ITAAC Closure Notification on Completion of ITAAC 3.3.00.05b (Index Number 785)
ML22108A294
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/18/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0139
Download: ML22108A294 (7)


Text

.A Southern Nuclear Jamie M. Coleman Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6926 tel Docket No.: 52-025 ND-22-0139 APR 18 2022 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.05b (Index Number 785]

Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.05b [Index Number 785]. An inspection of the boundaries between the rooms identified in VEGP Unit 3 Combined License (COL) Appendix C Table 3.3-2 was performed to demonstrate that the boundaries between these rooms were designed and constructed to prevent flooding of rooms that contain safety-related equipment. The closure process for this ITAAC is based on the guidance described in NEl-08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52", which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli A. Roberts at 706-848-6991.

Respectfully submitted, Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.05b [Index Number 785]

JMC/JRV/sfr

U.S. Nuclear Regulatory Commission ND-22-0139 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01 .02.06 cc:

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0139 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0139 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0139 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.05b [Index Number 785]

U.S. Nuclear Regulatory Commission ND-22-0139 Enclosure Page 2 of 4 ITAAC Statement Design Commitment:

5.b) The boundaries between rooms identified in Table 3.3-2 of the auxiliary building are designed to prevent flooding of rooms that contain safety-related equipment.

Inspections, Tests, Analyses:

An inspection of the auxiliary building rooms will be performed.

Acceptance Criteria:

A report exists that confirms floors and walls as identified on Table 3.3-2 have provisions to prevent flooding between rooms up to the maximum flood levels for each room defined in Table 3.3-2.

ITAAC Determination Basis An inspection of the boundaries between the rooms identified in Vogtle Electric Generating Plant (VEGP) Unit 3 Combined License (COL) Appendix C Table 3.3-2 (Attachment A), was performed to demonstrate that the boundaries between these rooms were designed and constructed to prevent flooding of rooms that contain safety-related equipment.

Inspections were performed of auxiliary building rooms to demonstrate that floors and walls as identified in Table 3.3-2 have provisions to prevent flooding between rooms up to the maximum flood levels for each room defined in COL Appendix C Table 3.3-2 (Attachment A). An inspection plan was prepared to identify all openings and penetrations on the floors and walls up to the maximum flood levels of the rooms. Each as-built opening or penetration observed and measured to be below the corresponding maximum flood level was inspected to ensure that the openings and penetrations were sealed as specified in the design documents. A final walkdown of the floors and walls was performed to ensure that all openings and penetrations were identified and inspected.

The inspection plan and results of the visual inspection of the floors and walls are documented in the Unit 3 Principal Closure Document (PCD) (Reference 1), and confirms floors and walls as identified on COL Appendix C Table 3.3-2 have provisions to prevent flooding between rooms up to the maximum flood levels for each room defined in COL Appendix C Table 3.3-2 (Attachment A).

Reference 1 is available for NRC inspection as part of the Unit 3 ITAAC 3.3.00.0Sb Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 3.3.00.0Sb (Reference 2) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-22-0139 Enclosure Page 3 of 4 ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.05b was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-1000-ITR-800785, Rev. 1, "Unit 3 Inspections of Aux Bldg. Safety-Related Equipment Rooms Flood Prevention: ITAAC 3.3.00.05b, NRC Index Number: 785"
2. 3.3.00.05b-U3-CP-Rev0, ITAAC Completion Package
3. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"

U.S. Nuclear Regulatory Commission ND-22-0139 Enclosure Page 4 of 4 Attachment A COL Appendix C Table 3.3-2 Table 3.3-2 Nuclear Island Building Room Boundaries Required to Have Flood Barrier Aoors and Walls Between Room Number to Room Number Boundary/ Room with Postulated Maximum Flood Level (Inches) Flooding Source Adjacent Room Floor/36 12306 12211 Floor/3 12303 12203/12207 Floor/3 12313 12203/12207 Floor/1 12300 12201/12202/12207 12203/12204/12205 Floor/3 12312 12212 Wa1V36 12306 12305 Floor/1 12401 12301 /12302/12303 12312/12313 Wa1V1 12401 12411/12412 Floor/36 12404 12304 Ftoor/4 12405 12305 Floor/36 12406 12306 Wall/36 12404 12401 Wall/30 12452 12421 Ftoor/3 12501 12401/12411/12412 Aoor/3 12555 12421/12423/12422 Wall/168 12156 12111/12112 Wa1V76.5 12158 12111 Wa1V132 12258 12211/12212