ND-22-0228, ITAAC Closure Notification on Completion of ITAAC 3.2.00.05 (Index Number 752)

From kanterella
(Redirected from ML22103A087)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 3.2.00.05 (Index Number 752)
ML22103A087
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/13/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0228
Download: ML22103A087 (6)


Text

A Southern Nuclear Jamie M. Coleman Regulatory Affairs Vogtle 3 & 4 7825 River Road Waynesboro, GA 307520 706-848-6926 te l Docket No.: 52-025 APR 1 3 2022 ND-22-0228 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.2.00.05 (Index Number 7521 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.2.00.05 (Index 7521. This ITAAC confirms that the Remote Shutdown Workstation (RSW) includes a reactor operator workstation(s) from which licensed operators perform remote shutdown operations. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted, Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.2.00.05 [Index Number 7521 JMC/MSV/sfr

U.S. Nuclear Regulatory Commission ND-22-0228 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J.C. Haswell Document Services RTYPE: VND.LI .L06 File AR .01 .02.06 Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0228 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0228 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-22-0228 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.2.00.05 [Index Number 752]

U.S. Nuclear Regulatory Commission ND-22-0228 Enclosure Page 2 of 3 IT AAC Statement Design Commitment

5. The RSW includes reactor operator workstation(s) from which licensed operators perform remote shutdown operations.

Inspections/Tests/Analyses An inspection of the RSW will be performed.

Acceptance Criteria The RSW includes reactor operator workstation(s) .

ITAAC Determination Basis An inspection of the Remote Shutdown Workstation (RSW) was performed to verify that the RSW includes a reactor operator workstation(s) from which licensed operators perform remote shutdown operations.

The inspection utilized approved construction drawings to perform walkdown inspections of the Unit 3 RSW reactor operator workstation(s). The walkdown inspections compared the as-built reactor operator workstation(s) with Reference 1 and 2 construction drawings to confirm that the RSW includes a reactor operator workstation(s).

The Unit 3 walkdown inspection results are documented the Principal Closure Document SV3-OCS-ITR-800752 (Reference 3) supporting the ITAAC 3.2.00.05 Completion Package (Reference 4) and confirmed that the RSW includes a reactor operator workstation(s).

References 1 through 3 are available for NRC inspection as part of ITAAC 3.2.00.05 Completion Package (Reference 4).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 3.2.00.05 (Reference 4) and is available for NRC review.

IT AAC Completion Statement Based on the above information , SNC hereby notifies the NRC that ITAAC 3.2.00.05 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed , ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-22-0228 Enclosure Page 3 of 3 References (available for NRC inspection)

1. SV3-JC01-V1 -100, Rev.2, "AP1000 Remote Shutdown Room Layout Top View" (Security Related Information)
2. SV3-JC01-V1-120, Rev.3, "AP1000 Remote Shutdown Workstation Panel Layout"
3. Unit 3 Principal Closure Document SV3-OCS-ITR-800752 Rev O "Unit 3 HFE Remote Shutdown Workstation Reactor Operator Workstation(s): ITAAC 3.2.00.05" (NRC Index Number 752)
4. 3.2.00.05-U3-CP-Rev0, ITAAC Completion Package