test procedure documented in Reference 1 placed Hydrogen lgniters switches VLS-EH-GR1 (Group 1) and VLS-EH-GR2 (Group 2) to the ON position. The same relays verified as energized in the first part of the test were also verified as energized in this procedure; relays in Hydrogen Igniter Control Panels 3-VLS-JC-001 (Group 1 ),
and 3-VLS-JC-002 (Group 2). An inspection verified that each of the sixty-six igniters identified in Attachment A were energized by recording an overall increase of igniter temperatures at 1 O second intervals for 90 seconds. Switches VLS-EH-GR1 (Group 1) and VLS-EH-GR2 (Group 2), were then placed to the OFF position.
Unit 3 preoperational test results as identified in Reference 1 confirmed the igniters energize after receiving a signal from DAS.
Reference 1 is available for NRC inspection as part of Unit 3 ITAAC 2.3.09.04b Completion Package (Reference 2).
U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 3 of 5 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.09.04b (Reference 2) and is available for NRC review.
IT AAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.09.04b was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.
Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed ITAAC compliant condition in accordance with approved plant programs and procedures.
References (available for NRC inspection)
- 1. SV3-VLS-ITR-800428, Rev. 0, "Unit 3 Containment Hydrogen Control (VLS) Igniter Functionality Test from Diverse Actuation System (DAS): ITAAC 2.3.09.04b, Item 4.b)
NRC Index Number: 428"
- 2. 2.3.09.04b-U3-CP-Rev0 "ITAAC Completion Package"
U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 4 of 5 Attachment A
- E f
xcerot rom COLA,ppend1x C Ta bl e 2.3.9-2
- Equipment Name
- Tag Number
- Function Hydrogen Igniter 01 VLS-EH-01 Energize Hydrogen Igniter 02 VLS-EH-02 Energize Hydrogen Igniter 03 VLS-EH-03 Energize Hydrogen Igniter 04 VLS-EH-04 Energize Hydrogen Igniter 05 VLS-EH-05 Energize Hydrogen Igniter 06 VLS-EH-06 Energize Hydrogen Igniter 07 VLS-EH-07 Energize Hydrogen Igniter 08 VLS-EH-08 Energize Hydrogen Igniter 09 VLS-EH-09 Energize Hydrogen Igniter 1 0 VLS-EH-10 Energize Hydrogen Igniter 11 VLS-EH-11 Energize Hydrogen Igniter 12 VLS-EH-12 Energize Hydrogen Igniter 13 VLS-EH-13 Energize Hydrogen Igniter 14 VLS-EH-14 Energize Hydrogen Igniter 15 VLS-EH-15 Energize Hydrogen Igniter 16 VLS-EH-16 Energize Hydrogen Igniter 17 VLS-EH-17 Energize Hydrogen Igniter 18 VLS-EH-18 Energize Hydrogen Igniter 19 VLS-EH-19 Energize Hydrogen Igniter 20 VLS-EH-20 Energize Hydrogen Igniter 21 VLS-EH-21 Energize Hydrogen Igniter 22 VLS-EH-22 Energize Hydrogen Igniter 23 VLS-EH-23 Energize Hydrogen Igniter 24 VLS-EH-24 Energize Hydrogen Igniter 25 VLS-EH-25 Energize Hydrogen Igniter 26 VLS-EH-26 Energize Hydrogen Igniter 27 VLS-EH-27 Energize Hydrogen Igniter 28 VLS-EH-28 Energize Hydrogen Igniter 29 VLS-EH-29 Energize Hydrogen Igniter 30 VLS-EH-30 Energize Hydrogen Igniter 31 VLS-EH-31 Energize Hydrogen Igniter 32 VLS-EH-32 Energize Hydrogen Igniter 33 VLS-EH-33 Energize Hydrogen Igniter 34 VLS-EH-34 Energize Hydrogen Igniter 35 VLS-EH-35 Energize Hydrogen Igniter 36 VLS-EH-36 Energize Hydrogen Igniter 37 VLS-EH-37 Energize
- Power Group Number 1
2 1
2 1
2 2
1 1
2 2
1 1
2 2
1 2
1 2
2 1
1 2
2 2
2 1
1 1
2 1
1 2
1 1
2 1
U.S. Nuclear Regulatory Commission ND-22-0002 Enclosure Page 5 of 5 Attachment A (con't)
- Excerot from COL Appendix C Table 2.3.9-2
- Equipment Name
- Tag Number '
- Function Hydrogen Igniter 38 VLS-EH-38 Energize Hydrogen Igniter 39 VLS-EH-39 Energize Hydrogen Igniter 40 VLS-EH-40 Energize Hydrogen Igniter 41 VLS-EH-41 Energize Hydrogen Igniter 42 VLS-EH-42 Energize Hydrogen Igniter 43 VLS-EH-43 Energize Hydrogen Igniter 44 VLS-EH-44 Energize Hydrogen Igniter 45 VLS-EH-45 Energize Hydrogen Igniter 46 VLS-EH-46 Energize Hydrogen Igniter 47 VLS-EH-47 Energize Hydrogen Igniter 48 VLS-EH-48 Energize Hydrogen Igniter 49 VLS-EH-49 Energize Hydrogen Igniter 50 VLS-EH-50 Energize Hydrogen Igniter 51 VLS-EH-51 Energize Hydrogen Igniter 52 VLS-EH-52 Energize Hydrogen Igniter 53 VLS-EH-53 Energize Hydrogen Igniter 54 VLS-EH-54 Energize Hydrogen Igniter 55 VLS-EH-55 Energize Hydrogen Igniter 56 VLS-EH-56 Energize Hydrogen Igniter 57 VLS-EH-57 Energize Hydrogen Igniter 58 VLS-EH-58 Energize Hydrogen Igniter 59 VLS-EH-59 Energize Hydrogen Igniter 60 VLS-EH-60 Energize Hydrogen Igniter 61 VLS-EH-61 Energize Hydrogen Igniter 62 VLS-EH-62 Energize Hydrogen Igniter 63 VLS-EH-63 Energize Hydrogen Igniter 64 VLS-EH-64 Energize Hydrogen Igniter 65 VLS-EH-65 Energize Hydrogen Igniter 66 VLS-EH-66 Energize
- Power Group Number 2
1 2
2 1
1 1
2 2
1 2
1 2
1 2
2 1
1 2
2 1
2 1
1 2
1 2
1 2